Sp Carpet Pros Inc
- Based in
- Foster City
- On San Francisco permits
- Aug 2007 to Sep 2010
- Last 24 months
- 0 permits filed
40 permits since 2000: 32 completed, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2010 | Completed final sign-off Mar 2011 | 2906 Bush St | remove and replace kitchen; upgrade electrical, rework gas to meet code. install new existing vent and ducting replace plumbing in wall behind sink with copper water supply lines. install refrigerator water supply box in wall with 1/2" copper and shut off valve.Details
remove and replace kitchen; upgrade electrical, rework gas to meet code. install new existing vent and ducting replace plumbing in wall behind sink with copper water supply lines. install refrigerator water supply box in wall with 1/2" copper and shut off valve. | $20,000 |
| Aug 30, 2010 | Completed final sign-off Oct 2010 | 1900 Lyon St | remodel bathroom, replace bath tub & tile tub walls, replace bath fan vent, replace vanity, replace tile area 8x5. fan connect to exsiting duct. high efficacy lighting or occupancy sensor.Details
remodel bathroom, replace bath tub & tile tub walls, replace bath fan vent, replace vanity, replace tile area 8x5. fan connect to exsiting duct. high efficacy lighting or occupancy sensor. | $8,000 |
| Jul 19, 2010 | Never finaled issued Jul 2010, no final | 1440 Webster St | Details
| $12,000 |
| Jun 24, 2010 | Never finaled issued Jun 2010, no final | 3325 Folsom St | kitchen remodel: no structural changes; relocate gas valve for range; 3 new circuits for major appliances; 7 - 8 new recessed flourescent fixtures (title 24 compliant); new cabinetry and appliances.Details
kitchen remodel: no structural changes; relocate gas valve for range; 3 new circuits for major appliances; 7 - 8 new recessed flourescent fixtures (title 24 compliant); new cabinetry and appliances. | $12,000 |
| Jun 16, 2010 | Completed final sign-off Sep 2010 | 950 Holloway Av | kitchen remodel: remove non bearing wall and old flue, 11 new receptacles for countertop outlets and major appliances, new cabinets, appliances, lighting. title 24 compliant, under cabinet lighting. replace window. new waterline for fridge.Details
kitchen remodel: remove non bearing wall and old flue, 11 new receptacles for countertop outlets and major appliances, new cabinets, appliances, lighting. title 24 compliant, under cabinet lighting. replace window. new waterline for fridge. | $20,000 |
| May 27, 2010 | Never finaled issued May 2010, no final | 601 Van Ness Av | kitchen remodel: remove and replace cabinets appliances and fixtures at extg location. no structural changes. min 50% of kitchen light watts shall be in high efficency lights.Details
kitchen remodel: remove and replace cabinets appliances and fixtures at extg location. no structural changes. min 50% of kitchen light watts shall be in high efficency lights. | $8,000 |
| May 27, 2010 | Never finaled issued May 2010, no final | 3241 Mission St | kitchen remodel and remove and replace cabnets and appliances and fixtures at extg locations, no structural changes. min. 50% of kitchen lighting watts shall be in high efficency.Details
kitchen remodel and remove and replace cabnets and appliances and fixtures at extg locations, no structural changes. min. 50% of kitchen lighting watts shall be in high efficency. | $8,000 |
| Apr 21, 2010 | Completed final sign-off Dec 2010 | 2645 Leavenworth St | kitchen remodel: upgrade elect. in compliance with title 24. rmeove and replace cabinets, appliances and fixtures at (e) locations. no structural changes. min. 50% of kitchen lighting wattage to be of high efficacy lights.Details
kitchen remodel: upgrade elect. in compliance with title 24. rmeove and replace cabinets, appliances and fixtures at (e) locations. no structural changes. min. 50% of kitchen lighting wattage to be of high efficacy lights. | $22,000 |
