Simmitri Inc
- Based in
- Morgan Hill
- On San Francisco permits
- May 2012 to Jul 2025
- Last 24 months
- 2 permits filed
6 permits since 2000: 5 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2025 | Completed final sign-off Jul 2025 | 150 De Soto St | reroof no torch downDetails
reroof no torch down | $12,000 |
| Oct 23, 2024 | Completed final sign-off Jan 2025 | 1556 35th Av | re-roofing power wash entire roof for proper adhesion surface sunig ge enduris liquid flashing, ge sws sealant, ge rfloo reinforcing fabric, repair possible leak paints. install bleed blucker silicone coating over entire roof and walls locations at 2 gallons per 100sqftDetails
re-roofing power wash entire roof for proper adhesion surface sunig ge enduris liquid flashing, ge sws sealant, ge rfloo reinforcing fabric, repair possible leak paints. install bleed blucker silicone coating over entire roof and walls locations at 2 gallons per 100sqft | $13,997 |
| Nov 1, 2022 | Completed final sign-off Dec 2022 | 120 Brunswick St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $5,993 |
| Apr 8, 2013 | Completed final sign-off May 2013 | 2227 Yorba St | reroofing.Details
reroofing. | $12,000 |
| May 1, 2012 | Never finaled issued May 2012, no final | 1472 York St | roof replacing plywood to 1/2" cdx ply 8" penny nail galvanized, 8" edge, 12" field.Details
roof replacing plywood to 1/2" cdx ply 8" penny nail galvanized, 8" edge, 12" field. | $1,350 |
| May 1, 2012 | Completed final sign-off May 2012 | 1472 York St | reroofingDetails
reroofing | $14,072 |