Southland Industries
- Based in
- Garden Grove
- On San Francisco permits
- Apr 2005 to Dec 2024
- Last 24 months
- 2 permits filed
19 permits since 2000: 13 completed, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 11, 2024 | Completed final sign-off Feb 2025 | 360 03rd St | changing out 2 existing 15 ton computer room air handlers with 2 new liebert computer room handlers.Details
changing out 2 existing 15 ton computer room air handlers with 2 new liebert computer room handlers. | $190,000 |
| Oct 23, 2024 | Completed final sign-off Jan 2025 | 1580 Valencia St | replacing (1) hvac system for 1st floor and replacing (1) vrf condensing unit with (n) unit and replace (8) ductless fan coils with (n) units and reconnect (e) refrigerant piping and drains pressure test piping and units and recharge with new r410a refrigerantDetails
replacing (1) hvac system for 1st floor and replacing (1) vrf condensing unit with (n) unit and replace (8) ductless fan coils with (n) units and reconnect (e) refrigerant piping and drains pressure test piping and units and recharge with new r410a refrigerant | $117,000 |
| Jun 28, 2024 | Completed final sign-off Apr 2026 | 45 Castro St | 4th floor- ceiling tiles are being demo to gain access above ceiling . remove and replace heating hot water coils with like for like replacements as well as installing new control dampers for cav mechanical system and clean ductwork. ceiling tiles to be replace.Details
4th floor- ceiling tiles are being demo to gain access above ceiling . remove and replace heating hot water coils with like for like replacements as well as installing new control dampers for cav mechanical system and clean ductwork. ceiling tiles to be replace. | $2,000,000 |
| Oct 6, 2023 | Completed final sign-off Oct 2024 | 360 03rd St | replace (2) 80 ton air-cooled chillers on roof along with three chillers water pumps. no work in the interior of the building.Details
replace (2) 80 ton air-cooled chillers on roof along with three chillers water pumps. no work in the interior of the building. | $300,000 |
| Dec 17, 2019 | Completed final sign-off Jan 2023 | 72 Ellis St | stormwater reviewDetails
stormwater review | |
| Oct 5, 2015 | Completed final sign-off Jan 2016 | 800 Howard St | installation of new ductwork, hydronic piping, plumbing as part of new kitchen space. kitchen to be used for prep only, no cooking. commercial kitchen permitted by pa#201505146378, add two (2) fire smoke dampers.Details
installation of new ductwork, hydronic piping, plumbing as part of new kitchen space. kitchen to be used for prep only, no cooking. commercial kitchen permitted by pa#201505146378, add two (2) fire smoke dampers. | $190,000 |
| Sep 18, 2015 | Completed final sign-off Nov 2015 | 800 Howard St | west pods: tenant improvement of existing retail space into private offices. new mechanical piping and ductwork for hvac ref 201504305062Details
west pods: tenant improvement of existing retail space into private offices. new mechanical piping and ductwork for hvac ref 201504305062 | $250,000 |
| Aug 4, 2015 | Completed final sign-off Feb 2016 | 1200 Van Ness Av | ste.#200 - mechanical remodel/update (e) water service heat pumps with new. plumbing remodel. add bathroom and update breakroom kitchen. ref pa 2015 0723 2309. maher naDetails
ste.#200 - mechanical remodel/update (e) water service heat pumps with new. plumbing remodel. add bathroom and update breakroom kitchen. ref pa 2015 0723 2309. maher na | $250,000 |
| Oct 15, 2014 | Completed final sign-off Jun 2015 | 360 03rd St | 2nd flr: t.i. 201410148742 -for tv studio converting previously unoccupied studio space to useable space; mechanical/electrical only; maher n/aDetails
2nd flr: t.i. 201410148742 -for tv studio converting previously unoccupied studio space to useable space; mechanical/electrical only; maher n/a | $32,000 |
| Oct 14, 2014 | Completed final sign-off Jun 2015 | 360 03rd St | convert previously unoccupied space to useable space adding hvac and electrical. maher not required. t.i. for tv studio.Details
convert previously unoccupied space to useable space adding hvac and electrical. maher not required. t.i. for tv studio. | $15,000 |
| Sep 5, 2014 | Never finaled issued Sep 2014, no final | 360 03rd St | 2nd flr: install 2 vav boxes with hot water reheat/ducting (broadcasting) ;install 1-fan coil unit in rm 231 facility room; maher n/aDetails
2nd flr: install 2 vav boxes with hot water reheat/ducting (broadcasting) ;install 1-fan coil unit in rm 231 facility room; maher n/a | $45,000 |
| Mar 13, 2014 | Never finaled issued Mar 2014, no final | 360 03rd St | remove & replace (2) 50 ton air cooled chillers with (2) 80 ton air cooled chillers. provide new steel structure, provide roof screen. compliance with maher ordinance #155-13 not required, no disturbance of at least 50 cu yd of soil.Details
remove & replace (2) 50 ton air cooled chillers with (2) 80 ton air cooled chillers. provide new steel structure, provide roof screen. compliance with maher ordinance #155-13 not required, no disturbance of at least 50 cu yd of soil. | $280,000 |
| Oct 2, 2013 | Completed final sign-off Oct 2013 | 360 03rd St | temporary cooling for one day media event on 3rd floor.Details
temporary cooling for one day media event on 3rd floor. | $3,000 |
| Oct 22, 2012 | Expired or cancelled expired Aug 2014 | 370 03rd St | install temporary ducting at 3rd floor shell space for comfort cooling at one day basketball media day.Details
install temporary ducting at 3rd floor shell space for comfort cooling at one day basketball media day. | $15,000 |
| Mar 14, 2012 | Completed final sign-off Feb 2013 | 370 03rd St | 2nd/3rd floor t.i., new duct distribution with heating water piping. rooftop air cooled chillers/pumps/cooling tower for 24/7 cooling. req with floor mounted ahus. chilled water piping to ahu's, qty 2 exh fans, qty 1 makeup air unit. mechanical scope only. struc under sep. permit. ref #201203055349Details
2nd/3rd floor t.i., new duct distribution with heating water piping. rooftop air cooled chillers/pumps/cooling tower for 24/7 cooling. req with floor mounted ahus. chilled water piping to ahu's, qty 2 exh fans, qty 1 makeup air unit. mechanical scope only. struc under sep. permit. ref #201203055349 | $850,000 |
| Sep 8, 2011 | Expired or cancelled cancelled Jan 2026 | 200 Paul Av | provide hvac for ups & pdu room.Details
provide hvac for ups & pdu room. | $180,000 |
| Mar 17, 2010 | Completed final sign-off Jan 2011 | 455 Mission Bay Blvd South | mech./plumb. for pa# 2010/01/21/5065 (arch.).Details
mech./plumb. for pa# 2010/01/21/5065 (arch.). | $4,000,000 |
| Sep 14, 2005 | Expired or cancelled expired Nov 2007 | 2351 Clay St | ductwork installation with 2 supply and return diffusers, mechanical ref #200507218267Details
ductwork installation with 2 supply and return diffusers, mechanical ref #200507218267 | $15,000 |
| Apr 12, 2005 | Expired or cancelled expired Aug 2007 | 630 03rd St | relocate 2 crac units and associated condensing units on roof mokify extg duct work to accomodateDetails
relocate 2 crac units and associated condensing units on roof mokify extg duct work to accomodate | $60,000 |