| Apr 5, 2010 | Completed final sign-off Dec 2010 | 42 Topaz Wy | kitchen remodel: install new cabinets and fixtures and appliances. all to (e) locations. upgrade electrical in compliance with title 24. install recessed led can lights @ celing. no structural changes.Details
kitchen remodel: install new cabinets and fixtures and appliances. all to (e) locations. upgrade electrical in compliance with title 24. install recessed led can lights @ celing. no structural changes. | $18,000 |
| Jan 28, 2010 | Completed final sign-off Jul 2010 | 789 48th Av | upstairs bathroom remodel: upgrade electrical in compliance w/ title24. install pressure balance valve. (n) tub, vanity w/ all (n) plumbing connections @ (e) locations. tile floor & walls. no structrural changes. downstairs bathroom: install (n) plumbing & supply & drain lines toilet/shower/sink,Details
upstairs bathroom remodel: upgrade electrical in compliance w/ title24. install pressure balance valve. (n) tub, vanity w/ all (n) plumbing connections @ (e) locations. tile floor & walls. no structrural changes. downstairs bathroom: install (n) plumbing & supply & drain lines toilet/shower/sink, | $42,000 |
| Nov 24, 2009 | Completed final sign-off Apr 2011 | 1068 14th St | 2 bathroom remodels. includes rough plumbing, relocate toilets, tub, shower, vanities, lighting, gfci, exhaust fans, motion sensor for main light. hot mop shower panDetails
2 bathroom remodels. includes rough plumbing, relocate toilets, tub, shower, vanities, lighting, gfci, exhaust fans, motion sensor for main light. hot mop shower pan | $32,000 |
| Nov 10, 2009 | Completed final sign-off Jan 2010 | 28 Clayton St | kitchen remodel: remove & repl kitchen cabinets, upgrade electrical in compliance with title 24- install gfci outlets, remove & replace kitchen faucet and appliancesDetails
kitchen remodel: remove & repl kitchen cabinets, upgrade electrical in compliance with title 24- install gfci outlets, remove & replace kitchen faucet and appliances | $15,000 |
| Oct 22, 2009 | Never finaled issued Oct 2009, no final | 184 Marview Wy | bathroom remodel: remove and replace shower pan/toilet, & vanity. in same location, hot mop shower pan. install pressure balance valve shower and new faucet & p trap vanity. tile floor and replace gfci outlet. no structural changes.Details
bathroom remodel: remove and replace shower pan/toilet, & vanity. in same location, hot mop shower pan. install pressure balance valve shower and new faucet & p trap vanity. tile floor and replace gfci outlet. no structural changes. | $11,000 |
| Oct 6, 2009 | Completed final sign-off Dec 2009 | 2547 37th Av | kitchen remodel - remove & replace kitchen cabinets. upgrade elec in compliance w/ title 24. install gfci outlets dedicated circuits & floor. ceiling fixture. in like kind. no structural changes.Details
kitchen remodel - remove & replace kitchen cabinets. upgrade elec in compliance w/ title 24. install gfci outlets dedicated circuits & floor. ceiling fixture. in like kind. no structural changes. | $16,000 |
| Oct 6, 2009 | Completed final sign-off Oct 2009 | 1921 Jefferson St | unit 306 - bathroom remodel - install pressure balance volve shower. install new vanity sink & faucet (e) location. install gfci outlet & motion sensor light switche (e) location. no structural changes.Details
unit 306 - bathroom remodel - install pressure balance volve shower. install new vanity sink & faucet (e) location. install gfci outlet & motion sensor light switche (e) location. no structural changes. | $5,000 |
| Aug 13, 2009 | Completed final sign-off Nov 2009 | 156 Park St | kitchen remodel. remove and replace kitchen cabinets. no structural changes. upgrade elec with compliance title 24, gfci outlets,dedicated circuits for appliances. floor, lighting. new appliances. min 50% high eff lightingDetails
kitchen remodel. remove and replace kitchen cabinets. no structural changes. upgrade elec with compliance title 24, gfci outlets,dedicated circuits for appliances. floor, lighting. new appliances. min 50% high eff lighting | $18,500 |
