Straightedge Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2012 to Jul 2026
- Last 24 months
- 2 permits filed
48 permits since 2000: 37 completed, 2 in progress, 8 never finaled, 1 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 28, 2026 | In progress issued Aug 2026 | 1021 Cole St | provide excavation sequence and shoring to accomodate foundation installation, reference bpa # 202512182133Details
provide excavation sequence and shoring to accomodate foundation installation, reference bpa # 202512182133 | $25,000 |
| Jan 7, 2026 | In progress issued Jul 2026 | 1021 Cole St | partial remodel with attached single car garage. partial demolition of (e) lower floor slab & construction of 355 sf of unconditioned space to habitable area. addition of 4 roof dormers & a skylight. remodel (e) rear deck & new 72 sf deck @ 4th floor level.Details
partial remodel with attached single car garage. partial demolition of (e) lower floor slab & construction of 355 sf of unconditioned space to habitable area. addition of 4 roof dormers & a skylight. remodel (e) rear deck & new 72 sf deck @ 4th floor level. | $500,000 |
| Jun 8, 2023 | Never finaled issued Jun 2023, no final | 894 Union St | remodel (e) kitchen and two bathrooms. replace all knob and tube wiring. add insulation, new tile plumbing fixtures, new cabinets.Details
remodel (e) kitchen and two bathrooms. replace all knob and tube wiring. add insulation, new tile plumbing fixtures, new cabinets. | $20,000 |
| Jun 6, 2023 | Never finaled issued Jun 2023, no final | 896 Union St | remodel existing 2 bath and 1 kitchen. upgrade knob and tube wiring. upgrade plumbing to code. bathrooms: replace finishes, fixtures, and vanities in-kind. kitchen: replace cabinets, countertops, and applicances in-kind.Details
remodel existing 2 bath and 1 kitchen. upgrade knob and tube wiring. upgrade plumbing to code. bathrooms: replace finishes, fixtures, and vanities in-kind. kitchen: replace cabinets, countertops, and applicances in-kind. | $16,000 |
| Feb 23, 2023 | Completed final sign-off Aug 2023 | 1742 Filbert St | ref pa# 202202037266, upgrade of existing grade level exit pasage way to a (n) 2-hr rated exit through existing 3-unit residential bldg to e rear yard area. work includes blocking e window & door openings along e passageway n fire sprinkler system for n exit passageway under separate permit.Details
ref pa# 202202037266, upgrade of existing grade level exit pasage way to a (n) 2-hr rated exit through existing 3-unit residential bldg to e rear yard area. work includes blocking e window & door openings along e passageway n fire sprinkler system for n exit passageway under separate permit. | $25,000 |
| Feb 15, 2023 | Completed final sign-off Jan 2025 | 75 Mountain Spring Av | revision to permit 202102184901. remove all interior retaining wall work (west) on garage level. structural revision only.Details
revision to permit 202102184901. remove all interior retaining wall work (west) on garage level. structural revision only. | |
| May 20, 2022 | Completed final sign-off Jul 2022 | 1742 Filbert St | replace (e) windwos, leaking, and mold on interior. replace in kind with wood clad windows. 14 windows in front only.Details
replace (e) windwos, leaking, and mold on interior. replace in kind with wood clad windows. 14 windows in front only. | $12,000 |
| Apr 12, 2022 | Completed final sign-off Sep 2022 | 1742 Filbert St | reinforce roof rafters to accommodate future roof deck. roof deck under separate permit application 202203220472.Details
reinforce roof rafters to accommodate future roof deck. roof deck under separate permit application 202203220472. | $12,000 |
| Mar 22, 2022 | Completed final sign-off Aug 2023 | 1742 Filbert St | new 326 sf roof deck with metal spiral staircase.Details
new 326 sf roof deck with metal spiral staircase. | $20,000 |
| Dec 6, 2021 | Completed final sign-off Jul 2023 | 1742 Filbert St | remove wall between kitchen and dining room on 2nd, 3rd & 4th floors. add new bath on 2nd, 3rd & 4th floors.Details
remove wall between kitchen and dining room on 2nd, 3rd & 4th floors. add new bath on 2nd, 3rd & 4th floors. | $30,000 |
