Stockham Construction
- Based in
- Cotati
- On San Francisco permits
- Aug 2010 to Jan 2026
- Last 24 months
- 7 permits filed
102 permits since 2000: 66 completed, 2 in progress, 34 never finaled.
Of the 34 never-finaled permits, 3 are 3 to 5 years old, 8 are 5 to 10 years old, 23 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 102.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 28, 2026 | Completed final sign-off Apr 2026 | 120 Kearny St | interior tenant improvement 32nd fl. provide new accessible single use gender neutral restroomDetails
interior tenant improvement 32nd fl. provide new accessible single use gender neutral restroom | $20,000 |
| May 8, 2025 | In progress issued May 2025 | 1 Sansome St | 22nd floor speculative office suite t.i. in an existing hi-rise downtown building. work to include new partitions, millwork, doors, glazing, ceiling and finishes.Details
22nd floor speculative office suite t.i. in an existing hi-rise downtown building. work to include new partitions, millwork, doors, glazing, ceiling and finishes. | $296,540 |
| Mar 26, 2025 | Completed final sign-off May 2026 | 1 Sansome St | 14/f: tenant improvement in an existing hight-rise downtown building. work to include new partitions, millowrk,doors, glazing, ceilings, new finishes. mep, fire life safety deferred permit. no exterior work.Details
14/f: tenant improvement in an existing hight-rise downtown building. work to include new partitions, millowrk,doors, glazing, ceilings, new finishes. mep, fire life safety deferred permit. no exterior work. | $735,550 |
| Mar 24, 2025 | Completed final sign-off Jul 2026 | 1 Sansome St | 22/f, ste 2250 tenant improvement in an existing hi-rise downtown bldg. work to include new partition, millwork, doors, glazing, ceilings. new finishes.Details
22/f, ste 2250 tenant improvement in an existing hi-rise downtown bldg. work to include new partition, millwork, doors, glazing, ceilings. new finishes. | $414,090 |
| Mar 18, 2025 | Completed final sign-off Jul 2026 | 1 Sansome St | 22nd/fl, ste 2200: tenant improvement in existing hi-rise downtown building. work to include, new partitions, millwork, doors, glazing, ceilings, light fixtures, and new finishes. mep deferred.Details
22nd/fl, ste 2200: tenant improvement in existing hi-rise downtown building. work to include, new partitions, millwork, doors, glazing, ceilings, light fixtures, and new finishes. mep deferred. | $484,750 |
| Feb 7, 2025 | Completed final sign-off Apr 2026 | 1 Sansome St | 15th fl - ti in an existing hi-rise downtown bldg. work to include new partitions, millwork, doors, glazing, ceilings, light fixtures, new finishes. electrical, lighting, plumbing and hvac deferred.Details
15th fl - ti in an existing hi-rise downtown bldg. work to include new partitions, millwork, doors, glazing, ceilings, light fixtures, new finishes. electrical, lighting, plumbing and hvac deferred. | $197,500 |
| Jan 28, 2025 | Completed final sign-off May 2026 | 1 Sansome St | 17th fl- interior remodel of (e) suite in an (e) hi rise downtown building. work to include new partitions, millwork, doors, glazing, ceilings, light fixtures. new finishes, electrical lighting, plumbing & hvacDetails
17th fl- interior remodel of (e) suite in an (e) hi rise downtown building. work to include new partitions, millwork, doors, glazing, ceilings, light fixtures. new finishes, electrical lighting, plumbing & hvac | $723,450 |
| Jun 17, 2024 | Completed final sign-off Aug 2024 | 1 Sansome St | per approved pa# 202207188670 & 202202047371, modify approved occupant load for district inspector request during operational permit review for concentrated & unconcentrated assembly use allocations as well as additions of 2 required illuminated signs exit and a clearly reiniated path through conserDetails
per approved pa# 202207188670 & 202202047371, modify approved occupant load for district inspector request during operational permit review for concentrated & unconcentrated assembly use allocations as well as additions of 2 required illuminated signs exit and a clearly reiniated path through conser | |
| Apr 8, 2024 | In progress issued May 2024 | 1 Sansome St | 19/f: interior remodel of common areas in an (e) hi-rise downtown building. work to include new partitions, doors, glazing. new suspended ceiling with new light fixtures, new finishes, (electrical, lighting, and hvac deferred submittal).Details
19/f: interior remodel of common areas in an (e) hi-rise downtown building. work to include new partitions, doors, glazing. new suspended ceiling with new light fixtures, new finishes, (electrical, lighting, and hvac deferred submittal). | $135,300 |
