Stellar Construction
- Based in
- Fairfax
- On San Francisco permits
- Nov 2005 to Jul 2025
- Last 24 months
- 2 permits filed
41 permits since 2000: 28 completed, 1 in progress, 7 never finaled, 5 expired or cancelled.
Of the 7 never-finaled permits, 3 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 17, 2025 | In progress issued Jul 2025 | 3240 Sacramento St | apt a : bathroom remodel. no change in configuration. new shower valves, shower pan, fan, tiles and vanity. no wall removalDetails
apt a : bathroom remodel. no change in configuration. new shower valves, shower pan, fan, tiles and vanity. no wall removal | $18,000 |
| May 7, 2025 | Completed final sign-off Aug 2025 | 2832 Lyon St | revision to permit 202503283293. changes to deck tiles, guardrail and posts.Details
revision to permit 202503283293. changes to deck tiles, guardrail and posts. | |
| Dec 3, 2021 | Completed final sign-off Mar 2022 | 3670 17th St | less than 50% exterior rear staircase repair. replace 3 handrail posts, add screws.Details
less than 50% exterior rear staircase repair. replace 3 handrail posts, add screws. | $2,100 |
| Jan 8, 2020 | Completed final sign-off Dec 2020 | 1232 Alabama St | replace (e) rotted exterior egress stair at central courtyard - (n) stair to be near-exact like-for-like replacement.Details
replace (e) rotted exterior egress stair at central courtyard - (n) stair to be near-exact like-for-like replacement. | $10,000 |
| Dec 5, 2019 | Completed final sign-off Dec 2020 | 1871 Bush St | extend deck to rear yard. no change to front facade or egress systems.Details
extend deck to rear yard. no change to front facade or egress systems. | $10,000 |
| Sep 4, 2019 | Completed final sign-off Oct 2019 | 221 Arguello Bl | less than 50% deck repair, remove approx. 160 sf redwood decking. replace with ipe decking. framing to remain, ground level deck.Details
less than 50% deck repair, remove approx. 160 sf redwood decking. replace with ipe decking. framing to remain, ground level deck. | $16,000 |
| Dec 19, 2018 | Completed final sign-off Jan 2019 | 909 Grove St | repair <50% of (e) lightwell egress stairs - replace selected deteriorated treads, risers & stringers. approved otc per pc 1005 (e)(3). no other work.Details
repair <50% of (e) lightwell egress stairs - replace selected deteriorated treads, risers & stringers. approved otc per pc 1005 (e)(3). no other work. | $18,000 |
| Oct 4, 2018 | Completed final sign-off Oct 2018 | 268 Chattanooga St | staircase repair- replace risers, prime and paint.Details
staircase repair- replace risers, prime and paint. | $2,100 |
| Sep 11, 2018 | Completed final sign-off May 2019 | 3832 Fulton St | replace fire egress stairs in kind due to significant deterioration. no firewall construction.Details
replace fire egress stairs in kind due to significant deterioration. no firewall construction. | $20,000 |
| Sep 11, 2018 | Completed final sign-off Jan 2019 | 2651 Post St | replace fire egress stairs in kind due to significant deterioration. no firewall construction.Details
replace fire egress stairs in kind due to significant deterioration. no firewall construction. | $20,000 |
| May 11, 2018 | Never finaled issued May 2018, no final | 85 Buena Vista Tr | bathroom remodel. remove/replace bath tub. install 2 new sinks (adding 1 sink to 2), new vanity, toilet, light fixture, tub drain and valve and tile, 1 new plug. no change i n walls & openings layoutDetails
bathroom remodel. remove/replace bath tub. install 2 new sinks (adding 1 sink to 2), new vanity, toilet, light fixture, tub drain and valve and tile, 1 new plug. no change i n walls & openings layout | $27,000 |
| May 7, 2018 | Completed final sign-off Mar 2024 | 3347 21st St | comply with nov 201847613, change of front gate from straight to gable. legalize work done already.Details
comply with nov 201847613, change of front gate from straight to gable. legalize work done already. | $1,000 |
| Dec 22, 2017 | Completed final sign-off Jan 2018 | 1712 Fillmore St | less than 50% repair of front stair case. install five new stringers and new steps and risers. walls and railings to remain. all work in kind. no change to style or size.Details
less than 50% repair of front stair case. install five new stringers and new steps and risers. walls and railings to remain. all work in kind. no change to style or size. | $19,400 |
| Oct 12, 2017 | Completed final sign-off Jul 2018 | 115 Anzavista Av | remove existing (e) vinyl over plywood flooring at sunroom porch. install new ipe on existing joists. approx 160 sq ft area.Details
remove existing (e) vinyl over plywood flooring at sunroom porch. install new ipe on existing joists. approx 160 sq ft area. | $14,000 |
| Aug 29, 2017 | Completed final sign-off Nov 2017 | 3355 21st St | no change. repair/replace rotted wood on side deck/stairs, replace less than 50% of materials.Details
no change. repair/replace rotted wood on side deck/stairs, replace less than 50% of materials. | $8,000 |
