Shun Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2004 to Dec 2017
- Last 24 months
- 0 permits filed
79 permits since 2000: 67 completed, 11 never finaled, 1 expired or cancelled.
Of the 11 never-finaled permits, 2 are 5 to 10 years old, 9 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 7, 2017 | Never finaled issued Dec 2017, no final | 2375 39th Av | remove/replace kithcen cabinets, tile, countertop, (3) cabinets/countertops onlyDetails
remove/replace kithcen cabinets, tile, countertop, (3) cabinets/countertops only | $5,000 |
| Feb 2, 2017 | Never finaled issued Sep 2017, no final | 575 04th St | new ti for retail space. new small office, storage, retail, break room, ada restroom, cir, total useable area 4430 sq ft maher not reqDetails
new ti for retail space. new small office, storage, retail, break room, ada restroom, cir, total useable area 4430 sq ft maher not req | $80,000 |
| Jan 13, 2015 | Never finaled issued Jan 2015, no final | 115 Maywood Dr | repair/replace garden wall in rear yard per planDetails
repair/replace garden wall in rear yard per plan | $10,000 |
| Oct 7, 2014 | Completed final sign-off Feb 2016 | 1663 44th Av | per plan.add 2 bedrooms, 2 storages, 2 baths, laundry, utility, mud room on 1st fl per plan, infill under sundroom add 2 bedroos, 2 storage, 2 baths on 2nd fl. relocate 2 bedroos and add 7 skylights on 2nd fl. e kitchen and e bath remodel on 2nd flDetails
per plan.add 2 bedrooms, 2 storages, 2 baths, laundry, utility, mud room on 1st fl per plan, infill under sundroom add 2 bedroos, 2 storage, 2 baths on 2nd fl. relocate 2 bedroos and add 7 skylights on 2nd fl. e kitchen and e bath remodel on 2nd fl | $90,000 |
| Aug 18, 2014 | Never finaled issued May 2015, no final | 645 Faxon Av | legalize in law unit per ordinance 43-14 on 1st floor per plan. legalize kitchen on 1st floor per plan.Details
legalize in law unit per ordinance 43-14 on 1st floor per plan. legalize kitchen on 1st floor per plan. | $35,000 |
| Jul 9, 2014 | Never finaled issued Nov 2014, no final | 115 Maywood Dr | remove existing master bedroom and closet and convert into new master bedroom walk in closet. remodel e master and new bath. kitchen remodel. infill 2 window openings in kitchen and breakfast nook, create new window opening.replace e heater/ductwork,new force air central heat, insulated ductwork.Details
remove existing master bedroom and closet and convert into new master bedroom walk in closet. remodel e master and new bath. kitchen remodel. infill 2 window openings in kitchen and breakfast nook, create new window opening.replace e heater/ductwork,new force air central heat, insulated ductwork. | $50,000 |
| Jul 9, 2014 | Completed final sign-off Feb 2015 | 115 Maywood Dr | replace front windows only - wood winodws - new garage doors within the existing openings. replacement in like-kind.Details
replace front windows only - wood winodws - new garage doors within the existing openings. replacement in like-kind. | $5,000 |
| May 19, 2014 | Completed final sign-off Jan 2015 | 2327 25th Av | 1)repair stucco at front less than 50%. 2)repair front stair less than 50% . structural work, cosmetic work only.Details
1)repair stucco at front less than 50%. 2)repair front stair less than 50% . structural work, cosmetic work only. | $5,000 |
| Jan 9, 2013 | Never finaled issued Jan 2013, no final | 2930 Clay St | windows and skylights replacement in kind (7 windows & 3 skylights), not visible from street. reinforce deflected beam at kitchen ceiling.Details