| Jun 30, 2009 | Never finaled issued Jun 2009, no final | 1372 Broadway | master bath remodel. install new tub ceiling fan / light. pressure balance value. re-install toilet (e) location. install new sink & faucet.Details
master bath remodel. install new tub ceiling fan / light. pressure balance value. re-install toilet (e) location. install new sink & faucet. | $10,000 |
| Jun 29, 2009 | Completed final sign-off Sep 2009 | 323 Melrose Av | kitchen remodel. upgrade electrical to meet title 24. dedicated circuits. install flour can lights. remove and replace kchn cabinets. no structural changes. install drywall offer elect. work.Details
kitchen remodel. upgrade electrical to meet title 24. dedicated circuits. install flour can lights. remove and replace kchn cabinets. no structural changes. install drywall offer elect. work. | $14,500 |
| Jun 1, 2009 | Completed final sign-off Aug 2009 | 1995 43rd Av | kitchen remodel. remove & replace cabinets, upgrade electrical to meet title 24 requirements, gfci outlets & dedicated appliance circuits. flourescent lighting. install new sink at (e) location & refer water line. install vinyl flooring.Details
kitchen remodel. remove & replace cabinets, upgrade electrical to meet title 24 requirements, gfci outlets & dedicated appliance circuits. flourescent lighting. install new sink at (e) location & refer water line. install vinyl flooring. | $11,000 |
| May 19, 2009 | Completed final sign-off May 2010 | 2710 California St | kitchen remodel: remove and replace kitchen cabinets. upgrade electrical in compliance with title 24. install flourescent ceiling recessed can lights, flourescent under cabinet lights. gfci outlets, dedicated circuits for major appliances. no structural changes.Details
kitchen remodel: remove and replace kitchen cabinets. upgrade electrical in compliance with title 24. install flourescent ceiling recessed can lights, flourescent under cabinet lights. gfci outlets, dedicated circuits for major appliances. no structural changes. | $25,000 |
| May 5, 2009 | Completed final sign-off Jul 2009 | 999 Wisconsin St | work @ unit# 11 only. kitchen remodel: install new cabinets. same location. no structural changes. upgrade electrical in compliance with title 24. 50% of kitchen light. install new appliances. same location. watts in high efficancy lights.Details
work @ unit# 11 only. kitchen remodel: install new cabinets. same location. no structural changes. upgrade electrical in compliance with title 24. 50% of kitchen light. install new appliances. same location. watts in high efficancy lights. | $15,000 |
| Nov 17, 2008 | Completed final sign-off Mar 2009 | 416 Molimo Dr | bathroom remodel: install new air tub at (e) location, new toilet at (e) location. move vanity and utilize (e0dwv install gfci outlets. tile floor & shower/tub walls. install flour. light or motion sensor switch in compliance w/title 24.Details
bathroom remodel: install new air tub at (e) location, new toilet at (e) location. move vanity and utilize (e0dwv install gfci outlets. tile floor & shower/tub walls. install flour. light or motion sensor switch in compliance w/title 24. | $11,000 |
| Nov 5, 2008 | Completed final sign-off Jan 2009 | 115 Masonic Av | unit#117 only. kitchen remodel: upgrade electr/ic w/compliance w/title 24.install new cabinets & appliances at (e) locations. no structural changes.Details
unit#117 only. kitchen remodel: upgrade electr/ic w/compliance w/title 24.install new cabinets & appliances at (e) locations. no structural changes. | $18,000 |
| Oct 14, 2008 | Completed final sign-off Apr 2009 | 278 Vernon St | remove and replace ktichen cabinets. install new appliances at (e) locations. no structural changes. upgrade elect. panel. install gfci, upgrade kitchen electrical in compliance w/title 24. includes running duct exhaust for hood.Details