| Jul 27, 2023 | Completed final sign-off May 2025 | 1 Sansome St | suite# 3150 - interior remodel of (e) suite in an (e) hi-rise downtown bldg. include: (n) partitions, millwork, doors, glazing, (n) suspended ceiling w/ (n) light fixtures, (n) finishes, electrical, lighting & havc. mech & elect are deferred.Details
suite# 3150 - interior remodel of (e) suite in an (e) hi-rise downtown bldg. include: (n) partitions, millwork, doors, glazing, (n) suspended ceiling w/ (n) light fixtures, (n) finishes, electrical, lighting & havc. mech & elect are deferred. | $443,220 |
| Jul 27, 2023 | Completed final sign-off Feb 2025 | 1 Sansome St | suite 3210: remodel of (e) suite, new partitions, millwork, doors, glazing, new suspended ceiling w/new light fixtures/finishes/electrical/lighting/hvacDetails
suite 3210: remodel of (e) suite, new partitions, millwork, doors, glazing, new suspended ceiling w/new light fixtures/finishes/electrical/lighting/hvac | $751,122 |
| Jul 27, 2023 | Completed final sign-off May 2025 | 1 Sansome St | interior remodel (#3110) of e suite in an existing hi rise downtown building. work to include new partitions, millwork, doors, glazing, new suspended ceiling with new light fixtures, new finishes, elec, lighinting, hvac.Details
interior remodel (#3110) of e suite in an existing hi rise downtown building. work to include new partitions, millwork, doors, glazing, new suspended ceiling with new light fixtures, new finishes, elec, lighinting, hvac. | $422,300 |
| Jun 21, 2023 | Never finaled issued Jul 2023, no final | 120 Kearny St | 31st fl (ste# 3150): tenant improvement: new non-structural partitions. full upgrades to restrooms, including accessibility upgrade, fixtures, and finishes.Details
31st fl (ste# 3150): tenant improvement: new non-structural partitions. full upgrades to restrooms, including accessibility upgrade, fixtures, and finishes. | $191,477 |
| Jul 12, 2022 | Completed final sign-off Feb 2023 | 1 Sansome St | 16th fl spec suite interior renovation to include demo, new walls, doors, ceilings, finishes, millwork, hvac, elec work and plumbing. mep and sprinklers under separate permit.Details
16th fl spec suite interior renovation to include demo, new walls, doors, ceilings, finishes, millwork, hvac, elec work and plumbing. mep and sprinklers under separate permit. | $780,000 |
| Nov 3, 2021 | Never finaled issued Jan 2022, no final | 1 Sansome St | demising of 40th floor for 2 future tenants - under separate ti permits. all mep to follow.Details
demising of 40th floor for 2 future tenants - under separate ti permits. all mep to follow. | $110,000 |
| Sep 13, 2021 | Never finaled issued Oct 2021, no final | 1 Sansome St | 39/f -t.i improvement of existing t.i space. interior non rated partitions, finishes, mech, elec and plumbing to include private office, open plan office area, new gender neutral restroom, new mothers rooms, finish upgrade to existing rooms to remain.Details
39/f -t.i improvement of existing t.i space. interior non rated partitions, finishes, mech, elec and plumbing to include private office, open plan office area, new gender neutral restroom, new mothers rooms, finish upgrade to existing rooms to remain. | $643,000 |
| Aug 13, 2021 | Completed final sign-off Apr 2023 | 1 Sansome St | t.i. of (e) ground fl lobby space. bathrooms under 201910114258. lobby doors under 2018 0305 2893Details
t.i. of (e) ground fl lobby space. bathrooms under 201910114258. lobby doors under 2018 0305 2893 | $1,000,000 |
| Dec 10, 2019 | Never finaled issued Dec 2019, no final | 1 Sansome St | to obtain a final inspection for work approved under previous permit pa.201406309964. all work is complete.Details
to obtain a final inspection for work approved under previous permit pa.201406309964. all work is complete. | |
| Nov 18, 2019 | Never finaled issued Nov 2019, no final | 1 Sansome St | to obtain final inspection for work approved under pa # 201209058934 all work is complete. 39th flrDetails
to obtain final inspection for work approved under pa # 201209058934 all work is complete. 39th flr | |
| Nov 18, 2019 | Completed final sign-off Nov 2019 | 1 Sansome St | to obtain final inspection for work approved under pa # 201102230823 all work is complete. main lobbyDetails
to obtain final inspection for work approved under pa # 201102230823 all work is complete. main lobby | |
| Oct 11, 2019 | Completed final sign-off Apr 2023 | 1 Sansome St | 1/f: new ada compliant bathrooms on 1st floor. mep under separate permit. sprinkler under sep permit. maher n/a.Details
