Simon W K Wu Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to May 2022
- Last 24 months
- 0 permits filed
55 permits since 2000: 51 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 9, 2022 | Completed final sign-off Aug 2022 | 62 Taraval St | bathroom remodeling. replace bathtub, faucet showers and faucet. tiles sink toilet light and install ceiling fan. no structural work- no framing modification.Details
bathroom remodeling. replace bathtub, faucet showers and faucet. tiles sink toilet light and install ceiling fan. no structural work- no framing modification. | $35,000 |
| Jul 6, 2021 | Completed final sign-off Aug 2021 | 4138 Balboa St | bathroom remodel. replace bathtube faucet, wall surround new tiles. replace ceiling fan, vanity set, medicine cabinet, new electrical plug.Details
bathroom remodel. replace bathtube faucet, wall surround new tiles. replace ceiling fan, vanity set, medicine cabinet, new electrical plug. | $10,750 |
| Oct 19, 2020 | Completed final sign-off Mar 2021 | 1323 Leavenworth St | kitchen remoedling. new cabinets, countertop, sink, faucet, new stove, hood, new flooring & painting.Details
kitchen remoedling. new cabinets, countertop, sink, faucet, new stove, hood, new flooring & painting. | $16,000 |
| Mar 15, 2019 | Completed final sign-off Jun 2019 | 663 42nd Av | kitchen, replace cabinets, sink, faucet, stove, new countertop, range hood; new ceiling lightDetails
kitchen, replace cabinets, sink, faucet, stove, new countertop, range hood; new ceiling light | $20,000 |
| Jan 8, 2018 | Completed final sign-off Feb 2018 | 330 11th Av | #4: bathroom remodeling, replace bathtub, faucet, vanity sit, toilet.Details
#4: bathroom remodeling, replace bathtub, faucet, vanity sit, toilet. | $8,000 |
| Mar 9, 2017 | Completed final sign-off Apr 2017 | 259 Dellbrook Av | remodeling one bathroom. remove bath tub, install new shower, replace faucet, vanity, toilet, tiles, light, new fan. non structural.Details
remodeling one bathroom. remove bath tub, install new shower, replace faucet, vanity, toilet, tiles, light, new fan. non structural. | $15,000 |
| Dec 23, 2016 | Completed final sign-off Feb 2017 | 1379 41st Av | bathroom remodeling replace shower , faucet, tile , sink , toilet lights & install new fan.Details
bathroom remodeling replace shower , faucet, tile , sink , toilet lights & install new fan. | $13,000 |
| Jun 28, 2016 | Completed final sign-off Oct 2016 | 855 45th Av | 855: kitchen replace cabinet, sink, faucet, stove, new countertop. garage: rise up water heater. new washer & dryer in garage. no walls removed or added.Details
855: kitchen replace cabinet, sink, faucet, stove, new countertop. garage: rise up water heater. new washer & dryer in garage. no walls removed or added. | $38,000 |
| Feb 19, 2016 | Completed final sign-off Nov 2018 | 4023 Pacheco St | legalize (e) dwelling unit installed w/o permit, (e) dwelling unit w/ kitchen on ground fl. per ord #43-14.Details
legalize (e) dwelling unit installed w/o permit, (e) dwelling unit w/ kitchen on ground fl. per ord #43-14. | $11,800 |
| May 29, 2015 | Completed final sign-off Sep 2015 | 106 Point Lobos Av | one partial kitchen and two bathroom remodeling. all high efficacy one main high efficacy light. no cabinet change.Details
one partial kitchen and two bathroom remodeling. all high efficacy one main high efficacy light. no cabinet change. | $28,000 |
| Feb 20, 2015 | Completed final sign-off May 2015 | 857 45th Av | remodeling kitchen. replace cabinets, appliances, sink, countertop, bathrooms: replace bthtub, faucet, vanity set, toilet, tile and wallboard. new drywall all room. no walls to be removed or altered.Details
remodeling kitchen. replace cabinets, appliances, sink, countertop, bathrooms: replace bthtub, faucet, vanity set, toilet, tile and wallboard. new drywall all room. no walls to be removed or altered. | $51,000 |
| Feb 20, 2015 | Completed final sign-off Mar 2015 | 684 Panorama Dr | 1 bathroom remodeling: replace bathtub, faucet, vanity, toilet, light wall and floor tile. no walls to be altered or removedDetails
1 bathroom remodeling: replace bathtub, faucet, vanity, toilet, light wall and floor tile. no walls to be altered or removed | $11,000 |