remove and replace ktichen cabinets. install new appliances at (e) locations. no structural changes. upgrade elect. panel. install gfci, upgrade kitchen electrical in compliance w/title 24. includes running duct exhaust for hood. | $17,000 |
| Aug 27, 2008 | Completed final sign-off Feb 2009 | 2040 Franklin St | remove & replace kitchen cabinets. install new appliances, upgrade electrical w/ compliance to title 24. no structural changes. no work on windows/wall/door. lite safety under separate permits.Details
remove & replace kitchen cabinets. install new appliances, upgrade electrical w/ compliance to title 24. no structural changes. no work on windows/wall/door. lite safety under separate permits. | $23,000 |
| Aug 18, 2008 | Completed final sign-off Oct 2008 | 1449 Willard St | work @ unit #1449 only. kitchen remodel. upgrade electrical to code. install new cabinets & reinstall existing appliances. any electrical or plumbing work will required appropriate separate permits.Details
work @ unit #1449 only. kitchen remodel. upgrade electrical to code. install new cabinets & reinstall existing appliances. any electrical or plumbing work will required appropriate separate permits. | $20,000 |
| Jul 14, 2008 | Expired or cancelled expired Jan 2009 | 4622 17th St | work @ unit# 4626 only. 1 kitchen remodel. install new cabinets & appliances in same locations. upgrade electrical & plumbing to meet code requirements @ 1st floor. no change walls, windows, doors.Details
work @ unit# 4626 only. 1 kitchen remodel. install new cabinets & appliances in same locations. upgrade electrical & plumbing to meet code requirements @ 1st floor. no change walls, windows, doors. | $17,000 |
| Jul 14, 2008 | Completed final sign-off Sep 2008 | 2310 25th Av | 1 kitchen remodel. install new cabinets & appliances with existing locations. upgrade electrical & plumbing to meet current code requirements. no change to windows, door. no change to exit.Details
1 kitchen remodel. install new cabinets & appliances with existing locations. upgrade electrical & plumbing to meet current code requirements. no change to windows, door. no change to exit. | $25,000 |
| Jul 10, 2008 | Completed final sign-off Nov 2008 | 924 Dwight St | remove & replace kitchen cabinets, install gfci, and dedicated circuits for appliances. install water line for refer. install flourescent light fixture box ceiling. all appliances located some location. no structural.Details
remove & replace kitchen cabinets, install gfci, and dedicated circuits for appliances. install water line for refer. install flourescent light fixture box ceiling. all appliances located some location. no structural. | $16,800 |
| Jun 18, 2008 | Completed final sign-off Oct 2008 | 1159 Bosworth St | work @ unit# 1161 only. kitchen remodel: remove & replace kitchen cabinets, install dedicated circuits at new sub panel for electrical code upgrades. isntall gfci outlets & undercounter flour. lights. install vinyl floor & new appliances at same (e) location. ceiling light flourescent fixture box.Details
work @ unit# 1161 only. kitchen remodel: remove & replace kitchen cabinets, install dedicated circuits at new sub panel for electrical code upgrades. isntall gfci outlets & undercounter flour. lights. install vinyl floor & new appliances at same (e) location. ceiling light flourescent fixture box. | $21,000 |
| Jun 18, 2008 | Completed final sign-off Oct 2008 | 1819 Baker St | kitchen remodel. remove & replace (e) cabinets in same location. modify plumbing & gas line to accomodate code requirement. install vinyl flooring. install appliances. no structural changes. new lighting flourescent.Details
kitchen remodel. remove & replace (e) cabinets in same location. modify plumbing & gas line to accomodate code requirement. install vinyl flooring. install appliances. no structural changes. new lighting flourescent. | $15,000 |
| May 27, 2008 | Completed final sign-off Mar 2009 | 1177 California St | work @ unit# 1402 only. kitchen & bathroom remodel. kitchen. remove & replace cabinets. all appliances & fixtures to remain in (e) location. bathroom: install pressure balance valve. remove & replace vanity same location (install shutt off valve for unit) install new tile over existing tub.Details