1/f: new ada compliant bathrooms on 1st floor. mep under separate permit. sprinkler under sep permit. maher n/a. | $60,000 |
| Sep 23, 2019 | Never finaled issued Oct 2019, no final | 1 Sansome St | basement:interior renovation of extg bart tunnel ceiling and lighting. all electrical permits to follow.Details
basement:interior renovation of extg bart tunnel ceiling and lighting. all electrical permits to follow. | $80,000 |
| Feb 15, 2019 | Completed final sign-off Feb 2019 | 1 Sansome St | to obtain a final inspection fo work approved under pa201508214943. all work is completeDetails
to obtain a final inspection fo work approved under pa201508214943. all work is complete | |
| Dec 5, 2018 | Completed final sign-off Apr 2023 | 1 Sansome St | create new glass openings form the (e) conservatory to the main one sansome lobby space; remove the non-functioning central fountain. *site permit only*Details
create new glass openings form the (e) conservatory to the main one sansome lobby space; remove the non-functioning central fountain. *site permit only* | $500,000 |
| Nov 13, 2018 | Never finaled issued Apr 2019, no final | 1 Sansome St | relocate (e) fire command center toom. all mep to followDetails
relocate (e) fire command center toom. all mep to follow | $15,000 |
| Sep 26, 2018 | Never finaled issued Feb 2019, no final | 1 Sansome St | remodel of (e) doors to (e) bart tunnel connection door and vestibule.Details
remodel of (e) doors to (e) bart tunnel connection door and vestibule. | $80,000 |
| Jul 6, 2018 | Never finaled issued Sep 2018, no final | 1 Sansome St | 30th fl: demo of single floor office space (n) ada compliant bathrooms. all mep permits to follow.Details
30th fl: demo of single floor office space (n) ada compliant bathrooms. all mep permits to follow. | $50,000 |
| Jun 19, 2018 | Never finaled issued Sep 2018, no final | 1 Sansome St | demo e single floor office space for tenant improvement under separate permit. remodel bathrooms w/ all mep to follow for bathroom scopeDetails
demo e single floor office space for tenant improvement under separate permit. remodel bathrooms w/ all mep to follow for bathroom scope | $50,000 |
| May 22, 2018 | Completed final sign-off Mar 2019 | 1 Sansome St | 10th floor: remodel of extg conference room and break room in extg office space. mep to follow.Details
10th floor: remodel of extg conference room and break room in extg office space. mep to follow. | $80,000 |
| Mar 5, 2018 | Never finaled issued Jan 2019, no final | 1 Sansome St | (n) glass doors & operable panels @ (e) opening from street on ground fl. **maher n/a**Details
(n) glass doors & operable panels @ (e) opening from street on ground fl. **maher n/a** | $800,000 |
| Jul 19, 2016 | Completed final sign-off Sep 2016 | 201 03rd St | revision to pa 2015-0703-0626 & 2015-0708-0892 egress plan revisionDetails
revision to pa 2015-0703-0626 & 2015-0708-0892 egress plan revision | |
| Jul 7, 2016 | Never finaled issued Jul 2016, no final | 201 03rd St | mep work only for approved ti 2016 0523 8147 for grab & go area (130 sf) adjacent to (e) restaurantDetails
mep work only for approved ti 2016 0523 8147 for grab & go area (130 sf) adjacent to (e) restaurant | $10,000 |
| May 23, 2016 | Completed final sign-off Jun 2017 | 201 03rd St | revision to pa #201507030626: scope is to install 'take out' counter adjacent ot reataurant 130 sq ft including (n) wall, floor & ceiling finishes. m.e.p. & fire protection under separate pemrits. no exterior work.Details
revision to pa #201507030626: scope is to install 'take out' counter adjacent ot reataurant 130 sq ft including (n) wall, floor & ceiling finishes. m.e.p. & fire protection under separate pemrits. no exterior work. | $20,000 |
| Mar 16, 2016 | Never finaled issued Apr 2016, no final | 1 Sansome St | 41,42nd flrs: revision to 2015-0527-7290 per sffd request, smoke narrative revisedDetails
41,42nd flrs: revision to 2015-0527-7290 per sffd request, smoke narrative revised | |
| Dec 16, 2015 | Never finaled issued Dec 2015, no final | 201 03rd St | revision to 201507030626. revision removes egress door and shows revised egress path from kitchen via common path of travel. no change to occupant loadDetails
revision to 201507030626. revision removes egress door and shows revised egress path from kitchen via common path of travel. no change to occupant load | |
| Dec 10, 2015 | Never finaled issued Dec 2015, no final | 1 Sansome St | 3rd floor interior infill of double height atrium & new ada bathrooms - addition of 3,354 sq ft. all mep permits to follow.Details
