Slipac General Contractor
- Based in
- Alameda
- On San Francisco permits
- Feb 2012 to Jan 2017
- Last 24 months
- 0 permits filed
6 permits since 2000: 4 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 20, 2017 | Completed final sign-off Jul 2018 | 700 Clement St | commercial ti per plan.proposed new commercial kitchen and service station. add two new unisex restrooms.Details
commercial ti per plan.proposed new commercial kitchen and service station. add two new unisex restrooms. | $20,000 |
| Sep 8, 2016 | Completed final sign-off Apr 2017 | 1100 Sutter St | demolition of tile, flooring, repair damaged wall, install new pergo flooring through outDetails
demolition of tile, flooring, repair damaged wall, install new pergo flooring through out | $8,000 |
| Oct 4, 2013 | Never finaled issued Oct 2013, no final | 1245 Lombard St | repair less than 50 percent of front stairs of building. includes replacement of 11 of 52 vertical memebers in front stairway railings and repair to banister on east and west sides, where banister meets postDetails
repair less than 50 percent of front stairs of building. includes replacement of 11 of 52 vertical memebers in front stairway railings and repair to banister on east and west sides, where banister meets post | $1,500 |
| Jan 28, 2013 | Completed final sign-off Apr 2013 | 4315 Lincoln Wy | revision to appl #2012.11.28.5043 - replacing (7) seven windows with new wood clad-fiberglass retrofit windows instead of 4 windows, visible from the street.Details
revision to appl #2012.11.28.5043 - replacing (7) seven windows with new wood clad-fiberglass retrofit windows instead of 4 windows, visible from the street. | |
| Nov 28, 2012 | Completed final sign-off Apr 2013 | 4315 Lincoln Wy | remodel 1 kitchen, 1 bathroom. update laundry and replace 13 windows and power wash deck and overcoat with gayco decking. replace water heater, 9 windows not visible from the street. 4 wood casement windows visible from street. u = 0.4 or betterDetails
remodel 1 kitchen, 1 bathroom. update laundry and replace 13 windows and power wash deck and overcoat with gayco decking. replace water heater, 9 windows not visible from the street. 4 wood casement windows visible from street. u = 0.4 or better | $25,000 |
| Feb 15, 2012 | Never finaled issued Feb 2012, no final | 1776 Sacramento St | install new harwood flooring, baseboards, crown moulding, new kitchen countertops, sink, faucet, new vanity tops in both bathrs with faucet and paint hall unit. replace only countertops and sink in bath and kitchen.Details
install new harwood flooring, baseboards, crown moulding, new kitchen countertops, sink, faucet, new vanity tops in both bathrs with faucet and paint hall unit. replace only countertops and sink in bath and kitchen. | $35,000 |