| Jun 5, 2017 | Completed final sign-off Aug 2017 | 662 Castro St | replace rotted siding by roof deck, about 7 sheets of t 1-11 siding, approx 125 sq ft. replace upper exterior door. all repairs, in kind.Details
replace rotted siding by roof deck, about 7 sheets of t 1-11 siding, approx 125 sq ft. replace upper exterior door. all repairs, in kind. | $7,000 |
| May 4, 2017 | Completed final sign-off Aug 2017 | 660 Castro St | remove sliding door, repair sub-floor under door, re-install existing sliding door.Details
remove sliding door, repair sub-floor under door, re-install existing sliding door. | $800 |
| Dec 14, 2016 | Never finaled issued Dec 2016, no final | 3560 California St | exterior window trim & building trim repair in preparation for painting. front of building only.Details
exterior window trim & building trim repair in preparation for painting. front of building only. | $4,000 |
| Dec 14, 2016 | Never finaled issued Dec 2016, no final | 240 Arguello Bl | repair exterior wood staircase. less than 50% within lightwell.Details
repair exterior wood staircase. less than 50% within lightwell. | $21,000 |
| Oct 31, 2016 | Completed final sign-off Jan 2018 | 310 Cresta Vista Dr | add a second story deck at the rear side with spiral staircase. add a new lower deck at the rear side. add new concrete retaining wall with piersDetails
add a second story deck at the rear side with spiral staircase. add a new lower deck at the rear side. add new concrete retaining wall with piers | $50,000 |
| Mar 17, 2016 | Completed final sign-off May 2016 | 2311 California St | repair front entry steps and risers and stringers, rail system to remain. all repairs to match existing in material (wood). less than 50% repair.Details
repair front entry steps and risers and stringers, rail system to remain. all repairs to match existing in material (wood). less than 50% repair. | $15,000 |
| Sep 8, 2015 | Never finaled issued Sep 2015, no final | 3357 21st St | replace damaged beams and posts, provide new footings; replace 9e) posts at the stairs; replace cellar door framing & wood plank at the stairs; provide new plywood sheathingDetails
replace damaged beams and posts, provide new footings; replace 9e) posts at the stairs; replace cellar door framing & wood plank at the stairs; provide new plywood sheathing | $15,000 |
| Jul 15, 2015 | Completed final sign-off Dec 2015 | 842 Presidio Av | repair extg stair from termite and dry rot damage in kind. less than 50%Details
repair extg stair from termite and dry rot damage in kind. less than 50% | $5,000 |
| Feb 24, 2015 | Completed final sign-off Aug 2015 | 625 09th Av | bathroom remodel: plumbing, electriical, tile, new fixture, new window, and pocket doors. no structural work as per plans.Details
bathroom remodel: plumbing, electriical, tile, new fixture, new window, and pocket doors. no structural work as per plans. | $15,000 |
| Dec 9, 2013 | Completed final sign-off Apr 2014 | 56 Winfield St | modification existing 201306260577. original permit stated 40% modification to rear decks. actual replacement is 90-100% in kind dry rot repairDetails
modification existing 201306260577. original permit stated 40% modification to rear decks. actual replacement is 90-100% in kind dry rot repair | $5,000 |
| Dec 9, 2013 | Never finaled issued Jan 2014, no final | 58 Winfield St | revision to 201306260576. increase balcony dryrot repair to 90-100 % modification in kindDetails
revision to 201306260576. increase balcony dryrot repair to 90-100 % modification in kind | $5,000 |
| Jun 6, 2013 | Expired or cancelled cancelled Jan 2026 | 358 Prospect Av | repair & replace existing upper decks (3 total). add new railing system. replace ground floor deck. add new ground floor terrace.Details
repair & replace existing upper decks (3 total). add new railing system. replace ground floor deck. add new ground floor terrace. | $116,000 |
| Dec 8, 2011 | Completed final sign-off May 2012 | 1340 Clay St | interior remodeling work of an extg condominium residence including the demolition of non loadbearing/non structural partitions, relocation of interior doors, and the replacement of the extg fireplace with a new gas insert.sprinkler and fire alarm revisions under separate applicationDetails
interior remodeling work of an extg condominium residence including the demolition of non loadbearing/non structural partitions, relocation of interior doors, and the replacement of the extg fireplace with a new gas insert.sprinkler and fire alarm revisions under separate application | $45,000 |
| Dec 1, 2011 | Expired or cancelled expired Jan 2013 | 1200 California St | #4b -remove closer from master bedroom hall, relocate master bedroom door, remove guest rom wing wall partition to form alcove, fur out master hall, add guest closet to allow for electrical upgrades, isntall 7 new light fixtures & one kitchen faucet.Details
#4b -remove closer from master bedroom hall, relocate master bedroom door, remove guest rom wing wall partition to form alcove, fur out master hall, add guest closet to allow for electrical upgrades, isntall 7 new light fixtures & one kitchen faucet. | $60,000 |