3rd floor interior infill of double height atrium & new ada bathrooms - addition of 3,354 sq ft. all mep permits to follow. | $600,000 |
| Oct 8, 2015 | Completed final sign-off Nov 2015 | 1 Sansome St | 37th floor: upgrade of (e) hvac including new vav's. rebalance of (e) vavs' & new air outlets. ref pa 2015 0904 6182 & 1369906Details
37th floor: upgrade of (e) hvac including new vav's. rebalance of (e) vavs' & new air outlets. ref pa 2015 0904 6182 & 1369906 | $25,000 |
| Sep 4, 2015 | Completed final sign-off Apr 2016 | 1 Sansome St | 37th floor - ti in (e) multi-tenant. floor previously demo'd space (all mep permits to follow)Details
37th floor - ti in (e) multi-tenant. floor previously demo'd space (all mep permits to follow) | $325,000 |
| Aug 21, 2015 | Never finaled issued Sep 2015, no final | 1 Sansome St | installation of new ada compliant men & women's bathrooms & shower stall to support the lobby, all mep. permit & sprinkler to follow.Details
installation of new ada compliant men & women's bathrooms & shower stall to support the lobby, all mep. permit & sprinkler to follow. | $50,000 |
| Aug 10, 2015 | Completed final sign-off Sep 2016 | 201 03rd St | mep for new restaurant t.i. approved under app#201507030626. mep work only.Details
mep for new restaurant t.i. approved under app#201507030626. mep work only. | $250,000 |
| Jul 3, 2015 | Completed final sign-off Sep 2016 | 201 03rd St | t.i. for new restaurant work includes, new partition, fixutres finishes, equipment, mep,and new bathrooms. no exterior work. fire protection under seperate permit. mep under seperate permit.Details
t.i. for new restaurant work includes, new partition, fixutres finishes, equipment, mep,and new bathrooms. no exterior work. fire protection under seperate permit. mep under seperate permit. | $1,200,000 |
| Jun 22, 2015 | Completed final sign-off May 2016 | 1 Sansome St | 39th floor t.i. of 5,285 sf of office bldg. space to have all new walls, finishes, mechanical & electrical distrubution. work to include plumbing at a new kitchen (no range).Details
39th floor t.i. of 5,285 sf of office bldg. space to have all new walls, finishes, mechanical & electrical distrubution. work to include plumbing at a new kitchen (no range). | $1,000,000 |
| Jun 11, 2015 | Completed final sign-off Jun 2016 | 1 Sansome St | 16th floor: t.i. for 2813 sq ft of space including new partitions, new ductwork, and new mep. n/a for the maher. new clouded ceilings class c.Details
16th floor: t.i. for 2813 sq ft of space including new partitions, new ductwork, and new mep. n/a for the maher. new clouded ceilings class c. | $300,000 |
| Jun 3, 2015 | Never finaled issued Jun 2015, no final | 1 Sansome St | 38th floor: interior demo of extg office space and ada bathroom upgrade. lobby upgrade. all mep permit to follow.Details
38th floor: interior demo of extg office space and ada bathroom upgrade. lobby upgrade. all mep permit to follow. | $250,000 |
| Jun 1, 2015 | Completed final sign-off Dec 2015 | 201 03rd St | 1st floor demo: reduction of existing mezzanine for increased ceiling height in advance of future tenant improvement per ab-17Details
1st floor demo: reduction of existing mezzanine for increased ceiling height in advance of future tenant improvement per ab-17 | $25,000 |
| May 27, 2015 | Never finaled issued Jul 2015, no final | 1 Sansome St | 40th-42nd floors: new elevators to 42nd floor for ada access prevouslty not provided. (n) vav boxes and duct distribution at the 42nd floor (n) exit access stair to 41st floor. n/a for the maher.Details
40th-42nd floors: new elevators to 42nd floor for ada access prevouslty not provided. (n) vav boxes and duct distribution at the 42nd floor (n) exit access stair to 41st floor. n/a for the maher. | $500,000 |
| May 21, 2015 | Never finaled issued Jun 2015, no final | 1 Sansome St | t.i. & demo of (e) offices & partitions & (e) stair. (n) ada compliant bathrooms. (n) elevator lobbies. (n) demising walls for future tenants 1 & 1. all mep under seperate permit.Details
t.i. & demo of (e) offices & partitions & (e) stair. (n) ada compliant bathrooms. (n) elevator lobbies. (n) demising walls for future tenants 1 & 1. all mep under seperate permit. | $400,000 |
| Apr 3, 2015 | Completed final sign-off Dec 2015 | 201 03rd St | interior non-structural soft demo. removal of railing, remove & patch sidewalk. remove hung heaters and light - all inside property line; separate ti permit. ab-017 applies.Details