work @ unit# 1402 only. kitchen & bathroom remodel. kitchen. remove & replace cabinets. all appliances & fixtures to remain in (e) location. bathroom: install pressure balance valve. remove & replace vanity same location (install shutt off valve for unit) install new tile over existing tub. | $15,000 |
| Apr 28, 2008 | Completed final sign-off Jul 2008 | 88 Rudden Av | kitchen remodel: remove + replace kitchen cabinets upgrade electrical -add gfci, can fluorencent lights. install new laminate floor. no structural work. new lighting to be high efficacy or 50 max wattage incadescent.Details
kitchen remodel: remove + replace kitchen cabinets upgrade electrical -add gfci, can fluorencent lights. install new laminate floor. no structural work. new lighting to be high efficacy or 50 max wattage incadescent. | $19,000 |
| Apr 7, 2008 | Completed final sign-off Jun 2008 | 257 Beverly St | kitchen remodel. remove and replace kitchen cabinets. install additional gfci outlets, dedicate circuits for applances, install elect. range all appliances going in same locations. install fluorescant light fixture ceilings. install new hood, connect ot (e) duct.Details
kitchen remodel. remove and replace kitchen cabinets. install additional gfci outlets, dedicate circuits for applances, install elect. range all appliances going in same locations. install fluorescant light fixture ceilings. install new hood, connect ot (e) duct. | $15,000 |
| Jan 23, 2008 | Expired or cancelled expired Jul 2009 | 25 Chaves Av | renew pa# 2006/09/05/1436 to continuous work.Details
renew pa# 2006/09/05/1436 to continuous work. | $25,100 |
| Nov 19, 2007 | Completed final sign-off May 2008 | 172 Marview Wy | kitchen remodel. remove & replace cabinets & appliances in (e) location. no structural work. 50% of lighting to be fluorescant.Details
kitchen remodel. remove & replace cabinets & appliances in (e) location. no structural work. 50% of lighting to be fluorescant. | $16,000 |
| Oct 25, 2007 | Completed final sign-off Feb 2008 | 174 21st Av | kitchen remodel. install recessed fluor. can lights, gfci, install new cabinets, gas line for range, new appliances in existing locations.Details
kitchen remodel. install recessed fluor. can lights, gfci, install new cabinets, gas line for range, new appliances in existing locations. | $15,000 |
| Oct 19, 2007 | Completed final sign-off Feb 2008 | 666 Noe St | kitchen remodel . remove cabinets and floor and install new in same location. install fluorescent ceiling light and gfi outlets. install gas valve inside cabinet next to range. install new appliances in same location. no structural cahnges. add fluorescent light.Details
kitchen remodel . remove cabinets and floor and install new in same location. install fluorescent ceiling light and gfi outlets. install gas valve inside cabinet next to range. install new appliances in same location. no structural cahnges. add fluorescent light. | $10,000 |
| Aug 30, 2007 | Completed final sign-off Nov 2007 | 46 Atalaya Tr | kitchen remodel. remove cabinets and floor and install new in same location. install flour can lights and gfci. install gas valve inside cabinet next to range. install new appliances in same location. no structural changesDetails
kitchen remodel. remove cabinets and floor and install new in same location. install flour can lights and gfci. install gas valve inside cabinet next to range. install new appliances in same location. no structural changes | $18,700 |
| Aug 1, 2007 | Completed final sign-off Oct 2007 | 48 Malta Dr | kitchen remodel, new cabinets, upgrade electrical, recessed flourescent can lights. to comply w/ title 24 energy codes.Details
kitchen remodel, new cabinets, upgrade electrical, recessed flourescent can lights. to comply w/ title 24 energy codes. | $18,000 |