| Sep 16, 2011 | Completed final sign-off Feb 2012 | 425 01st St | unit # 5003: install 23 led low voc recessed lights (halo 11 watts). patch sheetrock as necessary+ repair. replacing existing incondescent lights.Details
unit # 5003: install 23 led low voc recessed lights (halo 11 watts). patch sheetrock as necessary+ repair. replacing existing incondescent lights. | $70,000 |
| Aug 1, 2011 | Expired or cancelled expired Nov 2013 | 338 Spear St | barreir removal at bath #1 and pr0pose kitchen plan under app #201104274884Details
barreir removal at bath #1 and pr0pose kitchen plan under app #201104274884 | |
| Jun 20, 2011 | Expired or cancelled expired May 2017 | 660 Castro St | replace existing solarium (two surfaces) two panels, no structural changes, repair in kind.Details
replace existing solarium (two surfaces) two panels, no structural changes, repair in kind. | $30,000 |
| Jun 7, 2011 | Never finaled issued Jun 2011, no final | 338 Spear St | the infinity. unit 40b. condo upgrade incl. relocation of laundry, new pocket dr at library,new lighting and switching, new trim and casings, new valance at two perimiter walls, and new bfast counter at kitchen. relocate 4 furnace vents, and install 2 new exhaust fans.Details
the infinity. unit 40b. condo upgrade incl. relocation of laundry, new pocket dr at library,new lighting and switching, new trim and casings, new valance at two perimiter walls, and new bfast counter at kitchen. relocate 4 furnace vents, and install 2 new exhaust fans. | $148,000 |
| Apr 27, 2011 | Never finaled issued Apr 2011, no final | 338 Spear St | condo remodel to include kitchen, laundry, 3 bathrooms.new floor tile and bathroom tile. new lighting and switching.drop ceiling in 2 rooms to allow for lighting changes; life safety and sprinkler under separate permit, swi, 4-27-11Details
condo remodel to include kitchen, laundry, 3 bathrooms.new floor tile and bathroom tile. new lighting and switching.drop ceiling in 2 rooms to allow for lighting changes; life safety and sprinkler under separate permit, swi, 4-27-11 | $330,000 |
| Aug 2, 2010 | Completed final sign-off Mar 2011 | 631 39th Av | master bedroom and bathroom remodel, new sheetrock, r-13 insulation, new shower pau and tile, new electrical plugs and lighting, new wall mounted toilet and sinks - 2. new tile shower and bathroom floor, new shower valve & faucets, vanities and counter tops.Details
master bedroom and bathroom remodel, new sheetrock, r-13 insulation, new shower pau and tile, new electrical plugs and lighting, new wall mounted toilet and sinks - 2. new tile shower and bathroom floor, new shower valve & faucets, vanities and counter tops. | $30,000 |
| Jun 14, 2010 | Completed final sign-off Jul 2010 | 422 22nd Av | deck repairs-remove wood 2x6 from 2 decks & replace with trex composite decking. remove 2 rails & replace with 42" high rails, less than 50% of deck. decks at the back of the houseDetails
deck repairs-remove wood 2x6 from 2 decks & replace with trex composite decking. remove 2 rails & replace with 42" high rails, less than 50% of deck. decks at the back of the house | $18,000 |
| Feb 17, 2009 | Completed final sign-off May 2009 | 283 Coleridge St | kitchen reomdel, new cabinets, all new appliances, new tile floor, counters. addition of lighting & receptacles, new stove venting, no structural changes. approx 6 new electrical circuits. min 50% of kitchen light watts must be from fluorescent lights.Details
kitchen reomdel, new cabinets, all new appliances, new tile floor, counters. addition of lighting & receptacles, new stove venting, no structural changes. approx 6 new electrical circuits. min 50% of kitchen light watts must be from fluorescent lights. | $52,000 |
| May 14, 2007 | Completed final sign-off Feb 2008 | 475 Lombard St | unit #3: kitchen remodel - remodel of (e) cabinets and appliances and installation of new appliances. changes in lighting. replace trim. replace fireplace with gas. bathroom remodel (two) bathrooms. one new tub and 2 showers. refinish floors. sheetrock repair. install new furnace in (e) location.Details
unit #3: kitchen remodel - remodel of (e) cabinets and appliances and installation of new appliances. changes in lighting. replace trim. replace fireplace with gas. bathroom remodel (two) bathrooms. one new tub and 2 showers. refinish floors. sheetrock repair. install new furnace in (e) location. | $175,000 |
| Sep 20, 2006 | Completed final sign-off Sep 2006 | 1544 Church St | renew expired permit #200511047421 for final inspector.Details
renew expired permit #200511047421 for final inspector. | |
| Aug 10, 2006 | Completed final sign-off Aug 2006 | 1544 Church St | renew pa200511047421 for final inspection.Details
renew pa200511047421 for final inspection. | |
| Nov 4, 2005 | Expired or cancelled expired Aug 2006 | 1544 Church St | upgrade bathroom to meet ada (new toilet & sink) & new front door. (bathroom to be accessable)Details
upgrade bathroom to meet ada (new toilet & sink) & new front door. (bathroom to be accessable) | $10,000 |