Sullivan / Thompson Masonry & Restoratio
- Based in
- San Francisco
- On San Francisco permits
- Apr 2016 to Apr 2024
- Last 24 months
- 0 permits filed
6 permits since 2000: 2 completed, 1 in progress, 3 never finaled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 4, 2024 | In progress issued Apr 2024 | 1000 Van Ness Av | pinning terra cotta on exterior of bldg as identified location by civil engineer. all three sides of bldg.Details
pinning terra cotta on exterior of bldg as identified location by civil engineer. all three sides of bldg. | $948,000 |
| Sep 10, 2021 | Never finaled issued Feb 2022, no final | 57 Post St | in-kind facade masonry repairs of east elevation of historic mechanics institute. full assessment of necessary repair extents via scaffold removal of loose materials, followed by in-kind repair of deteriorated plaster parge coat,loose bride tie backs and lintels. e windows painted in place.Details
in-kind facade masonry repairs of east elevation of historic mechanics institute. full assessment of necessary repair extents via scaffold removal of loose materials, followed by in-kind repair of deteriorated plaster parge coat,loose bride tie backs and lintels. e windows painted in place. | $750,000 |
| Jul 29, 2021 | Completed final sign-off Dec 2021 | 1201 Ortega St | school roof cupola voluntary structural strengthening. no exterior changes, only structural work at the interior.Details
school roof cupola voluntary structural strengthening. no exterior changes, only structural work at the interior. | $15,430 |
| Apr 8, 2021 | Completed final sign-off Jun 2021 | 1900 Cesar Chavez St | (1) remove damaged/displace brick, expose rebar treat w/rust inhibitor @ blind plaster replace brick (2) remove replace split displaced brick. replace to match (3) remove one course of brick expose lintel clean and treat rust with inhibitor. comply with nov.Details
(1) remove damaged/displace brick, expose rebar treat w/rust inhibitor @ blind plaster replace brick (2) remove replace split displaced brick. replace to match (3) remove one course of brick expose lintel clean and treat rust with inhibitor. comply with nov. | $5,500 |
| Feb 16, 2021 | Never finaled issued Jul 2021, no final | 625 Market St | ext facade: stone cladding repair spalls, add pins to broken stones,expoxy inject cracks.window wall repairs:replace (e) seals,weatherstripping,paint panels and mullions.fire escape repairs:scrape off loose and flaking paint,replace broken connections,replace missing bolts,coat with hi-performanceDetails
ext facade: stone cladding repair spalls, add pins to broken stones,expoxy inject cracks.window wall repairs:replace (e) seals,weatherstripping,paint panels and mullions.fire escape repairs:scrape off loose and flaking paint,replace broken connections,replace missing bolts,coat with hi-performance | $1,871,000 |
| Apr 7, 2016 | Never finaled issued Sep 2016, no final | 2201 Broadway | voluntary seismic improvements to existing non structural masonry veneerDetails
voluntary seismic improvements to existing non structural masonry veneer | $150,000 |