windows and skylights replacement in kind (7 windows & 3 skylights), not visible from street. reinforce deflected beam at kitchen ceiling. | $8,000 |
| Jan 4, 2013 | Never finaled issued Jan 2013, no final | 290 Collingwood St | remove allinterior doors,trims, moldings & wall panels, remove all plumbing fixtures & kitchen appliances for future renovation which under separate permit, soft demo only, no structural workDetails
remove allinterior doors,trims, moldings & wall panels, remove all plumbing fixtures & kitchen appliances for future renovation which under separate permit, soft demo only, no structural work | $2,000 |
| Dec 27, 2012 | Completed final sign-off May 2013 | 771 34th Av | interior remodel: 1st floor: add a family room, a bedroom, a guestroom, two baths. 2nd floor: add a bath, remodel kitchen.Details
interior remodel: 1st floor: add a family room, a bedroom, a guestroom, two baths. 2nd floor: add a bath, remodel kitchen. | $58,000 |
| Nov 1, 2012 | Never finaled issued Nov 2012, no final | 2930 Clay St | kitchen and 2 bathroom remodel.Details
kitchen and 2 bathroom remodel. | $28,000 |
| Oct 11, 2012 | Completed final sign-off May 2013 | 566 Elizabeth St | replace dryrotted main stair in kind approx 160 sq. ft.Details
replace dryrotted main stair in kind approx 160 sq. ft. | $8,000 |
| Sep 20, 2012 | Completed final sign-off Dec 2012 | 1243 Clayton St | to comply with inspection report cc-7151: upgrade existing guardrail with 4" max spacing railing, install handrail at stairway of rear deck (one side only).Details
to comply with inspection report cc-7151: upgrade existing guardrail with 4" max spacing railing, install handrail at stairway of rear deck (one side only). | $1,600 |
| Sep 20, 2012 | Completed final sign-off Nov 2012 | 765 Arguello Bl | add 1 bathroom, laundry room, remodel existing bathroom at 4th floor unit 8 per planDetails
add 1 bathroom, laundry room, remodel existing bathroom at 4th floor unit 8 per plan | $20,000 |
| Sep 13, 2012 | Completed final sign-off Nov 2012 | 2327 25th Av | add 6'x15' wood deck on 2nd floor at rear per plan.Details
add 6'x15' wood deck on 2nd floor at rear per plan. | $8,000 |
| Aug 24, 2012 | Completed final sign-off Nov 2012 | 2327 25th Av | add 2 bathrooms, 1 play room, 1 study room, 1 storage and 1 bedroom on the 1st fllor per planDetails
add 2 bathrooms, 1 play room, 1 study room, 1 storage and 1 bedroom on the 1st fllor per plan | $30,000 |
| Aug 3, 2012 | Completed final sign-off Nov 2012 | 2327 25th Av | convert sunroom to master bedroom & walk in closet on 2nd floor. kitchen & bathroom remodel on 2nd floor. convert dining room to new bedroom on 2nd floor.Details
convert sunroom to master bedroom & walk in closet on 2nd floor. kitchen & bathroom remodel on 2nd floor. convert dining room to new bedroom on 2nd floor. | $35,000 |
| Jul 18, 2012 | Completed final sign-off May 2013 | 566 Elizabeth St | revison to pa# 2012-0224-4859-structural work only (retaining wall)Details
revison to pa# 2012-0224-4859-structural work only (retaining wall) | |
| Jul 18, 2012 | Completed final sign-off May 2013 | 566 Elizabeth St | revison to pa# 2011-0124-8854-structural work onlyDetails
revison to pa# 2011-0124-8854-structural work only | |
| Jul 6, 2012 | Never finaled issued Jul 2012, no final | 226 Cabrillo St | revision to app#200912188527 s1,r-1(structural work only)Details
revision to app#200912188527 s1,r-1(structural work only) | |
| May 31, 2012 | Completed final sign-off Jun 2012 | 217 Virginia Av | install anchor bolts around perimeter of house.Details
install anchor bolts around perimeter of house. | $8,000 |
