Smithbuilt Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2013 to Mar 2022
- Last 24 months
- 0 permits filed
10 permits since 2000: 8 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 8, 2022 | Never finaled issued Mar 2022, no final | 2663 21st St | renovate one extg bathroom, repair waste line, replace fixtures in kind tile throughout. no change in layout of walls and openings.Details
renovate one extg bathroom, repair waste line, replace fixtures in kind tile throughout. no change in layout of walls and openings. | $6,000 |
| Jun 22, 2016 | Completed final sign-off Jul 2017 | 301 Divisadero St | sightglass coffee - erect new electrical projecting signDetails
sightglass coffee - erect new electrical projecting sign | $7,500 |
| May 10, 2016 | Completed final sign-off Jul 2017 | 301 Divisadero St | revision to ref pa 201609146819 to clarify 2 hr separation details between cafe & (e) residential above interior only. no exterior or changes to envelope.Details
revision to ref pa 201609146819 to clarify 2 hr separation details between cafe & (e) residential above interior only. no exterior or changes to envelope. | |
| Apr 25, 2016 | Completed final sign-off Jul 2017 | 301 Divisadero St | structural revisions to ref pa 2015 0914 6819: changes to (n) ceiling framing, (n) post & (n) beam @ rear wallDetails
structural revisions to ref pa 2015 0914 6819: changes to (n) ceiling framing, (n) post & (n) beam @ rear wall | |
| Sep 14, 2015 | Completed final sign-off Jul 2017 | 301 Divisadero St | ground floor: ti- coffee cafe. work includes (n) casework, fixtures, finishes, mep, (n) bathrooms, (n) ada lift. no exterior work. fire protection under sep permit. change of use approved under pa 2015 0501 5171Details
ground floor: ti- coffee cafe. work includes (n) casework, fixtures, finishes, mep, (n) bathrooms, (n) ada lift. no exterior work. fire protection under sep permit. change of use approved under pa 2015 0501 5171 | $200,000 |
| Jun 25, 2015 | Completed final sign-off Dec 2015 | 2663 21st St | rear facade alteration - to have new windows @ 1st flr & glass roll up door @ 2nd flr. interior remodel of (e) 2nd floor kitchen & bathroom w/new plumbing + electrical work.Details
rear facade alteration - to have new windows @ 1st flr & glass roll up door @ 2nd flr. interior remodel of (e) 2nd floor kitchen & bathroom w/new plumbing + electrical work. | $50,000 |
| May 8, 2015 | Never finaled issued May 2015, no final | 2663 21st St | remodel existing kitchen & bathroom @ 2nd floor to include replacement of cabinets, fixtures & finishes in kind.Details
remodel existing kitchen & bathroom @ 2nd floor to include replacement of cabinets, fixtures & finishes in kind. | $50,000 |
| May 1, 2015 | Completed final sign-off Jul 2017 | 301 Divisadero St | change of use on ground floor from retail to limited use (b) restaurant. scope does not include any modifications to the existing storefront.Details
change of use on ground floor from retail to limited use (b) restaurant. scope does not include any modifications to the existing storefront. | $5,000 |
| Jul 1, 2014 | Completed final sign-off Oct 2014 | 270 07th St | to comply w/complaint #201329531 - barrier removal: modify existing 42" high counter surface to include 60" wide min. length of 34" high counter per cbc 11b-226.3. n/a maher ordinanceDetails
to comply w/complaint #201329531 - barrier removal: modify existing 42" high counter surface to include 60" wide min. length of 34" high counter per cbc 11b-226.3. n/a maher ordinance | $1,200 |
| Aug 21, 2013 | Completed final sign-off Feb 2014 | 3012 20th St | install roof mounted exhaust fan unit & accompanying duct work. ref pa #2013.03.28.3289Details
install roof mounted exhaust fan unit & accompanying duct work. ref pa #2013.03.28.3289 | $5,000 |