| Dec 2, 2014 | Never finaled issued Dec 2014, no final | 2780 19th Av | kitchen replace countertops, sink faucet, master bathroom replace vanity top, sink, faucet and alter den door - no remodelingDetails
kitchen replace countertops, sink faucet, master bathroom replace vanity top, sink, faucet and alter den door - no remodeling | $12,000 |
| Aug 4, 2014 | Completed final sign-off Aug 2014 | 907 Clayton St | repair front stairs landing damaged wood, less than 50% repair in kindDetails
repair front stairs landing damaged wood, less than 50% repair in kind | $2,200 |
| Feb 3, 2014 | Completed final sign-off Mar 2014 | 70 Taraval St | bathroom remodeling, replace toilet, sink, faucet shower room, tiles, no structural workDetails
bathroom remodeling, replace toilet, sink, faucet shower room, tiles, no structural work | $9,000 |
| Aug 19, 2013 | Completed final sign-off Sep 2013 | 4433 17th St | remodel kitchen, replace cabinets, appliances, and countertop ~100 sq. ft.; bathroom - replace toilet and vanity with faucet only.Details
remodel kitchen, replace cabinets, appliances, and countertop ~100 sq. ft.; bathroom - replace toilet and vanity with faucet only. | $12,000 |
| Sep 13, 2011 | Completed final sign-off Oct 2011 | 125 Vale Av | remodel kitchen: replace kitchen wall & base cabinets, sink, faucet, dishwasher garbage disposal, stove & hood, replace water heater, min. 50% min wattage lighting high efficacy. replace hallway bathroom vanity set, lights high efficacyDetails
remodel kitchen: replace kitchen wall & base cabinets, sink, faucet, dishwasher garbage disposal, stove & hood, replace water heater, min. 50% min wattage lighting high efficacy. replace hallway bathroom vanity set, lights high efficacy | $17,700 |
| Apr 18, 2011 | Completed final sign-off Jun 2011 | 104 Point Lobos Av | job location: 104 point lobos ave. remodeling one kitchen: replace kitchen cabinet, sink faucet, dishwasher, garbage disposal and stove.Details
job location: 104 point lobos ave. remodeling one kitchen: replace kitchen cabinet, sink faucet, dishwasher, garbage disposal and stove. | $11,500 |
| Mar 11, 2011 | Completed final sign-off Apr 2011 | 106 Point Lobos Av | work on #106 only- remodeling kitchen & replace kitchen cabinet, sink, dishwasher, garbage disposal and stove.Details
work on #106 only- remodeling kitchen & replace kitchen cabinet, sink, dishwasher, garbage disposal and stove. | $11,500 |
| Oct 8, 2010 | Completed final sign-off Nov 2010 | 2780 42nd Av | remodeling kitchen: replace kitchen cabinets, appliance, sink with faucet, counter top and lightsDetails
remodeling kitchen: replace kitchen cabinets, appliance, sink with faucet, counter top and lights | $6,310 |
| Oct 1, 2010 | Completed final sign-off Nov 2010 | 425 Vicksburg St | one kitchen, replace cabinets all appliances, sink, faucets, counter top and new ceiling lights. one bathroom, replace bathtub, faucet, toilet, vanity with top. light, fan, and tiles. lighting to comply with cec 150 (k)Details
one kitchen, replace cabinets all appliances, sink, faucets, counter top and new ceiling lights. one bathroom, replace bathtub, faucet, toilet, vanity with top. light, fan, and tiles. lighting to comply with cec 150 (k) | $17,000 |
| Jun 15, 2010 | Expired or cancelled expired Sep 2012 | 332 Day St | kitchen remodeling: replace cabinets, stove, countertops, re-tile floor & wall. bathroom rermodeling: replace toilet, sink, bathtub, re-tile floor & wall. no structural work and no new lightingDetails
kitchen remodeling: replace cabinets, stove, countertops, re-tile floor & wall. bathroom rermodeling: replace toilet, sink, bathtub, re-tile floor & wall. no structural work and no new lighting | $5,000 |
| Jun 8, 2010 | Completed final sign-off Jul 2010 | 2346 20th Av | add new full bath to second floor.Details
add new full bath to second floor. | $8,000 |
| Aug 17, 2009 | Completed final sign-off Jan 2010 | 3064 Sacramento St | kitchen remodeling. replace cabinet sink & appliance, counter & tile. bathroom replace bathtub, faucet, toilet, sink & tile.Details
kitchen remodeling. replace cabinet sink & appliance, counter & tile. bathroom replace bathtub, faucet, toilet, sink & tile. | $33,000 |
| May 14, 2009 | Completed final sign-off Jul 2009 | 70 Taraval St | remove existing wall between kitchen and dining room.Details