| May 4, 2012 | Completed final sign-off Oct 2012 | 1243 Clayton St | remodel 2 kitchens-repl cabinets, countertops, flring, move stove location & add gas line. move door opening in dining & expand opening to hallwy. remodel 2 bathrooms-remove sinks & add double sinks in powder rm, move toilet to current shower location & shower to toilet location. remodel 2 guest batDetails
remodel 2 kitchens-repl cabinets, countertops, flring, move stove location & add gas line. move door opening in dining & expand opening to hallwy. remodel 2 bathrooms-remove sinks & add double sinks in powder rm, move toilet to current shower location & shower to toilet location. remodel 2 guest bat | $40,000 |
| Apr 2, 2012 | Completed final sign-off May 2013 | 566 Elizabeth St | provide soldier beams to retain soil front excavation for proposed garage to comply with complaint #201292336Details
provide soldier beams to retain soil front excavation for proposed garage to comply with complaint #201292336 | $10,000 |
| Feb 24, 2012 | Completed final sign-off May 2013 | 566 Elizabeth St | provide temporary shoring and comply with complaint #201292336Details
provide temporary shoring and comply with complaint #201292336 | $5,000 |
| Feb 24, 2012 | Completed final sign-off May 2013 | 566 Elizabeth St | revesion to bpa# 201111179090; bpa# 201111179093 and comply with complaint # 201292336. structural only.Details
revesion to bpa# 201111179090; bpa# 201111179093 and comply with complaint # 201292336. structural only. | |
| Feb 7, 2012 | Completed final sign-off Mar 2012 | 1320 Sloat Bl | convert (e) bathroom into 2 bathrooms on upper floor per planDetails
convert (e) bathroom into 2 bathrooms on upper floor per plan | $12,000 |
| Nov 17, 2011 | Completed final sign-off May 2013 | 566 Elizabeth St | bathroom and kitchen remodel per plan. repair deflected beam above living room on 1st fl per plan. repair garden wall and concrete stair and foundation per planDetails
bathroom and kitchen remodel per plan. repair deflected beam above living room on 1st fl per plan. repair garden wall and concrete stair and foundation per plan | $40,000 |
| Nov 17, 2011 | Completed final sign-off May 2013 | 568 Elizabeth St | add new master bedroom and master bath on 3rd fl per plan. add new skylight per plan. kitchen and bath remodel per planDetails
add new master bedroom and master bath on 3rd fl per plan. add new skylight per plan. kitchen and bath remodel per plan | $40,000 |
| Nov 17, 2011 | Completed final sign-off May 2013 | 566 Elizabeth St | replace window in kind, same size and same location, with wood window, total 8 windows, u factor more or less .4Details
replace window in kind, same size and same location, with wood window, total 8 windows, u factor more or less .4 | $6,000 |
| Oct 19, 2011 | Completed final sign-off Feb 2012 | 1343 32nd Av | add 1-bathroom, storage room & media room on ground floor. add one bathroom on 2nd. floor. this permit will clear nov#20067481,200731680 penalties paid on pa#200802084386.Details
add 1-bathroom, storage room & media room on ground floor. add one bathroom on 2nd. floor. this permit will clear nov#20067481,200731680 penalties paid on pa#200802084386. | $55,000 |
| Oct 17, 2011 | Completed final sign-off Nov 2011 | 1433 17th Av | repair dry rotted stairs at back. less than 50%.Details
repair dry rotted stairs at back. less than 50%. | $2,000 |
| Oct 11, 2011 | Completed final sign-off Feb 2012 | 248 10th Av | add one media room, one bathroom and bedroom on ground floor per plan. kitchen and bathroom remodel on 2nd floor per plan. add wood deck and stair at rear per plan. repair stucco at side of building per plan. repair dry rot at front stair.Details
