Spnr Built Inc.
- Based in
- San Rafael
- On San Francisco permits
- Sep 2020 to Aug 2026
- Last 24 months
- 5 permits filed
6 permits since 2000: 1 completed, 5 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2026 | In progress issued Aug 2026 | 729 Bay St | remodel (e) kitchen in kind.Details
remodel (e) kitchen in kind. | $75,000 |
| Oct 29, 2025 | In progress issued Oct 2025 | 175 Saint Germain Av | replace (e) windows in-kind, including street facing windows.windows with mullions will be replaced with windows without mullions. floor to ceiling windows facing the balcony will be replaced with the sliding doors. the existing door to the balcony will be replaced with a fixed window.(aluminum)Details
replace (e) windows in-kind, including street facing windows.windows with mullions will be replaced with windows without mullions. floor to ceiling windows facing the balcony will be replaced with the sliding doors. the existing door to the balcony will be replaced with a fixed window.(aluminum) | $112,000 |
| Sep 24, 2025 | In progress issued Sep 2025 | 2859 22nd St | revision to permit 202009254954. replace (e) masonry front wall in-kind with new brick-clad framed wall. revised title 24 report. reduce height of (e) south wall to 10 ftDetails
revision to permit 202009254954. replace (e) masonry front wall in-kind with new brick-clad framed wall. revised title 24 report. reduce height of (e) south wall to 10 ft | |
| Sep 3, 2025 | Completed final sign-off Oct 2025 | 48 Cook St | recommencement and completion of work approved under 202304256432Details
recommencement and completion of work approved under 202304256432 | $19,000 |
| Feb 5, 2025 | In progress issued Jun 2025 | 175 Saint Germain Av | revision to bpa# 202404190359: lower level bathroom renovation, fixtures to be replaced in kind. 1/f kitchen renovation. 2/f bedroom and bathroom renovation. new skylights at roof. new hvac system and electrical system upgrades. exterior patching in kind replacement of cladding as needed.Details
revision to bpa# 202404190359: lower level bathroom renovation, fixtures to be replaced in kind. 1/f kitchen renovation. 2/f bedroom and bathroom renovation. new skylights at roof. new hvac system and electrical system upgrades. exterior patching in kind replacement of cladding as needed. | $100,000 |
| Sep 25, 2020 | In progress issued Jul 2025 | 2859 22nd St | vertical addition. change of use and change of occupancy from religious building to multi-family residence. interior renovation to an exist non residential bldg, interior demo. all exist. perimeter walls to remain.Details
vertical addition. change of use and change of occupancy from religious building to multi-family residence. interior renovation to an exist non residential bldg, interior demo. all exist. perimeter walls to remain. | $600,000 |