Stella General Contracting Services
- Based in
- San Mateo
- On San Francisco permits
- Mar 2014 to Jun 2026
- Last 24 months
- 5 permits filed
8 permits since 2000: 2 completed, 4 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 22, 2026 | In progress issued Jun 2026 | 490 34th Av | unit 3: kitchen remodel: cabinets/counter tops/upgrade electrical panel. approximately 56sf.Details
unit 3: kitchen remodel: cabinets/counter tops/upgrade electrical panel. approximately 56sf. | $18,500 |
| Nov 13, 2025 | In progress issued Mar 2026 | 456 Los Palmos Dr | horizontal addition: expand 2nd floor bathroom to (e) deck area. remodel kitchen. replacement of windows, installation of skylights.Details
horizontal addition: expand 2nd floor bathroom to (e) deck area. remodel kitchen. replacement of windows, installation of skylights. | $140,000 |
| Nov 3, 2025 | Completed final sign-off Jan 2026 | 662 Colby St | remove and replace sheetrock and insulation 2 bedroom ceilings. remove knob and tube and install updated electrical wires to existing panel. install recessed lights and outlets in bedrooms and kitchen. relocate gas line 3 ft away from existing.Details
remove and replace sheetrock and insulation 2 bedroom ceilings. remove knob and tube and install updated electrical wires to existing panel. install recessed lights and outlets in bedrooms and kitchen. relocate gas line 3 ft away from existing. | $35,000 |
| Oct 15, 2025 | In progress issued Oct 2025 | 456 Los Palmos Dr | bathroom remodel. change tub to stand up shower. like for like.Details
bathroom remodel. change tub to stand up shower. like for like. | $18,000 |
| Sep 8, 2025 | In progress issued Dec 2025 | 226 Bridgeview Dr | basement: propose interior staircase. add new bath, media room, entertainment area & storage.Details
basement: propose interior staircase. add new bath, media room, entertainment area & storage. | $200,000 |
| Aug 24, 2018 | Never finaled issued Aug 2018, no final | 466 Head St | renew for completion of workDetails
renew for completion of work | $60,000 |
| Feb 22, 2017 | Completed final sign-off May 2017 | 260 King St | unit # 875 -interior renovation of an (e) 1 bedroom condo to subdivide (e) living space to provide a 2nd bedrm/office. renovation includes (n) dividing wall, modification to (e) electrical, heating, fire sprinklers & drywall patching as needed. sprinklers under separate permit. n/a ordinance #155-13Details
unit # 875 -interior renovation of an (e) 1 bedroom condo to subdivide (e) living space to provide a 2nd bedrm/office. renovation includes (n) dividing wall, modification to (e) electrical, heating, fire sprinklers & drywall patching as needed. sprinklers under separate permit. n/a ordinance #155-13 | $5,000 |
| Mar 14, 2014 | Expired or cancelled expired Aug 2018 | 466 Head St | replace masonry foundation. remodel (e) kitchen, expand dining room. add new bathroom in basement & rebuild deck.Details
replace masonry foundation. remodel (e) kitchen, expand dining room. add new bathroom in basement & rebuild deck. | $165,000 |