Smi Demolition Company
- Based in
- El Cerrito
- On San Francisco permits
- Oct 2018 to May 2023
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 18, 2023 | Expired or cancelled suspend Jun 2023 | 765 Beach St | retai space: demoing partition non-structural walls. remove carpet throughout entire building. *note: building will be vacantDetails
retai space: demoing partition non-structural walls. remove carpet throughout entire building. *note: building will be vacant | $22,000 |
| Oct 25, 2018 | Expired or cancelled cancelled Jan 2026 | 301 Grove St | the existing concrete planter box will be cut down 2 feet, and over layed with stome veneer (19'x4') the wall in front of main wall will be overlayd with stone veneer.Details
the existing concrete planter box will be cut down 2 feet, and over layed with stome veneer (19'x4') the wall in front of main wall will be overlayd with stone veneer. | $9,000 |