Sky Trust Builder
- Based in
- Hercules
- On San Francisco permits
- Dec 2019 to Apr 2026
- Last 24 months
- 4 permits filed
18 permits since 2000: 10 completed, 7 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 15, 2026 | In progress issued May 2026 | 223 Richland Av | to obtain final inspection for work approved under pa# 202406043614 and #202502079965 all work is complete.Details
to obtain final inspection for work approved under pa# 202406043614 and #202502079965 all work is complete. | |
| Apr 14, 2025 | In progress issued Jun 2025 | 154 Pixley St | interior remodel for unit #1 on 1st floor: remodel kitchen, add a interior stair connect to new living space in basement. on basement floor: add a study room, a media room, a family room, and a bathroom.Details
interior remodel for unit #1 on 1st floor: remodel kitchen, add a interior stair connect to new living space in basement. on basement floor: add a study room, a media room, a family room, and a bathroom. | $85,000 |
| Feb 7, 2025 | In progress issued Mar 2025 | 223 Richland Av | revision to pa #202401123864. interior structural improvements at existing roof framing. no work at building exteriors.Details
revision to pa #202401123864. interior structural improvements at existing roof framing. no work at building exteriors. | $15,000 |
| Oct 29, 2024 | Completed final sign-off Aug 2026 | 304 Gold Mine Dr | new cantilevered upper deck to replace (e) upper deck replace door that connects to upper deck. (n) windows in (e) location on front facade. (n) hardie plank siding on front, rear & side facades of resdience. (n) exterior stairs from (e) lower deck to rear yard (n) quardril and (e) lower deck.Details
new cantilevered upper deck to replace (e) upper deck replace door that connects to upper deck. (n) windows in (e) location on front facade. (n) hardie plank siding on front, rear & side facades of resdience. (n) exterior stairs from (e) lower deck to rear yard (n) quardril and (e) lower deck. | $35,000 |
| Jul 5, 2024 | In progress issued Jul 2024 | 336 Gold Mine Dr | 1st fl remodel: add 1 full bath & kitchenette w/2 burner stove no oven in existing family rm. removal of non-structural wall.Details
1st fl remodel: add 1 full bath & kitchenette w/2 burner stove no oven in existing family rm. removal of non-structural wall. | $67,000 |
| Jun 4, 2024 | In progress issued Mar 2025 | 223 Richland Av | street facing window replacement and side yard stair improvement.Details
street facing window replacement and side yard stair improvement. | $25,000 |
| Jan 12, 2024 | In progress issued Jul 2024 | 223 Richland Av | structural improvements, new interior stair, interior alterationsDetails
structural improvements, new interior stair, interior alterations | $70,000 |
| Jan 12, 2024 | In progress issued May 2026 | 223 Richland Av | window replacement in kind, approx 15. visible from streetDetails
window replacement in kind, approx 15. visible from street | $30,000 |
| Feb 16, 2023 | Completed final sign-off Apr 2023 | 2975 26th Av | one bathroom renovation in-kind. non structuralDetails
one bathroom renovation in-kind. non structural | $15,000 |
| Jul 28, 2021 | Completed final sign-off Mar 2023 | 334 22nd Av | renovate e kitchen and dining room, new stairs to garage/basement, renovate e bath, new skylight, modify 1 window not visible from street, new on demand hot water heaterDetails
renovate e kitchen and dining room, new stairs to garage/basement, renovate e bath, new skylight, modify 1 window not visible from street, new on demand hot water heater | $50,000 |
| Jul 6, 2021 | Completed final sign-off Mar 2022 | 304 Gold Mine Dr | first floor interior remodel: add new bathroom and wet bar within existing building footprint. no new square footage. no exterior changes, no change to building envelope.Details
first floor interior remodel: add new bathroom and wet bar within existing building footprint. no new square footage. no exterior changes, no change to building envelope. | $25,000 |
| May 18, 2021 | Completed final sign-off Oct 2021 | 154 Pixley St | remodel 1 bath. demo (e) sheetrock, tub, vanity & tiles. install water proofing, new vanity & tiles. replace 1 rear window, not street visible. no structural work.Details
remodel 1 bath. demo (e) sheetrock, tub, vanity & tiles. install water proofing, new vanity & tiles. replace 1 rear window, not street visible. no structural work. | $12,000 |
| Apr 1, 2021 | Completed final sign-off Oct 2021 | 2135 Vallejo St | remodel kitchen, guest bathroom & master bathroom. install new hardwood flooring. all work in-kind, no layout changes, no walls modified.Details
remodel kitchen, guest bathroom & master bathroom. install new hardwood flooring. all work in-kind, no layout changes, no walls modified. | $60,000 |
| Mar 31, 2021 | Expired or cancelled withdrawn Jan 2023 | 2135 Vallejo St | master bathroom remodel, guest bathroom remodel, kitchen remodel. new drywall installation, new hardwood flooring. install 4 pocket doors. close kitchen's door. no structural work.Details
master bathroom remodel, guest bathroom remodel, kitchen remodel. new drywall installation, new hardwood flooring. install 4 pocket doors. close kitchen's door. no structural work. | $60,000 |
| Oct 15, 2020 | Completed final sign-off Feb 2021 | 235 Berry St | unit 107: remove existing tiles inside bathroom 1 and master bathroom. install new tiles at bathroom 1 floor & shower surroundings. install new tiles at master bathroom floor and at shower surroundings. master bathroom and guest bathroom only.Details
unit 107: remove existing tiles inside bathroom 1 and master bathroom. install new tiles at bathroom 1 floor & shower surroundings. install new tiles at master bathroom floor and at shower surroundings. master bathroom and guest bathroom only. | $4,500 |
| Sep 29, 2020 | Completed final sign-off Dec 2020 | 2224 15th St | simple cosmetic remodel of extg split bath. no changes to walls or fixture locationsDetails
simple cosmetic remodel of extg split bath. no changes to walls or fixture locations | $14,500 |
| Jul 1, 2020 | Completed final sign-off Dec 2020 | 2224 15th St | interior remodel of kitchen, entry, laundry room, add a powder room & associated structural work. 1 window is reduced in sizeDetails
interior remodel of kitchen, entry, laundry room, add a powder room & associated structural work. 1 window is reduced in size | $76,000 |
| Dec 5, 2019 | Completed final sign-off Jul 2022 | 215 Henry St | revision to pa# 2017-0807-4002: reduce size of additionDetails
revision to pa# 2017-0807-4002: reduce size of addition |