Spellbound Construction
- Based in
- Novato
- On San Francisco permits
- Mar 2008 to Aug 2023
- Last 24 months
- 0 permits filed
25 permits since 2000: 23 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 10, 2023 | Completed final sign-off Mar 2024 | 75 Yerba Buena Av | primary (one) bathroom remodel. replace in kind.Details
primary (one) bathroom remodel. replace in kind. | $25,000 |
| Dec 22, 2022 | Completed final sign-off Nov 2024 | 3680 Sacramento St | to comply with accessible business program ord 51-16 abe #202209164483. install automatic door opener. insttall new tapered threshold.Details
to comply with accessible business program ord 51-16 abe #202209164483. install automatic door opener. insttall new tapered threshold. | $5,000 |
| Oct 18, 2021 | Completed final sign-off Dec 2021 | 3350 Divisadero St | remodel in kind 2 bathrooms. install new doors. install new carpet and flooring. misc finish work. install new fixtures existing. working only on 2nd floor replacement <in-kind> in weight and area.Details
remodel in kind 2 bathrooms. install new doors. install new carpet and flooring. misc finish work. install new fixtures existing. working only on 2nd floor replacement <in-kind> in weight and area. | $40,000 |
| Oct 6, 2020 | Completed final sign-off Dec 2020 | 2944 Divisadero St | bathroom remodel - nbew shower/vanity/lighting/fixtures/tile, new tile floor in 1/2 bathDetails
bathroom remodel - nbew shower/vanity/lighting/fixtures/tile, new tile floor in 1/2 bath | $25,000 |
| Dec 7, 2017 | Completed final sign-off Dec 2017 | 189 06th Av | to obtain final inspection for work approved under pa #2014.0710.0876. all work is complete.Details
to obtain final inspection for work approved under pa #2014.0710.0876. all work is complete. | |
| Sep 15, 2017 | Completed final sign-off Nov 2017 | 301 Bryant St | unit #403: bathroom (2) and kitchen remodel - new tile & fixtures. new kitchen cabniets and appliances, new tile, upgrade electrical device & fixture. no structure workDetails
unit #403: bathroom (2) and kitchen remodel - new tile & fixtures. new kitchen cabniets and appliances, new tile, upgrade electrical device & fixture. no structure work | $80,000 |
| Apr 11, 2017 | Completed final sign-off Feb 2018 | 723 35th Av | rear sun room repair.Details
rear sun room repair. | $7,000 |
| May 1, 2015 | Completed final sign-off Jun 2015 | 101 States St | unit #2 - to comply w/complaint #201534081: install 12" x 30" window in top floor bedroom for ventilation.Details
unit #2 - to comply w/complaint #201534081: install 12" x 30" window in top floor bedroom for ventilation. | $1,000 |
| Aug 26, 2014 | Completed final sign-off Feb 2015 | 101 States St | unit #2. replace private existing deck. replace in kind. decking repairs less than 50% of deck.Details
unit #2. replace private existing deck. replace in kind. decking repairs less than 50% of deck. | $5,000 |
| Jul 10, 2014 | Expired or cancelled expired Nov 2017 | 189 06th Av | change of use from vacant retail to limited restaurant. remodel of (e) bathroom to make it ada compliant, plumbing & electrical work. interior t.i. workDetails
change of use from vacant retail to limited restaurant. remodel of (e) bathroom to make it ada compliant, plumbing & electrical work. interior t.i. work | $40,000 |
| May 14, 2014 | Completed final sign-off Feb 2015 | 101 States St | unit 2- remodel bathroom replace all fixtures in same locationss; replace sliding door/ rear door/ bathroom window u factor of .4; new hardwood flooring on 2/f/ re-finish (e) hardwood on 1/f; install recessed can lightings/ lower bay window framing/ paint interior/ misc. rot repair,Details
unit 2- remodel bathroom replace all fixtures in same locationss; replace sliding door/ rear door/ bathroom window u factor of .4; new hardwood flooring on 2/f/ re-finish (e) hardwood on 1/f; install recessed can lightings/ lower bay window framing/ paint interior/ misc. rot repair, | $68,000 |
| May 7, 2014 | Completed final sign-off Jun 2014 | 206 12th Av | renew and final expired pa# 200908104499Details
renew and final expired pa# 200908104499 | |
| May 7, 2014 | Completed final sign-off Jun 2014 | 206 12th Av | to comply with physical inspection report #cc-7544Details
to comply with physical inspection report #cc-7544 | $7,500 |
| Oct 22, 2013 | Completed final sign-off Dec 2013 | 3348 Divisadero St | kitchen remodel-upgrade electrical & plumbing to code,replace cabinets and appliances, refinish floors/3 replacement windows,not visible from the street, new countertops, max. u-factor 0.4Details
