Shing Hing Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Oct 2004 to Apr 2019
- Last 24 months
- 0 permits filed
53 permits since 2000: 43 completed, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 18, 2019 | Expired or cancelled expired Feb 2025 | 376 31st Av | demo work without permit on first floor per citys complaint 201934399Details
demo work without permit on first floor per citys complaint 201934399 | $1,000 |
| Oct 9, 2018 | Completed final sign-off Nov 2018 | 730 38th Av | revision to app#201711164170. revised sheet a-4, revised window on east and north elevations for 1st floor onlyDetails
revision to app#201711164170. revised sheet a-4, revised window on east and north elevations for 1st floor only | $2,000 |
| Feb 21, 2018 | Completed final sign-off Nov 2018 | 730 38th Av | legalize foundation work for rear room done by former owner (unknown record). revision sheet a-4. to comply with nov #201834741. revisoni to pa# 201711164170Details
legalize foundation work for rear room done by former owner (unknown record). revision sheet a-4. to comply with nov #201834741. revisoni to pa# 201711164170 | $3,000 |
| Nov 16, 2017 | Completed final sign-off Nov 2018 | 730 38th Av | 1st floor remodeling: adding a new office and new full bathroom at ground floorDetails
1st floor remodeling: adding a new office and new full bathroom at ground floor | $40,000 |
| May 16, 2017 | Completed final sign-off Dec 2017 | 72 Middlefield Dr | work at ground floor only: remove & replace portion of deterorated footing with new at living area. remove one post at garage area & reinforce (e) wood beam with steel channels. add plywood shear walls @ ground floor.Details
work at ground floor only: remove & replace portion of deterorated footing with new at living area. remove one post at garage area & reinforce (e) wood beam with steel channels. add plywood shear walls @ ground floor. | $35,000 |
| Apr 26, 2017 | Completed final sign-off Dec 2017 | 72 Middlefield Dr | work at ground floor only - extend 3' from rear of ground floor to line up with 2nd floor exterior wall. renovate as built bathroom & replace all bathroom fixtures with new. renovate existing family room to become a new bedroom. renovate existing bedroom to have bigger closet.Details
work at ground floor only - extend 3' from rear of ground floor to line up with 2nd floor exterior wall. renovate as built bathroom & replace all bathroom fixtures with new. renovate existing family room to become a new bedroom. renovate existing bedroom to have bigger closet. | $20,000 |
| Apr 21, 2017 | Completed final sign-off Feb 2018 | 219 Monterey Bl | remodel a bathroom in the first floor. replace (2) exhaust fans. all new lites shall be led, remodel kitchen install sheetrock for a full bathroom. rev. to pa#201703020574. to comply with complaints #201652542 & 199703854Details
remodel a bathroom in the first floor. replace (2) exhaust fans. all new lites shall be led, remodel kitchen install sheetrock for a full bathroom. rev. to pa#201703020574. to comply with complaints #201652542 & 199703854 | $7,500 |
| Nov 18, 2016 | Expired or cancelled cancelled Dec 2020 | 734 07th Av | remove walls between, living dining kitche to create open living/dining/kitchen; remodel (e) master bedroom & closets into 2 bedrooms & closets; remodel (e) 2 bedroom & closets into master bedroom & new bath.Details
remove walls between, living dining kitche to create open living/dining/kitchen; remodel (e) master bedroom & closets into 2 bedrooms & closets; remodel (e) 2 bedroom & closets into master bedroom & new bath. | $50,000 |
| Mar 24, 2015 | Completed final sign-off May 2015 | 271 Dolores St | remodel bathroom, remove tiles for tub & floor tile,toilet,keep the tub,install new tiles for tub & floor,install vanity/sink,toilet wall lights,no alteration of wall window & door.Details
remodel bathroom, remove tiles for tub & floor tile,toilet,keep the tub,install new tiles for tub & floor,install vanity/sink,toilet wall lights,no alteration of wall window & door. | $3,500 |
| Oct 9, 2014 | Completed final sign-off Jul 2015 | 1204 Powhattan Av | remodel kitchen & 2 full bathrooms. replace (e) decking with new (less than 50%). all lighting will be high efficacy.Details
remodel kitchen & 2 full bathrooms. replace (e) decking with new (less than 50%). all lighting will be high efficacy. | $28,000 |
| Oct 9, 2014 | Completed final sign-off May 2015 | 1137 Potrero Av | unit 1137 (2/f): remodel kitchen, 1 bath, 1/2 bath, all lighting will be hi efficacy. unit 1139 (3/f): remodel kitchen, 1 full bath, 1/2 bath.Details
unit 1137 (2/f): remodel kitchen, 1 bath, 1/2 bath, all lighting will be hi efficacy. unit 1139 (3/f): remodel kitchen, 1 full bath, 1/2 bath. | $65,000 |
| Nov 25, 2013 | Completed final sign-off Jun 2014 | 1027 Russia Av | revision to 201002015705 - remodel master bathroom on 2nd floor with new plumbing fixtures.Details
revision to 201002015705 - remodel master bathroom on 2nd floor with new plumbing fixtures. | $8,000 |