remove existing wall between kitchen and dining room. | $7,000 |
| Mar 16, 2009 | Completed final sign-off Jul 2009 | 70 Taraval St | kitchen remodeling. replace cabinet, countertop, stove, diswasher, gabage disposal, sink & faucet. master bedroom, bathroom remodeling: replace vanity, toilet, shower & faucet. no structural work.Details
kitchen remodeling. replace cabinet, countertop, stove, diswasher, gabage disposal, sink & faucet. master bedroom, bathroom remodeling: replace vanity, toilet, shower & faucet. no structural work. | $28,000 |
| Apr 15, 2008 | Completed final sign-off Jun 2008 | 107 Ulloa St | kitchen replace cabinets, sink, faucet, countertop, stove, hood. dishwasher, disposal,lighting install recess light and under wall cabinet install light. replace kitchen window u-factor <0.67.Details
kitchen replace cabinets, sink, faucet, countertop, stove, hood. dishwasher, disposal,lighting install recess light and under wall cabinet install light. replace kitchen window u-factor <0.67. | $14,800 |
| Jun 15, 2007 | Completed final sign-off Oct 2007 | 344 San Leandro Wy | kitchen replace cabinets, sink, faucet, countertop. re-install stove, hood & dishwasher, ceiling, install new recesses light & under wall cabinet install light. bathroom, new sink, faucet toilet.Details
kitchen replace cabinets, sink, faucet, countertop. re-install stove, hood & dishwasher, ceiling, install new recesses light & under wall cabinet install light. bathroom, new sink, faucet toilet. | $20,000 |
| May 4, 2007 | Completed final sign-off Jun 2007 | 76 Hernandez Av | repair house front left side near garage door water damage wood & house right side near chimney wall damage wood & stucco.Details
repair house front left side near garage door water damage wood & house right side near chimney wall damage wood & stucco. | $3,500 |
| Jan 26, 2007 | Completed final sign-off Feb 2007 | 932 Broderick St | work in unit#2. replace bathroom (master) double sink and vanity.Details
work in unit#2. replace bathroom (master) double sink and vanity. | $2,700 |
| Nov 28, 2006 | Completed final sign-off May 2007 | 76 Hernandez Av | repair house left side and rear bay window water damage wood, add vent and re-stucco 50 sqft max.Details
repair house left side and rear bay window water damage wood, add vent and re-stucco 50 sqft max. | $10,000 |
| Sep 27, 2006 | Completed final sign-off Dec 2006 | 145 Jersey St | kitchen replace new cbinets, stove , sink, faucet, dishwasher, garbage disposor, new lights and install new washer & dryer will comply w/title 24 lighting requirements. bathroom replace bathtub, sink, toilet, new lighting fan and new tile and faucet.Details
kitchen replace new cbinets, stove , sink, faucet, dishwasher, garbage disposor, new lights and install new washer & dryer will comply w/title 24 lighting requirements. bathroom replace bathtub, sink, toilet, new lighting fan and new tile and faucet. | $30,000 |
| Aug 28, 2006 | Completed final sign-off Dec 2006 | 145 Jersey St | remove one wall between kchn and dining room in both unitDetails
remove one wall between kchn and dining room in both unit | $1,000 |
| Jul 19, 2006 | Completed final sign-off Dec 2006 | 145 Jersey St | unit # 147 only- replace kitchen cabinets, sink, dishwasher, garage disposer. hood stove & lights. nathroom replace bath tub, faucet, sink toilet, window, fan & tiles.Details
unit # 147 only- replace kitchen cabinets, sink, dishwasher, garage disposer. hood stove & lights. nathroom replace bath tub, faucet, sink toilet, window, fan & tiles. | $21,500 |
| May 4, 2006 | Completed final sign-off Jul 2006 | 427 Vicksburg St | kitchen replace cabinets, sink, dishwasher, gabage disposer, hood, stove and counter top. bathroom replace bathtub, faucet sink, toilet, window, fan and wall tiles. porch install washer and gas dryer unit #427 only upstairs.Details
kitchen replace cabinets, sink, dishwasher, gabage disposer, hood, stove and counter top. bathroom replace bathtub, faucet sink, toilet, window, fan and wall tiles. porch install washer and gas dryer unit #427 only upstairs. | $30,000 |
| Jan 27, 2006 | Completed final sign-off Mar 2006 | 175 Sweeny St | replace kitchen cabinets, sink, stove, hood, dishwasher, countertop etc. work on 2nd floorDetails