kitchen remodel-upgrade electrical & plumbing to code,replace cabinets and appliances, refinish floors/3 replacement windows,not visible from the street, new countertops, max. u-factor 0.4 | $11,500 |
| Apr 30, 2013 | Completed final sign-off Aug 2013 | 2773 Folsom St | unit #101:install new steel beams/remove extg posts/sound proofing. install sliding door/install sound proof windows/misc interior remodeling/add electrical circuits.Details
unit #101:install new steel beams/remove extg posts/sound proofing. install sliding door/install sound proof windows/misc interior remodeling/add electrical circuits. | $70,000 |
| Aug 23, 2012 | Completed final sign-off Nov 2012 | 119 Edgewood Av | master bedroom closet remodel-remove existing closet doors, install new lighting/cabinets/flooring/shelving units at closeDetails
master bedroom closet remodel-remove existing closet doors, install new lighting/cabinets/flooring/shelving units at close | $12,000 |
| Jun 12, 2012 | Completed final sign-off Aug 2012 | 2811 Jackson St | install built in bookshelves and gas fireplace/ redo lighting/ raise hall entry opening -non structural/ insulate exterior walls.Details
install built in bookshelves and gas fireplace/ redo lighting/ raise hall entry opening -non structural/ insulate exterior walls. | $12,500 |
| Mar 6, 2012 | Completed final sign-off Aug 2012 | 301 Bryant St | 1 bathroom remodel. new tile/fixtures/glass in shower. reuse extg 1 piece stone pan. new countertop/misc painting/etcDetails
1 bathroom remodel. new tile/fixtures/glass in shower. reuse extg 1 piece stone pan. new countertop/misc painting/etc | $10,000 |
| Jun 14, 2011 | Completed final sign-off Sep 2011 | 301 Bryant St | unit #603 remodel bathroom; bath 1 - new tile/shower valve/frameless glass door. bath 2- new tub/new tile/shower valve/frameless glass screen.Details
unit #603 remodel bathroom; bath 1 - new tile/shower valve/frameless glass door. bath 2- new tub/new tile/shower valve/frameless glass screen. | $10,000 |
| Apr 21, 2011 | Completed final sign-off Aug 2011 | 12 Sharp Pl | bath addition/reconfigure closet/move waterheater double pane window inserts @ basement (lowest level).Details
bath addition/reconfigure closet/move waterheater double pane window inserts @ basement (lowest level). | $26,000 |
| Feb 18, 2011 | Never finaled issued Feb 2011, no final | 2333 Octavia St | revision to 201009140817. switch from solid glass guardrails t glass with heavy base shoeDetails
revision to 201009140817. switch from solid glass guardrails t glass with heavy base shoe | $1,000 |
| Sep 14, 2010 | Completed final sign-off Apr 2011 | 2333 Octavia St | new stair to roof at 2nd level (exterior) new roof deck (ipe w/ipe and glass tempered guardrails) new louvered step lights, new irrigation system for planters at guardrailsDetails
new stair to roof at 2nd level (exterior) new roof deck (ipe w/ipe and glass tempered guardrails) new louvered step lights, new irrigation system for planters at guardrails | $35,000 |
| Jul 23, 2010 | Completed final sign-off Mar 2011 | 2333 Octavia St | kitchen remodel-addition to (e) pa# 2010-0504-1687-hydronic heating upgrade & insulationDetails
kitchen remodel-addition to (e) pa# 2010-0504-1687-hydronic heating upgrade & insulation | $34,000 |
| May 4, 2010 | Completed final sign-off Apr 2011 | 2333 Octavia St | replace 30 windows ( front, side and rear) and sliding doors (3). remodel 3 baths and one powder rm, new tile and fixtures. relocate laundry rm. replace carpet. no struc. work. add w/d to bedrm.Details
replace 30 windows ( front, side and rear) and sliding doors (3). remodel 3 baths and one powder rm, new tile and fixtures. relocate laundry rm. replace carpet. no struc. work. add w/d to bedrm. | $100,000 |
| Mar 18, 2008 | Completed final sign-off May 2008 | 1568 36th Av | bathroom remodel. new bath tub (jacuzzi type) with tiled surround new varity cabinet w/ 2 sinks, new toiledt, double replacement windows (2), new head/fan/light, new tile floor. wainscot, new bathroom dedicated circuit, painting, finish work. windows u-factor < 0.67Details
bathroom remodel. new bath tub (jacuzzi type) with tiled surround new varity cabinet w/ 2 sinks, new toiledt, double replacement windows (2), new head/fan/light, new tile floor. wainscot, new bathroom dedicated circuit, painting, finish work. windows u-factor < 0.67 |