Steadfast Bay Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2018 to Dec 2025
- Last 24 months
- 1 permit filed
8 permits since 2000: 5 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 13, 2025 | In progress filed Dec 2025, not yet issued | 249 Peru Av | remove rear portion of the building, excavate crawl space and grade at rear yard to create new basement, new interior stairs connecting 1st floor with basement; horizontal addition at rear yard for 1st floor and basement, relocate kitchen and bathroom in first floor; new window and exterior doors.Details
remove rear portion of the building, excavate crawl space and grade at rear yard to create new basement, new interior stairs connecting 1st floor with basement; horizontal addition at rear yard for 1st floor and basement, relocate kitchen and bathroom in first floor; new window and exterior doors. | $250,000 |
| Sep 7, 2022 | Completed final sign-off Nov 2022 | 1479 05th Av | bathroom remodel in kind. one sink, shower, bathtub, new electrical, tile.Details
bathroom remodel in kind. one sink, shower, bathtub, new electrical, tile. | $12,500 |
| Mar 4, 2022 | Expired or cancelled cancelled Jan 2026 | 1830 09th Av | temporary shoring plans per bid vz request. ref pa202102184903.Details
temporary shoring plans per bid vz request. ref pa202102184903. | $3,000 |
| Apr 7, 2021 | Completed final sign-off Jun 2021 | 300 Flood Av | replacement of rotten wood at garage door, in kind.Details
replacement of rotten wood at garage door, in kind. | $8,000 |
| Apr 7, 2021 | Completed final sign-off May 2021 | 101 Robinhood Dr | replacement of rotten wood at garage door, in kind.Details
replacement of rotten wood at garage door, in kind. | $8,000 |
| May 29, 2019 | Completed final sign-off May 2020 | 1386 10th Av | remodel of (e) 1st flr - bathrm, ofc & den in kind. 2nd flr - kitchen, open wall to (e) medica rm. replace windows at rear ext wall. repair (e) dryrot deck and ext stair less than 50%Details
remodel of (e) 1st flr - bathrm, ofc & den in kind. 2nd flr - kitchen, open wall to (e) medica rm. replace windows at rear ext wall. repair (e) dryrot deck and ext stair less than 50% | $105,000 |
| Oct 3, 2018 | Never finaled issued Dec 2018, no final | 1450 Greenwich St | #501: residential kitchen remodel. remove non-bearing partitions. fill in opening with doors & walls to create second bedroom.Details
#501: residential kitchen remodel. remove non-bearing partitions. fill in opening with doors & walls to create second bedroom. | $30,000 |
| Apr 2, 2018 | Completed final sign-off Jul 2018 | 215 Arkansas St | in kind bathroom remodeling and change kichen cabinets and new countertop. bathroom 62 sq ft, kitchen 160 sq ft.Details
in kind bathroom remodeling and change kichen cabinets and new countertop. bathroom 62 sq ft, kitchen 160 sq ft. | $20,000 |