Stallion Construction
- Based in
- Meadow Vista
- On San Francisco permits
- Jan 2010 to Jun 2010
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2010 | Completed final sign-off Dec 2010 | 4447 23rd St | revision to (e) permit voluntary seismic upgrade to north & south elevation. (n) bridge beam in 2nd. flr. 2-(n) skylights. change to windows for seismic upgrade.Details
revision to (e) permit voluntary seismic upgrade to north & south elevation. (n) bridge beam in 2nd. flr. 2-(n) skylights. change to windows for seismic upgrade. | $10,000 |
| Jan 8, 2010 | Completed final sign-off Dec 2010 | 4447 23rd St | build new stairs connecting 2 stories at lower unit. replace (1) pane window with 2 pane in (e) openings. relcoate basement bath. remodel (2) kitchens & 2 (baths). install new sgd in (e) opening back 2nd floor.Details
build new stairs connecting 2 stories at lower unit. replace (1) pane window with 2 pane in (e) openings. relcoate basement bath. remodel (2) kitchens & 2 (baths). install new sgd in (e) opening back 2nd floor. | $100,000 |