Steve Logan Construction Inc
- Based in
- Mill Valley
- On San Francisco permits
- May 2022 to May 2025
- Last 24 months
- 1 permit filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 29, 2025 | Completed final sign-off Jul 2025 | 245 Edgehill Wy | partial siding replacement, southeast corner, approx 8'x30' section and associated miscellanous dryrot repair if needed. not visible from st.Details
partial siding replacement, southeast corner, approx 8'x30' section and associated miscellanous dryrot repair if needed. not visible from st. | $18,000 |
| Aug 16, 2023 | Completed final sign-off Sep 2023 | 1173 Filbert St | remove dry rotted portion of handrail at rear deck outside office door. replace in kind.Details
remove dry rotted portion of handrail at rear deck outside office door. replace in kind. | $1,800 |
| Jun 10, 2022 | Completed final sign-off Jul 2022 | 506 10th Av | to obtain final inspection for work approved under pa#200010112613. all work is complete.Details
to obtain final inspection for work approved under pa#200010112613. all work is complete. | |
| May 19, 2022 | Completed final sign-off Jan 2023 | 506 10th Av | repair work necessiated due to damage caused by sewage overflow. work to include new sheet rock (less than 50% repair), painting, replacement of floor coverings with tile (bathroom) and vinyl flooring (remainder), replacement of base moldings, resetting of toilet and sink after floor installation.Details
repair work necessiated due to damage caused by sewage overflow. work to include new sheet rock (less than 50% repair), painting, replacement of floor coverings with tile (bathroom) and vinyl flooring (remainder), replacement of base moldings, resetting of toilet and sink after floor installation. | $12,000 |