Southland Construction Management
- Based in
- Pleasanton
- On San Francisco permits
- Jan 2010 to Jan 2010
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 26, 2010 | Completed final sign-off Sep 2010 | 865 Market St | interior remodel of (e) retain space-work includes new fixtures, finishes, paint & flooring. no change to stockroom or storefront. minor lighting changes, no increase to (e) electrical load. no change to mechanical, life safety of fire protectionDetails
interior remodel of (e) retain space-work includes new fixtures, finishes, paint & flooring. no change to stockroom or storefront. minor lighting changes, no increase to (e) electrical load. no change to mechanical, life safety of fire protection | $65,000 |