| Jun 1, 2021 | Never finaled issued Jun 2021, no final | 658 Wisconsin St | renovate (e) kitchen with new applianeces, plumbing & light fixtures. new floor and wall surfaces. new window in rear facade.Details
renovate (e) kitchen with new applianeces, plumbing & light fixtures. new floor and wall surfaces. new window in rear facade. | $15,000 |
| Feb 22, 2021 | Completed final sign-off Jan 2022 | 75 Mountain Spring Av | stucco repair around all windows and back wall.Details
stucco repair around all windows and back wall. | $6,000 |
| Feb 18, 2021 | Completed final sign-off Jan 2025 | 75 Mountain Spring Av | revision to pa# 201907014785 & 202012030128 (e) window/door systems replaced w/(n) dual glazed systems (e) front facade solid guardrail & handrail removed & replaced w/(n) metal at 42" above finished balcony w/(n) cantilevered balcony construction @ front facade; remove (e) front entry concrete stepDetails
revision to pa# 201907014785 & 202012030128 (e) window/door systems replaced w/(n) dual glazed systems (e) front facade solid guardrail & handrail removed & replaced w/(n) metal at 42" above finished balcony w/(n) cantilevered balcony construction @ front facade; remove (e) front entry concrete step | $150,000 |
| Dec 3, 2020 | Completed final sign-off Jan 2022 | 75 Mountain Spring Av | replace (e) leaking windows in-kind, no opening alteration. 18 windows total, 6 - street facing. existing and porposed architectual grade aluminumDetails
replace (e) leaking windows in-kind, no opening alteration. 18 windows total, 6 - street facing. existing and porposed architectual grade aluminum | $15,000 |
| Jul 6, 2020 | Completed final sign-off Nov 2020 | 3525 Cabrillo St | replacing e kitchen cabinets, countertop. update eletrical & plumbingDetails
replacing e kitchen cabinets, countertop. update eletrical & plumbing | $4,000 |
| Dec 31, 2019 | Completed final sign-off Jun 2023 | 4227 24th St | interior & exterior alterations include adding one story to the (e) 2 story home,expanding of all floors toward rear property line, news and doors, three additional bathrooms, all new electrical, plumbing & heating systems upgraded structural work. no change to use or occupancy.Details
interior & exterior alterations include adding one story to the (e) 2 story home,expanding of all floors toward rear property line, news and doors, three additional bathrooms, all new electrical, plumbing & heating systems upgraded structural work. no change to use or occupancy. | $400,000 |
| Jul 1, 2019 | Completed final sign-off Jan 2022 | 75 Mountain Spring Av | partial interior remodel an (e) 3 story, single family residence w/attaached 2 car garage. project scope includes remodel of (e) m bathroom @ 3rd fl w/(n) interior wall layout, fixtures & finishes and 2(n) windows to replace (e) window & exterior door. remodel of (e) baths 1 & 2, powder rooms 1 & 2.Details
partial interior remodel an (e) 3 story, single family residence w/attaached 2 car garage. project scope includes remodel of (e) m bathroom @ 3rd fl w/(n) interior wall layout, fixtures & finishes and 2(n) windows to replace (e) window & exterior door. remodel of (e) baths 1 & 2, powder rooms 1 & 2. | $100,000 |
| Aug 29, 2018 | Completed final sign-off Sep 2020 | 615 Wisconsin St | temporary shoring for permit app#201806051020Details
temporary shoring for permit app#201806051020 | |
| Jan 23, 2018 | Completed final sign-off Jun 2018 | 880 Haight St | replace e brick foundation with reinforced concrete foundation. partial structural strengthening of crawl space. add new shearwalls reinforce gravity spportsDetails
replace e brick foundation with reinforced concrete foundation. partial structural strengthening of crawl space. add new shearwalls reinforce gravity spports | $50,000 |
| Nov 28, 2017 | Never finaled issued Nov 2017, no final | 880 Haight St | reroofing.Details
reroofing. | $9,000 |
| Sep 21, 2017 | Completed final sign-off Jun 2018 | 880 Haight St | remove and replace existing facade where damaged water intruision and wood decay especially around window in kind. existing front windows replace in kind.Details
remove and replace existing facade where damaged water intruision and wood decay especially around window in kind. existing front windows replace in kind. | $12,000 |