add one media room, one bathroom and bedroom on ground floor per plan. kitchen and bathroom remodel on 2nd floor per plan. add wood deck and stair at rear per plan. repair stucco at side of building per plan. repair dry rot at front stair. | $60,000 |
| Oct 6, 2011 | Completed final sign-off Feb 2012 | 248 10th Av | add new bathroom on 3rd floor and remodel (e) bathroom on 3rd floor per plan. and add laundry room on 3rd floor per plan.Details
add new bathroom on 3rd floor and remodel (e) bathroom on 3rd floor per plan. and add laundry room on 3rd floor per plan. | $18,000 |
| Jul 19, 2011 | Completed final sign-off Nov 2011 | 3530 Taraval St | kitchen & (2)bathrooms. remodel & remove non-bearing wall between dining & kitchen @ 3rd fl. 3530 taraval.Details
kitchen & (2)bathrooms. remodel & remove non-bearing wall between dining & kitchen @ 3rd fl. 3530 taraval. | $25,000 |
| Jul 7, 2011 | Completed final sign-off Aug 2011 | 363 Madrid St | repair deck and sidings - less than 50%. change windows double hung oa front bay: 3 fiberglass.Details
repair deck and sidings - less than 50%. change windows double hung oa front bay: 3 fiberglass. | $5,000 |
| Jan 28, 2011 | Completed final sign-off Apr 2011 | 1545 Larkin St | remodel kitchen and bathroom, replace 6 windows, not visable from street on unit #a. remodel living room & dining room at unit #b per correction notice dated 1-28-2011. provide high efficency lights per 150 (k). replacement window u factor =0.40Details
remodel kitchen and bathroom, replace 6 windows, not visable from street on unit #a. remodel living room & dining room at unit #b per correction notice dated 1-28-2011. provide high efficency lights per 150 (k). replacement window u factor =0.40 | $20,000 |
| Jan 3, 2011 | Completed final sign-off Mar 2011 | 608 Kirkham St | repair front wall stucco 10'x8', replace & repair in kind, no structural work.Details
repair front wall stucco 10'x8', replace & repair in kind, no structural work. | $2,000 |
| Dec 24, 2010 | Completed final sign-off Mar 2011 | 1305 Cabrillo St | remodel 4 existing bathrooms & 4 existing kitchen. no change to wall, windows & doors, lighting to comply with cec 150 (k).Details
remodel 4 existing bathrooms & 4 existing kitchen. no change to wall, windows & doors, lighting to comply with cec 150 (k). | $75,000 |
| Dec 15, 2010 | Completed final sign-off Feb 2012 | 608 Kirkham St | remodel one bathroom for 1/f. lighting to comply with cec 150(k).Details
remodel one bathroom for 1/f. lighting to comply with cec 150(k). | $5,000 |
| Nov 15, 2010 | Completed final sign-off Jan 2011 | 3719 Folsom St | remodel upstair kitchen & bathroom - new drywall & insulation, same location. new plbg & electrical, new water heater, water pipe & central heater. repair exterior stucco. new lighting comply wich cec 150(k)Details
remodel upstair kitchen & bathroom - new drywall & insulation, same location. new plbg & electrical, new water heater, water pipe & central heater. repair exterior stucco. new lighting comply wich cec 150(k) | $20,000 |
| Oct 7, 2010 | Completed final sign-off Jan 2011 | 3719 Folsom St | repair existing deck in kind less than 50% at gr fl. repair existing balcony in kind at 2nd fl. enlarge ex bathroom, add 1 storage at gr fl levelDetails
repair existing deck in kind less than 50% at gr fl. repair existing balcony in kind at 2nd fl. enlarge ex bathroom, add 1 storage at gr fl level | $50,000 |