interior non-structural soft demo. removal of railing, remove & patch sidewalk. remove hung heaters and light - all inside property line; separate ti permit. ab-017 applies. | $20,000 |
| Mar 19, 2015 | Never finaled issued Apr 2015, no final | 1 Sansome St | 16th floor: remodel elevator obbies. remodel (e) non-compliant restrooms for ada compliance. mep under separate permit.Details
16th floor: remodel elevator obbies. remodel (e) non-compliant restrooms for ada compliance. mep under separate permit. | $225,000 |
| Sep 12, 2014 | Completed final sign-off Dec 2014 | 1 Sansome St | 36th floor - bathroom ada compliance & barrier removal. (plumbing & electrical permit to follow)Details
36th floor - bathroom ada compliance & barrier removal. (plumbing & electrical permit to follow) | $50,000 |
| Jun 30, 2014 | Never finaled issued Jul 2014, no final | 1 Sansome St | add ada bathrooms at first floor lobby. sprinkler under separate permit. maher n/a.Details
add ada bathrooms at first floor lobby. sprinkler under separate permit. maher n/a. | $45,000 |
| Jun 30, 2014 | Completed final sign-off Jun 2015 | 1 Sansome St | #b 28th floor- t.i. in priousely demo suite. adding offices and one conference per plan, adding one break room. maher n/a. f/a, sprinkler and mep under separate permit.Details
#b 28th floor- t.i. in priousely demo suite. adding offices and one conference per plan, adding one break room. maher n/a. f/a, sprinkler and mep under separate permit. | $150,000 |
| Jun 25, 2014 | Completed final sign-off Feb 2015 | 1 Sansome St | interior remodel of previously demo space on floors 9-12 & partial 28th floor for single tenant, arch. & mep. fire alarm, sprinklers under separate permit.Details
interior remodel of previously demo space on floors 9-12 & partial 28th floor for single tenant, arch. & mep. fire alarm, sprinklers under separate permit. | $3,000,150 |
| May 27, 2014 | Completed final sign-off Aug 2014 | 1 Sansome St | 39th floor: interior remodel of previously demo'd office space. all mep to follow. n/a for the maher ordinance #155-13Details
39th floor: interior remodel of previously demo'd office space. all mep to follow. n/a for the maher ordinance #155-13 | $400,000 |
| Apr 14, 2014 | Completed final sign-off Aug 2014 | 1 Sansome St | 32nd floor: interior remodel of extg office space and ada bathroom upgrade. (all mep permits to follow)Details
32nd floor: interior remodel of extg office space and ada bathroom upgrade. (all mep permits to follow) | $750,000 |
| Mar 25, 2014 | Never finaled issued Mar 2014, no final | 1 Sansome St | 39th flr: to obtain final inspection for work approved under pa#201209058934; all work is completeDetails
39th flr: to obtain final inspection for work approved under pa#201209058934; all work is complete | |
| Mar 25, 2014 | Completed final sign-off Aug 2014 | 1 Sansome St | 31st flr: to obtain final inspection for work approved under pa#201201041702; all work is completeDetails
31st flr: to obtain final inspection for work approved under pa#201201041702; all work is complete | |
| Mar 25, 2014 | Completed final sign-off Aug 2014 | 1 Sansome St | 9th flr: to obtain final inspection for work approved under pa# 201111229455; for final inspection, all work is completeDetails
9th flr: to obtain final inspection for work approved under pa# 201111229455; for final inspection, all work is complete | |
| Dec 23, 2013 | Completed final sign-off Aug 2014 | 1 Sansome St | 28th floor:t.i. of single suite "a" on extg 28th floor. all mep permits to follow. (sprinkler fire/life safety to follow)Details
28th floor:t.i. of single suite "a" on extg 28th floor. all mep permits to follow. (sprinkler fire/life safety to follow) | $250,000 |
| Dec 19, 2013 | Completed final sign-off Feb 2014 | 1 Sansome St | new exit corridor, tenant divisions & tenant improvement on 28th floor, all mep. ls and sprinklers permit to follow.Details
new exit corridor, tenant divisions & tenant improvement on 28th floor, all mep. ls and sprinklers permit to follow. | $250,000 |
| Oct 7, 2013 | Completed final sign-off Oct 2015 | 1 Sansome St | interior remodel of existing baths. provide ada upgrades at 40/f & 41/f. all mep permits to follow.Details
interior remodel of existing baths. provide ada upgrades at 40/f & 41/f. all mep permits to follow. | $150,000 |
| Aug 14, 2013 | Completed final sign-off May 2014 | 1 Sansome St | 20th floor: t.i. in previously demo'd extg office space. all mep permit to follow.Details
20th floor: t.i. in previously demo'd extg office space. all mep permit to follow. | $475,000 |