| Aug 17, 2017 | Never finaled issued Aug 2017, no final | 660 Wisconsin St | upper unit - new kitchen cabinets, update elect. & plumbing in kitchen only, new drywall , insulation where neededDetails
upper unit - new kitchen cabinets, update elect. & plumbing in kitchen only, new drywall , insulation where needed | $25,000 |
| Mar 8, 2017 | Completed final sign-off Mar 2018 | 222 Tingley St | addition of ground story @ rear, addition on 2nd story @ rear. (n) bath, relocated kitchen & staircaseDetails
addition of ground story @ rear, addition on 2nd story @ rear. (n) bath, relocated kitchen & staircase | $60,000 |
| Dec 12, 2016 | Completed final sign-off Nov 2017 | 1750 Taylor St | #2002 - remodel (e) single family condo including new kitchen, bathrooms, bedrooms and living area. replace (e) all (e) glazing, new fau w/air conditioning, no change in e unit size, glazing. replaced in kind. ref pa 201607192679Details
#2002 - remodel (e) single family condo including new kitchen, bathrooms, bedrooms and living area. replace (e) all (e) glazing, new fau w/air conditioning, no change in e unit size, glazing. replaced in kind. ref pa 201607192679 | $225,000 |
| Oct 31, 2016 | Completed final sign-off May 2017 | 2225 Pacific Av | removal of wall in dining rm grnd flr. widening of wall openings in kitchen - grnd & middle flrs. remodel of 2 kitchens, 2 master bathrooms. relocate of hot water heaters (2) & 2 furnaces. overall paint and floor refinishDetails
removal of wall in dining rm grnd flr. widening of wall openings in kitchen - grnd & middle flrs. remodel of 2 kitchens, 2 master bathrooms. relocate of hot water heaters (2) & 2 furnaces. overall paint and floor refinish | $90,000 |
| Sep 12, 2016 | Completed final sign-off Sep 2017 | 951 Monterey Bl | repair damaged stucco in front, leaking stucco near garage.Details
repair damaged stucco in front, leaking stucco near garage. | $8,000 |
| Jul 19, 2016 | Never finaled issued Jul 2016, no final | 1750 Taylor St | demo interior unit down to studs.Details
demo interior unit down to studs. | $8,000 |
| Jan 4, 2016 | Completed final sign-off Aug 2016 | 668 23rd Av | exposing walls & ceiling for re-wiring and re-plumbing only. . approx. 500 sq.ft.Details
exposing walls & ceiling for re-wiring and re-plumbing only. . approx. 500 sq.ft. | $6,500 |
| Jul 23, 2015 | Completed final sign-off Sep 2015 | 222 Tingley St | replace leaking stucco in kind in front of houseDetails
replace leaking stucco in kind in front of house | $5,000 |
| Jul 13, 2015 | Completed final sign-off Jun 2018 | 346 Fair Oaks St | replace in-kind new tile deck (existing deck over garage). remove existing tile. no plumbing or electricalDetails
replace in-kind new tile deck (existing deck over garage). remove existing tile. no plumbing or electrical | $20,000 |
| May 29, 2015 | Completed final sign-off Oct 2015 | 615 Wisconsin St | bath remodel; new tile, new elect and plumbing; to comply with cec150.0(k)5Details
bath remodel; new tile, new elect and plumbing; to comply with cec150.0(k)5 | $20,000 |
| Feb 12, 2015 | Completed final sign-off Apr 2015 | 222 Tingley St | revision to 201502027273. remove ground floor posts and add bearing wallDetails
revision to 201502027273. remove ground floor posts and add bearing wall | $10,000 |
| Feb 2, 2015 | Completed final sign-off May 2015 | 222 Tingley St | partial foundation replacement per plan. move 2nd floor partition wall per plan. remove 2nd floor bearing wall and repalce with new beams.Details
partial foundation replacement per plan. move 2nd floor partition wall per plan. remove 2nd floor bearing wall and repalce with new beams. | $40,000 |
| Jan 21, 2015 | Completed final sign-off Feb 2015 | 430 Burnett Av | as per notice of violation. replace rusted connection from stringer. replace 4 water damaged wood and posts. comply with nov 3201412153 item #7. not to exceed 50% of stairs.Details
as per notice of violation. replace rusted connection from stringer. replace 4 water damaged wood and posts. comply with nov 3201412153 item #7. not to exceed 50% of stairs. | $5,900 |
| Nov 21, 2014 | Never finaled issued Nov 2014, no final | 222 Tingley St | bathroom remodel, kitchen remodel, new cabinet, new countertop, new electrical (bath) new tile, new fixtures, new plumbing. no wall modification, no structural.Details
