Soruco Structures
- Based in
- Novato
- On San Francisco permits
- Jul 2012 to Aug 2017
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2017 | Completed final sign-off Mar 2018 | 79 Cragmont Av | demo 1-story, type 5, single family building.Details
demo 1-story, type 5, single family building. | $10,000 |
| Aug 4, 2017 | Completed final sign-off Nov 2019 | 79 Cragmont Av | erect 1-story, o basement, type 5, single family bldg.Details
erect 1-story, o basement, type 5, single family bldg. | $150,000 |
| Jun 28, 2017 | Expired or cancelled withdrawn Aug 2017 | 79 Cragmont Av | revision to appln #201505277247. reduction of a floor from a 2-story building to a 1-story, 3-bedroom, 2-bath home.Details
revision to appln #201505277247. reduction of a floor from a 2-story building to a 1-story, 3-bedroom, 2-bath home. | |
| Jun 26, 2015 | Completed final sign-off Mar 2017 | 180 Idora Av | revision to 201405135599. add/extend 2 (e) bedrooms, build deck abovve bedroom. add circular stairs & wooden stairs from 1/f to ground. remodel partial bedrooms & dining room.Details
revision to 201405135599. add/extend 2 (e) bedrooms, build deck abovve bedroom. add circular stairs & wooden stairs from 1/f to ground. remodel partial bedrooms & dining room. | $150,000 |
| Nov 24, 2014 | Completed final sign-off Jan 2016 | 148 03rd Av | lower unit: minor interior lremodel to level 1 and level 2 to include kitchen and bath remodel; upper unit: no work; minor material change to front facade;Details
lower unit: minor interior lremodel to level 1 and level 2 to include kitchen and bath remodel; upper unit: no work; minor material change to front facade; | $75,000 |
| May 13, 2014 | Completed final sign-off Mar 2017 | 180 Idora Av | new second story deck & stairs; upgrade of existing lower level deck.Details
new second story deck & stairs; upgrade of existing lower level deck. | $25,000 |
| Jul 19, 2012 | Completed final sign-off Nov 2012 | 1266 Washington St | comply with nov 201238442. legalize fence and platform. rear yard fence less than 10' tall and retaining walls less than 30" to maintain grade.Details
comply with nov 201238442. legalize fence and platform. rear yard fence less than 10' tall and retaining walls less than 30" to maintain grade. | $4,000 |