| May 21, 2013 | Completed final sign-off Feb 2014 | 1 Sansome St | 28th floor: demo of non-structural partitions. lobby and bathroom remodel inc. ada upgrades.Details
28th floor: demo of non-structural partitions. lobby and bathroom remodel inc. ada upgrades. | $150,000 |
| May 9, 2013 | Completed final sign-off Oct 2013 | 1 Sansome St | full floor tenant improvement, including pantry and idf. elevator lobby and restrooms under permit#2013-0103-7180, not in scope of work. demolition under 2013-0509-6551. all mep permit to followDetails
full floor tenant improvement, including pantry and idf. elevator lobby and restrooms under permit#2013-0103-7180, not in scope of work. demolition under 2013-0509-6551. all mep permit to follow | $350,000 |
| May 9, 2013 | Completed final sign-off Dec 2013 | 1 Sansome St | demolition of existing non-structural partitions. core to remain. future tenant improvement to be submittal under seperate permit.ab 017, mep under separate permitDetails
demolition of existing non-structural partitions. core to remain. future tenant improvement to be submittal under seperate permit.ab 017, mep under separate permit | $10,000 |
| Mar 27, 2013 | Completed final sign-off Dec 2013 | 1 Sansome St | 20th floor-interior remodel of (e) office space, lobby upgrades & ada bathroom upgrades. all m.e.p permits to followDetails
20th floor-interior remodel of (e) office space, lobby upgrades & ada bathroom upgrades. all m.e.p permits to follow | $200,000 |
| Mar 27, 2013 | Completed final sign-off Mar 2014 | 1 Sansome St | 10th floor-interior remodel of (e) non conforming bathrooms & lobby remodel. all m.e.p permits to followDetails
10th floor-interior remodel of (e) non conforming bathrooms & lobby remodel. all m.e.p permits to follow | $50,000 |
| Mar 27, 2013 | Completed final sign-off Mar 2014 | 1 Sansome St | remodel of existing non-conforming, bathroom + lobby remodel (all mep permits to follow)Details
remodel of existing non-conforming, bathroom + lobby remodel (all mep permits to follow) | $50,000 |
| Mar 27, 2013 | Completed final sign-off Dec 2013 | 1 Sansome St | remodel of existing non-conforming, bathroom + lobby remodel (all mep permits to follow)Details
remodel of existing non-conforming, bathroom + lobby remodel (all mep permits to follow) | $150,000 |
| Jan 3, 2013 | Completed final sign-off Aug 2014 | 1 Sansome St | interior remoel of elevator lobby and bathrooms. all mep to followDetails
interior remoel of elevator lobby and bathrooms. all mep to follow | $50,000 |
| Jan 3, 2013 | Never finaled issued Jan 2013, no final | 1 Sansome St | interior remodel of elevator lobby and bathrooms. all mep to followDetails
interior remodel of elevator lobby and bathrooms. all mep to follow | $50,000 |
| Dec 7, 2012 | Completed final sign-off Jun 2013 | 1 Sansome St | tenant improvement of existing demolished 34th floor office space. all mep permit to follow.Details
tenant improvement of existing demolished 34th floor office space. all mep permit to follow. | $400,000 |
| Nov 5, 2012 | Completed final sign-off Jun 2013 | 1 Sansome St | 34th floor, suite "b" - tenant improvement of (e) demolished office space-new office space with non load-bearing partitions. all m.e.p permits to followDetails
34th floor, suite "b" - tenant improvement of (e) demolished office space-new office space with non load-bearing partitions. all m.e.p permits to follow | $195,000 |
| Nov 5, 2012 | Completed final sign-off Jun 2013 | 1 Sansome St | 34th floor-tenant improvement of (e) demolished office space-new office space with non load-bearing partitions. all m.e.p permits to followDetails
34th floor-tenant improvement of (e) demolished office space-new office space with non load-bearing partitions. all m.e.p permits to follow | $145,600 |
| Nov 5, 2012 | Completed final sign-off Jun 2013 | 1 Sansome St | 29th floor-tenant improvement of (e) demolished office space-new office space with non load-bearing partitions. all m.e.p permits to followDetails
29th floor-tenant improvement of (e) demolished office space-new office space with non load-bearing partitions. all m.e.p permits to follow | $166,000 |
| Oct 1, 2012 | Completed final sign-off Jun 2013 | 1 Sansome St | interior remodel of (e) demolished office space. all mep permits to follow.Details
interior remodel of (e) demolished office space. all mep permits to follow. | $153,000 |
| Sep 5, 2012 | Never finaled issued Sep 2012, no final | 1 Sansome St | interior remodel of existing office lobby, ada bathroom upgrade & removal of non-exit stair to 40th floor. all mep permits to followDetails