| Sep 21, 2010 | Completed final sign-off Mar 2011 | 3025 22nd Av | add one study room, one full bath room at ground floorDetails
add one study room, one full bath room at ground floor | $12,000 |
| Aug 20, 2010 | Completed final sign-off Sep 2010 | 55 Riverton Dr | repair stucco, build new stucco at house frontDetails
repair stucco, build new stucco at house front | $3,000 |
| Aug 20, 2010 | Completed final sign-off Sep 2010 | 59 Riverton Dr | repair stucco; build new stucco at house frontDetails
repair stucco; build new stucco at house front | $3,000 |
| Jul 8, 2010 | Completed final sign-off Jul 2010 | 43 Miramar Av | remove existing rear stairs and reduce rear deck to 8' x 5'. rebuild new stairs from rear deck down to rear yard. existing deck joist and decking to remainDetails
remove existing rear stairs and reduce rear deck to 8' x 5'. rebuild new stairs from rear deck down to rear yard. existing deck joist and decking to remain | $3,000 |
| Feb 10, 2010 | Completed final sign-off May 2010 | 640 Clay St | remodel apt.130,131,230,330. replace electrical wall heat & replace cabinets, sink and sheetrock.Details
remodel apt.130,131,230,330. replace electrical wall heat & replace cabinets, sink and sheetrock. | $4,000 |
| Feb 8, 2010 | Completed final sign-off Apr 2010 | 374 Bright St | add 2 bedrooms, 1 full bathroom on (e) ground floor (garage) per planDetails
add 2 bedrooms, 1 full bathroom on (e) ground floor (garage) per plan | $22,000 |
| Nov 4, 2009 | Completed final sign-off Mar 2010 | 330 Country Club Dr | add two bedrooms, one full bathroom and laundry room on ground floor.Details
add two bedrooms, one full bathroom and laundry room on ground floor. | $40,000 |
| Oct 5, 2009 | Completed final sign-off Mar 2010 | 300 Casitas Av | add two bedrooms, one stucdy room, one full bath room on ground/garage floor. add one full bathroom on 2nd fl.Details
add two bedrooms, one stucdy room, one full bath room on ground/garage floor. add one full bathroom on 2nd fl. | $45,000 |
| Sep 8, 2009 | Completed final sign-off May 2010 | 2530 22nd Av | construct 3'-0" deck on 2nd floor level at rear of (e) bldg. remodel (e) kitchen & 1 bathroom on (e) 2nd level. remodel (e) 2 bathrooms on (e) 3rd floor. repair (e) front stairs in kind, less than 50%.Details
construct 3'-0" deck on 2nd floor level at rear of (e) bldg. remodel (e) kitchen & 1 bathroom on (e) 2nd level. remodel (e) 2 bathrooms on (e) 3rd floor. repair (e) front stairs in kind, less than 50%. | $56,000 |
| Aug 27, 2009 | Completed final sign-off Jul 2010 | 1661 18th Av | construct rear deck with stairs on ground fl at rear of existing buildidng, add one bed room, family rm, full bathroom and two storage rooms on ground floor.Details
construct rear deck with stairs on ground fl at rear of existing buildidng, add one bed room, family rm, full bathroom and two storage rooms on ground floor. | $50,000 |
| Aug 5, 2009 | Completed final sign-off Nov 2009 | 1585 29th Av | add 1 playroom, laundry, 1 bedroom, 1 full bathroom & 1 storage room on (e) ground floor.Details
add 1 playroom, laundry, 1 bedroom, 1 full bathroom & 1 storage room on (e) ground floor. | $35,000 |
| May 11, 2009 | Completed final sign-off Aug 2009 | 1342 21st Av | add bedrooms, laundry room, and half bath at ground floorDetails
add bedrooms, laundry room, and half bath at ground floor | $25,000 |
| Apr 16, 2009 | Completed final sign-off May 2009 | 4832 California St | remove & replace front wall stucco. 1st & 2nd floor only.Details
remove & replace front wall stucco. 1st & 2nd floor only. | $3,500 |