bathroom remodel, kitchen remodel, new cabinet, new countertop, new electrical (bath) new tile, new fixtures, new plumbing. no wall modification, no structural. | $15,000 |
| Sep 25, 2014 | Completed final sign-off Apr 2015 | 327 Staples Av | roof deck over the existing 1st floor kitchen roof, 188 sfDetails
roof deck over the existing 1st floor kitchen roof, 188 sf | $20,000 |
| Jul 22, 2014 | Completed final sign-off Feb 2015 | 542 03rd Av | interior alteration only 2 full bath remodel on the third floor. one new half bath on 2nd floor and kitchen remodel. new windows on 2nd and 3rd floor not visible from street to be replaced in kind.Details
interior alteration only 2 full bath remodel on the third floor. one new half bath on 2nd floor and kitchen remodel. new windows on 2nd and 3rd floor not visible from street to be replaced in kind. | $96,500 |
| Jul 22, 2014 | Never finaled issued Jul 2014, no final | 542 03rd Av | replace windows at front with marvin wood sash within existing opennings.Details
replace windows at front with marvin wood sash within existing opennings. | $3,500 |
| Jun 12, 2014 | Completed final sign-off Sep 2014 | 381 Noe St | remodel & enlarge (e) bathroom, reconfigure adjacent hall and closets work in lower unit onlyDetails
remodel & enlarge (e) bathroom, reconfigure adjacent hall and closets work in lower unit only | $21,250 |
| Mar 25, 2014 | Completed final sign-off Sep 2014 | 625 47th Av | revision to 201402078012. enlarge rear window. window is on south elevation at rear yard. not visible from the street.Details
revision to 201402078012. enlarge rear window. window is on south elevation at rear yard. not visible from the street. | $750 |
| Feb 7, 2014 | Expired or cancelled expired May 2017 | 625 47th Av | remodel 3 bthrooms & kitchen, new windows, demo interior walls, new roof deck, new electrical new plumbing.Details
remodel 3 bthrooms & kitchen, new windows, demo interior walls, new roof deck, new electrical new plumbing. | $150,000 |
| Oct 2, 2013 | Completed final sign-off Dec 2013 | 758 Haight St | work in unit #3: demo kitchen and bathroom, new cabinets fixtures, update electrical and plumbing. lighting to comply with cec 150 (k)Details
work in unit #3: demo kitchen and bathroom, new cabinets fixtures, update electrical and plumbing. lighting to comply with cec 150 (k) | $50,000 |
| Sep 27, 2013 | Completed final sign-off Dec 2013 | 741 North Point St | demo existing kitchen & bathroom. new tile, cabinets minor plumbing & electrical. at front building top unit. lighting to comply with cec 150(k)Details
demo existing kitchen & bathroom. new tile, cabinets minor plumbing & electrical. at front building top unit. lighting to comply with cec 150(k) | $20,000 |
| Jun 12, 2013 | Completed final sign-off Aug 2013 | 658 Wisconsin St | bathroom remodel, no walls removed, new tile, new fixtures, new high efficency can lights, existing fan in bathroomDetails
bathroom remodel, no walls removed, new tile, new fixtures, new high efficency can lights, existing fan in bathroom | $25,000 |
| Aug 10, 2012 | Completed final sign-off Nov 2012 | 658 Wisconsin St | remodel bath on 2nd floor - new toilet tub, vanity, tile.Details
remodel bath on 2nd floor - new toilet tub, vanity, tile. | $25,000 |
| Jul 6, 2012 | Completed final sign-off Sep 2012 | 327 Staples Av | remodel bathroom, no structural, no walls moved, lighting will comply with title 24.Details
remodel bathroom, no structural, no walls moved, lighting will comply with title 24. | $18,000 |
| Jun 26, 2012 | Completed final sign-off Dec 2013 | 1083 Clay St | extend kitchen, new counter tops, back splash (no removal or addition of partitions) cabinets - finishes only some minor electrical + plumbing.Details
extend kitchen, new counter tops, back splash (no removal or addition of partitions) cabinets - finishes only some minor electrical + plumbing. | $14,000 |
| Mar 15, 2012 | Completed final sign-off Feb 2013 | 660 Wisconsin St | bath remodel, new vanity, take out tub, new shower, new tile.Details
bath remodel, new vanity, take out tub, new shower, new tile. | $25,000 |