interior remodel of existing office lobby, ada bathroom upgrade & removal of non-exit stair to 40th floor. all mep permits to follow | $75,000 |
| Jun 22, 2012 | Completed final sign-off Oct 2012 | 1 Sansome St | interior remodel of existing office space. all l/s, mep permits to followDetails
interior remodel of existing office space. all l/s, mep permits to follow | $150,000 |
| Apr 19, 2012 | Completed final sign-off Dec 2012 | 1 Sansome St | remodel existing exit corridor. remove e stair between floor 17 and 18. bathroom ada upgrades and tenant improvement in e demolished office space. all mep permits to follow.Details
remodel existing exit corridor. remove e stair between floor 17 and 18. bathroom ada upgrades and tenant improvement in e demolished office space. all mep permits to follow. | $161,800 |
| Apr 19, 2012 | Completed final sign-off Dec 2013 | 1 Sansome St | 34th floor- division of previously demolished floor into future tenant spaces, bathroom ada upgrades, tenant improvement in southeast corner. all mep permits to follow.Details
34th floor- division of previously demolished floor into future tenant spaces, bathroom ada upgrades, tenant improvement in southeast corner. all mep permits to follow. | $250,000 |
| Apr 19, 2012 | Never finaled issued May 2012, no final | 1 Sansome St | interior remodel of existing office space and ada bathroom upgradesDetails
interior remodel of existing office space and ada bathroom upgrades | $400,000 |
| Mar 1, 2012 | Never finaled issued Apr 2012, no final | 1 Sansome St | 15th floor tenant improvement in existing office space - new walls, new ceiling, new lighting & finishes. all mep under separate permit.Details
15th floor tenant improvement in existing office space - new walls, new ceiling, new lighting & finishes. all mep under separate permit. | $200,000 |
| Feb 15, 2012 | Never finaled issued Mar 2012, no final | 1 Sansome St | 18th floor-partial demo of (e) office space & construction of new tenant space. all m.e.p permits to followDetails
18th floor-partial demo of (e) office space & construction of new tenant space. all m.e.p permits to follow | $161,800 |
| Jan 31, 2012 | Never finaled issued Feb 2012, no final | 1 Sansome St | 36th floor:construction of an office space in previously demo'd space. bathroom upgrade completed previously and surveyed and noted for referance. all mep permits to follow.Details
36th floor:construction of an office space in previously demo'd space. bathroom upgrade completed previously and surveyed and noted for referance. all mep permits to follow. | $98,800 |
| Jan 31, 2012 | Completed final sign-off Aug 2014 | 1 Sansome St | 15th floor:remodel of extg elevator lobby. ada upgrades to extg bathrooms for full compliance. all mep permits to follow.up grade rest rooms and elevator lobbyDetails
15th floor:remodel of extg elevator lobby. ada upgrades to extg bathrooms for full compliance. all mep permits to follow.up grade rest rooms and elevator lobby | $40,000 |
| Jan 31, 2012 | Never finaled issued Feb 2012, no final | 1 Sansome St | 29th floor:construction of office space in previously demo'd space. bathrooms already compliant but surveyed and noted for ref. all mep permits to follow.Details
29th floor:construction of office space in previously demo'd space. bathrooms already compliant but surveyed and noted for ref. all mep permits to follow. | $153,000 |
| Jan 4, 2012 | Never finaled issued Jan 2012, no final | 1 Sansome St | demo of non compliant bathrooms and installation of ada compliant bathrooms on 31st fl. remodel of e 31st fl elevator lobby. (all mep permits to follow)Details
demo of non compliant bathrooms and installation of ada compliant bathrooms on 31st fl. remodel of e 31st fl elevator lobby. (all mep permits to follow) | $62,000 |
| Dec 2, 2011 | Completed final sign-off Dec 2012 | 1 Sansome St | demolition of extg entrance doors. intalling new walls, kitchen/break room area. new lighting and finishes. all mep permits to follow.Details
demolition of extg entrance doors. intalling new walls, kitchen/break room area. new lighting and finishes. all mep permits to follow. | $114,345 |
| Nov 22, 2011 | Never finaled issued Nov 2011, no final | 1 Sansome St | remodel of non complient areas of extg bathrooms on 9th floor.for selective items of barriers.Details
remodel of non complient areas of extg bathrooms on 9th floor.for selective items of barriers. | $15,000 |
| Oct 28, 2011 | Completed final sign-off Dec 2013 | 1 Sansome St | demolition and replacement of e non structural suspended metal panel ceiling system and recessed can light fixtures with new gyp bd and plaster ceiling system and energy efficiency led fixturesDetails