| Oct 21, 2008 | Completed final sign-off Feb 2009 | 64 Grand View Av | replace windows-8 windows like for like.replace exist 5x4 window with 5x6'11" french door interior swing.replace 8'7"x6'11" set of 3 windows with 8'7"x6'11" french door interior swing 5' and 2 side fixed windows 19".decorative rail at frt.install railing to sf2007 bldg code@front of windows in kind.Details
replace windows-8 windows like for like.replace exist 5x4 window with 5x6'11" french door interior swing.replace 8'7"x6'11" set of 3 windows with 8'7"x6'11" french door interior swing 5' and 2 side fixed windows 19".decorative rail at frt.install railing to sf2007 bldg code@front of windows in kind. | $15,000 |
| Sep 11, 2008 | Completed final sign-off Feb 2009 | 64 Grand View Av | 1)remodel extg kitchen and 2 bathrooms on 2nd floor. 2)construct new reinforcing concrete retaining wall(max 4'-10" ht) for new patio on rear yard per plan. 3)new 2 french door on extg bedroom on 2nd floorDetails
1)remodel extg kitchen and 2 bathrooms on 2nd floor. 2)construct new reinforcing concrete retaining wall(max 4'-10" ht) for new patio on rear yard per plan. 3)new 2 french door on extg bedroom on 2nd floor | $60,000 |
| Jun 24, 2008 | Completed final sign-off Oct 2008 | 1945 20th Av | 2nd floor: remodel (e) kitchen/bathroom, add one new bathroom & convert (e) dining room to bedroom. ground floor: construct two bedroom, two bathroom, & storage area. construction a new deck at rear of bldg. (size approx. 16'-0" x 7').Details
2nd floor: remodel (e) kitchen/bathroom, add one new bathroom & convert (e) dining room to bedroom. ground floor: construct two bedroom, two bathroom, & storage area. construction a new deck at rear of bldg. (size approx. 16'-0" x 7'). | $65,000 |
| May 5, 2008 | Completed final sign-off Nov 2008 | 408 Edinburgh St | add one new full bathroom on ground floor garage area and one bathroom on 2nd floor family room area.Details
add one new full bathroom on ground floor garage area and one bathroom on 2nd floor family room area. | $20,000 |
| Apr 10, 2008 | Completed final sign-off Sep 2008 | 2218 31st Av | add 2 bedroom, 2 full bath room one storage and laundry area on (e) ground floor per plan. rewire and remodel (e) kichen and 2 full bathroom on 2nd floor. (n) fixtures in the bathroom and (n) cabinets, countertops and new sink in kitchenDetails
add 2 bedroom, 2 full bath room one storage and laundry area on (e) ground floor per plan. rewire and remodel (e) kichen and 2 full bathroom on 2nd floor. (n) fixtures in the bathroom and (n) cabinets, countertops and new sink in kitchen | $100,000 |
| Feb 4, 2008 | Completed final sign-off Mar 2008 | 1236 Leavenworth St | remodel 1 bathroom, replace kitchen cabinets and counter top.no structural work.Details
remodel 1 bathroom, replace kitchen cabinets and counter top.no structural work. | $8,000 |
| Aug 21, 2007 | Completed final sign-off Nov 2008 | 408 Edinburgh St | proposed one new family room on 2nd floor over existing garge per plans.Details
proposed one new family room on 2nd floor over existing garge per plans. | $38,000 |
| Apr 13, 2007 | Never finaled issued Apr 2007, no final | 300 03rd St | work @ unit# 610 only. no structural changes. bathroom: update of existing tiling on floor & in shower.Details
work @ unit# 610 only. no structural changes. bathroom: update of existing tiling on floor & in shower. | $1,300 |
| Mar 21, 2007 | Completed final sign-off May 2007 | 1555 Powell St | remodel an vacant store into facial esthete shopDetails
remodel an vacant store into facial esthete shop | $50,000 |