replace kitchen cabinets, sink, stove, hood, dishwasher, countertop etc. work on 2nd floor | $12,000 |
| Jan 11, 2006 | Never finaled issued Jan 2006, no final | 175 Sweeny St | install living room, dining room & hallway ceiling @ 2/f only. sheetrock. no structural work.Details
install living room, dining room & hallway ceiling @ 2/f only. sheetrock. no structural work. | $1,600 |
| Nov 7, 2005 | Completed final sign-off Jan 2006 | 175 Sweeny St | 1 bath remodel, replace bathtub, faucet, vanity, sink with baucet, new tileDetails
1 bath remodel, replace bathtub, faucet, vanity, sink with baucet, new tile | $4,900 |
| Jul 14, 2005 | Completed final sign-off Sep 2005 | 1693 Funston Av | general building repairs & plumbing repair. (physical inspection - 3r-4170).Details
general building repairs & plumbing repair. (physical inspection - 3r-4170). | $3,780 |
| May 18, 2005 | Completed final sign-off Jun 2005 | 2023 32nd Av | repair front garage side stucco & water damage woodDetails
repair front garage side stucco & water damage wood | $5,000 |
| Mar 4, 2005 | Completed final sign-off May 2005 | 758 Cayuga Av | rmodeling kchn/replace cabinets/stove hood dishwasher counter top etc.Details
rmodeling kchn/replace cabinets/stove hood dishwasher counter top etc. | $15,000 |
| Feb 17, 2004 | Completed final sign-off Apr 2004 | 700 Hayes St | kitchen replace sink faucet, alter kitchen cabinets & countertopDetails
kitchen replace sink faucet, alter kitchen cabinets & countertop | $5,000 |
| Nov 3, 2003 | Completed final sign-off Jan 2004 | 264 Day St | bathroom remodeling in 2nd flr. replace shower pan. washbasin,toilet & tile etc.Details
bathroom remodeling in 2nd flr. replace shower pan. washbasin,toilet & tile etc. | $8,000 |
| Aug 29, 2003 | Completed final sign-off Nov 2003 | 51 Farnum St | bathroom remodeling. no structural work.Details
bathroom remodeling. no structural work. | $10,000 |
| Apr 14, 2003 | Completed final sign-off Oct 2003 | 254 Day St | demo 1st fl 1/2 bah.&remove 2nd fl bath to be install new plumbing/fixtures,lighting,electrical,Details
demo 1st fl 1/2 bah.&remove 2nd fl bath to be install new plumbing/fixtures,lighting,electrical, | $17,800 |
| Sep 24, 2002 | Completed final sign-off Feb 2003 | 507 Rhode Island St | remodel kchn laundry/replace all cbnts/countertop/sink/stove/dishwasher/hoodDetails
remodel kchn laundry/replace all cbnts/countertop/sink/stove/dishwasher/hood | $11,300 |
| Jul 22, 2002 | Completed final sign-off Sep 2002 | 1534 19th Av | repair house front dry rot, 50 s.f. 5 by 8, stucco repairDetails
repair house front dry rot, 50 s.f. 5 by 8, stucco repair | $2,500 |
| Mar 19, 2002 | Completed final sign-off Mar 2002 | 541 Vallejo St | renew for final inspection-200103053456-200101148357Details
renew for final inspection-200103053456-200101148357 | |
| Feb 7, 2002 | Completed final sign-off Jun 2002 | 478 25th Av | comply with nov 200118278. remove 1 kitchen on the 3rd floor. remove illegal unit on 3rd floor.Details
comply with nov 200118278. remove 1 kitchen on the 3rd floor. remove illegal unit on 3rd floor. | $1,000 |
| Sep 14, 2001 | Expired or cancelled expired Jan 2002 | 541 Vallejo St | rev. appl#200103053456 add new wall between laundry area & crawl spaceDetails
rev. appl#200103053456 add new wall between laundry area & crawl space | $1,000 |
| Aug 31, 2001 | Completed final sign-off Nov 2001 | 1093 Dolores St | repair back stairwayDetails
repair back stairway | $300 |
| Mar 6, 2001 | Completed final sign-off Sep 2001 | 248 Day St | bathroom,replace bathtub faucet,washbasin, toilet,tile. kitch replc cabnts,sink,cnttop,elec outletDetails
bathroom,replace bathtub faucet,washbasin, toilet,tile. kitch replc cabnts,sink,cnttop,elec outlet | $15,000 |
| Oct 24, 2000 | Completed final sign-off Jan 2001 | 1863 31st Av | kitchen and bathroom remodelingDetails
kitchen and bathroom remodeling | $13,000 |
| Sep 27, 2000 | Completed final sign-off May 2001 | 47 Manzanita Av | replace kitchen cabinets,countertop,sink,elec panel,outlets,install lightsDetails
replace kitchen cabinets,countertop,sink,elec panel,outlets,install lights | $20,000 |
| May 30, 2000 | Completed final sign-off Aug 2000 | 2819 Baker St | remodel kitchen and bathroomDetails
remodel kitchen and bathroom | $9,000 |