demolition and replacement of e non structural suspended metal panel ceiling system and recessed can light fixtures with new gyp bd and plaster ceiling system and energy efficiency led fixtures | $25,000 |
| Oct 27, 2011 | Completed final sign-off Aug 2014 | 1 Sansome St | new interior partitions in exg 7th floor office space. minor restroom modification to ensure compliance. mep, sprinkler, and life safty under seperate permit.Details
new interior partitions in exg 7th floor office space. minor restroom modification to ensure compliance. mep, sprinkler, and life safty under seperate permit. | $74,000 |
| Oct 26, 2011 | Completed final sign-off Jan 2012 | 1 Sansome St | ste 1650:16th floor-demolish of (e) non structural partitions, doors, frames, ceiling, lights & finiahes. adding new non structural partitions, doors, frames, ceiling, lights, millwork & finishes. installing power tele/data. m.e.p, sprinklers, life safety under seperate permitDetails
ste 1650:16th floor-demolish of (e) non structural partitions, doors, frames, ceiling, lights & finiahes. adding new non structural partitions, doors, frames, ceiling, lights, millwork & finishes. installing power tele/data. m.e.p, sprinklers, life safety under seperate permit | $134,000 |
| Jun 10, 2011 | Completed final sign-off Dec 2013 | 1 Sansome St | office ti on he 36th fl suiote #3650. demo of (e0 non struc partitions, clg,lights, millwork and finishes. (n) non struc partitions, clg,lights,millwork,finishes, no change in occupance or use . mep under separate permitDetails
office ti on he 36th fl suiote #3650. demo of (e0 non struc partitions, clg,lights, millwork and finishes. (n) non struc partitions, clg,lights,millwork,finishes, no change in occupance or use . mep under separate permit | $266,580 |
| Feb 23, 2011 | Never finaled issued Feb 2011, no final | 1 Sansome St | demo extg ceiling,new light fixtures, new ceiling. demo extg security console,install new security console. elevator cab renovation.15 cabs total.reference plans for plans for path of travel app#201101279115. mep fire/life safety to follow under seperate permit.Details
demo extg ceiling,new light fixtures, new ceiling. demo extg security console,install new security console. elevator cab renovation.15 cabs total.reference plans for plans for path of travel app#201101279115. mep fire/life safety to follow under seperate permit. | $343,500 |
| Jan 27, 2011 | Never finaled issued Feb 2011, no final | 1 Sansome St | disabled access at gr floor restrooms. relocate partitions, lavatory. remove 2 urinals. barrier removal onlyDetails
disabled access at gr floor restrooms. relocate partitions, lavatory. remove 2 urinals. barrier removal only | $20,000 |
| Jan 27, 2011 | Completed final sign-off Aug 2011 | 1 Sansome St | work on 6th floor includes new non-load bearing partitions, public corridor, new suspended ceiling & lighting, new mechanical, elect & plumbing, 2 new ada compliant restrooms.Details
work on 6th floor includes new non-load bearing partitions, public corridor, new suspended ceiling & lighting, new mechanical, elect & plumbing, 2 new ada compliant restrooms. | $900,000 |
| Jan 21, 2011 | Never finaled issued Jan 2011, no final | 1 Sansome St | disabled access only-ground floor path of travel. handrail upgrade at exterior front & install international symbol of accessibilityDetails
disabled access only-ground floor path of travel. handrail upgrade at exterior front & install international symbol of accessibility | |
| Dec 29, 2010 | Completed final sign-off Dec 2011 | 1 Sansome St | tenant improvement on the 36th fl, spec suite 3670 and 3690Details
tenant improvement on the 36th fl, spec suite 3670 and 3690 | $345,000 |
| Dec 29, 2010 | Completed final sign-off Jul 2011 | 1 Sansome St | tenant improvments on 8th fl, suite 810Details
tenant improvments on 8th fl, suite 810 | $76,000 |
| Dec 20, 2010 | Completed final sign-off Dec 2012 | 1 Sansome St | 36th floor-demo (e) walls, frame new area, drywall, finish, paint, tile, carpet. t-bar, misc repairs, renovate (e) restrooms, renovate (e) elevator lobby, new doors & new millwork. m.e.p, fire & life safety plans to follow under seperate permitDetails
36th floor-demo (e) walls, frame new area, drywall, finish, paint, tile, carpet. t-bar, misc repairs, renovate (e) restrooms, renovate (e) elevator lobby, new doors & new millwork. m.e.p, fire & life safety plans to follow under seperate permit | $109,368 |