| Nov 13, 2006 | Completed final sign-off Mar 2007 | 232 Bowdoin St | to add one play room , one bed room , one study room and one fulll bath room on existing ground floor per paln.Details
to add one play room , one bed room , one study room and one fulll bath room on existing ground floor per paln. | $20,000 |
| Oct 12, 2006 | Completed final sign-off Dec 2006 | 130 Havenside Dr | remodel 1 kitchen only. no new appliances.Details
remodel 1 kitchen only. no new appliances. | $5,000 |
| Oct 6, 2006 | Completed final sign-off Jan 2007 | 4015 Lincoln Wy | legalize (e) bedroom and 1/2 bath room at rear portion of (e) garage. to comply ces physical inspection report#3r-4597 (report attached).Details
legalize (e) bedroom and 1/2 bath room at rear portion of (e) garage. to comply ces physical inspection report#3r-4597 (report attached). | $15,000 |
| Oct 3, 2006 | Completed final sign-off Oct 2006 | 1000 Junipero Serra Bl | repair stucco about 200 sqft back wall. replace in kind.Details
repair stucco about 200 sqft back wall. replace in kind. | $4,000 |
| Sep 28, 2006 | Never finaled filed Sep 2006, never issued | 4015 Lincoln Wy | to comply with 3r report #4597Details
to comply with 3r report #4597 | $1,000 |
| Jul 13, 2006 | Completed final sign-off Aug 2006 | 1277 Alemany Bl | repair existing front wall stucco. appox 180 sqft.Details
repair existing front wall stucco. appox 180 sqft. | $2,000 |
| Apr 6, 2006 | Completed final sign-off Sep 2006 | 759 Head St | add rooms at ground floor. infill under (e) sunroom area (12'x10')Details
add rooms at ground floor. infill under (e) sunroom area (12'x10') | $35,000 |
| Mar 24, 2006 | Completed final sign-off Jun 2006 | 2444 Anza St | in kind bathroom remodel at 1st floor existing. no change to walls or windows.Details
in kind bathroom remodel at 1st floor existing. no change to walls or windows. | $6,400 |
| Mar 20, 2006 | Completed final sign-off Aug 2006 | 1204 41st Av | repair existing exterior wall stucco at south side & west side approx. 800 s.f. surface.no area visable from streetDetails
repair existing exterior wall stucco at south side & west side approx. 800 s.f. surface.no area visable from street | $8,000 |
| Sep 20, 2005 | Completed final sign-off Oct 2005 | 1422 32nd Av | repair front wall stucco and damage wood in kindDetails
repair front wall stucco and damage wood in kind | $4,500 |
| Mar 22, 2005 | Completed final sign-off Jun 2005 | 839 London St | add rooms at ground floor fam rm bedrm and full bath storagesDetails
add rooms at ground floor fam rm bedrm and full bath storages | $23,000 |
| Oct 6, 2004 | Completed final sign-off Nov 2004 | 225 Pacheco St | front-remove existing wood deck at surface & replace w/flr material, remove dry rockwall as necessarDetails
front-remove existing wood deck at surface & replace w/flr material, remove dry rockwall as necessar | $8,000 |
| Oct 5, 2004 | Expired or cancelled expired Jan 2006 | 686 24th Av | remoe anc replace all existing windows, remove and rebuild abutment wall by stairway at front doorDetails
remoe anc replace all existing windows, remove and rebuild abutment wall by stairway at front door | $9,000 |
| Aug 6, 2004 | Completed final sign-off Oct 2004 | 1391 17th Av | repair & remodel kitchen & bathroom. kitchen replace counter & cabinet, flr & sink. (1) bathrm; replDetails
repair & remodel kitchen & bathroom. kitchen replace counter & cabinet, flr & sink. (1) bathrm; repl | $10,000 |
| Jul 21, 2004 | Completed final sign-off Oct 2004 | 735 Portola Dr | repair & remodel kitchen/bathroom & laundryDetails
repair & remodel kitchen/bathroom & laundry | $11,000 |