| Jun 4, 2013 | Never finaled issued Jun 2013, no final | 945 Persia Av | replace six (6) windows with new on 2nd floor. to comply with ces nov #200845436. milgard fiberglass architectural saash, single-hung @ right above garage door. replace in-like-kind.Details
replace six (6) windows with new on 2nd floor. to comply with ces nov #200845436. milgard fiberglass architectural saash, single-hung @ right above garage door. replace in-like-kind. | $2,000 |
| Feb 5, 2013 | Completed final sign-off Feb 2013 | 701 43rd Av | obtain final inspection for pa#200710155396 to legalize 2nd unit on g/f. all work has been completed.Details
obtain final inspection for pa#200710155396 to legalize 2nd unit on g/f. all work has been completed. | |
| Oct 23, 2012 | Completed final sign-off Dec 2012 | 611 Paris St | kitchen remodel on second floorDetails
kitchen remodel on second floor | $8,500 |
| Aug 13, 2012 | Completed final sign-off Sep 2012 | 235 18th Av | install new siding at left & rear exterior wall finish paint all new siding.Details
install new siding at left & rear exterior wall finish paint all new siding. | $8,000 |
| Mar 2, 2012 | Completed final sign-off Sep 2012 | 2170 12th Av | revision to 201112190909. voluntary partial strenthening and structural alteration per plan. no changes to exterior or floor plan. no plumbing or electric work.Details
revision to 201112190909. voluntary partial strenthening and structural alteration per plan. no changes to exterior or floor plan. no plumbing or electric work. | $5,000 |
| Nov 10, 2011 | Never finaled issued Nov 2011, no final | 1491 08th Av | #1 - to comply with complaint #201167269 for bathroom remodel and kitchen remodel. no wall relocation. kitchen & bathroom remodel to comply with california electrical code cec 150(k)8 & 150(k)10 respectively.Details
#1 - to comply with complaint #201167269 for bathroom remodel and kitchen remodel. no wall relocation. kitchen & bathroom remodel to comply with california electrical code cec 150(k)8 & 150(k)10 respectively. | $8,000 |
| Oct 28, 2011 | Completed final sign-off Dec 2011 | 2473 27th Av | remodel existing bathroom. repair living room ceiling replace 1 side window. max ufactor .4Details
remodel existing bathroom. repair living room ceiling replace 1 side window. max ufactor .4 | $6,000 |
| Aug 4, 2011 | Completed final sign-off Sep 2012 | 2170 12th Av | to comply with complaint # 201149586, dated july 13, 2011. legalize (e) storage rooms and full bath room on ground floorDetails
to comply with complaint # 201149586, dated july 13, 2011. legalize (e) storage rooms and full bath room on ground floor | $30,000 |
| May 11, 2011 | Completed final sign-off Aug 2011 | 1338 Hampshire St | remove warning of violation 201123521 4 new wood window installed in the front, u -factor 0.40 maxDetails
remove warning of violation 201123521 4 new wood window installed in the front, u -factor 0.40 max | $1,600 |
| May 6, 2011 | Completed final sign-off Nov 2011 | 240 San Fernando Wy | replace e 2nd floor beam, revision to 201105065490Details
replace e 2nd floor beam, revision to 201105065490 | $1,000 |
| Mar 18, 2011 | Completed final sign-off Nov 2011 | 240 San Fernando Wy | revision to pa# 201101188506-sheet a2.1, relocate bathroom & bedroom on 2nd floorDetails
revision to pa# 201101188506-sheet a2.1, relocate bathroom & bedroom on 2nd floor | $5,000 |
| Jan 18, 2011 | Completed final sign-off Nov 2011 | 240 San Fernando Wy | kitchen and bathroom remodelingDetails
kitchen and bathroom remodeling | $10,000 |
| Sep 24, 2010 | Completed final sign-off Jun 2011 | 5116 Geary Bl | revision to pa# 2010.02.16.6624. reinforce (e) footing at left side of bldg. replace (e) slab on grade.Details
revision to pa# 2010.02.16.6624. reinforce (e) footing at left side of bldg. replace (e) slab on grade. | $2,000 |
| Sep 9, 2010 | Completed final sign-off Aug 2011 | 1338 Hampshire St | relocate e kitchen and bedroom in 1340. add 1 new bathroom in unit 1340Details
relocate e kitchen and bedroom in 1340. add 1 new bathroom in unit 1340 | $30,000 |
| May 24, 2010 | Completed final sign-off Jan 2011 | 18 Huntington Dr | revision to pa# 2010-0301-7352-revise the layout of 2 bedrooms, 1 full bathroom on lower floor. revise the layout of 2 full bathrooms & 1 closet on upper floorDetails
revision to pa# 2010-0301-7352-revise the layout of 2 bedrooms, 1 full bathroom on lower floor. revise the layout of 2 full bathrooms & 1 closet on upper floor | |
| Apr 21, 2010 | Completed final sign-off Jan 2011 | 18 Huntington Dr | change new cabinet in kitchen, replace tile & sheetrock sink counter, toilet bathtub, same location in 2 bathroom @ 2nd floor. no walls to be relocated & no structural work, lighting change must w/cec 150 (k).Details
change new cabinet in kitchen, replace tile & sheetrock sink counter, toilet bathtub, same location in 2 bathroom @ 2nd floor. no walls to be relocated & no structural work, lighting change must w/cec 150 (k). | $10,300 |
| Mar 23, 2010 | Completed final sign-off Aug 2011 | 1338 Hampshire St | to comply with correction 201037278 and 200928010. revise appl. #2009/1030/0192. new 5/8" type "x" gypsum board and sound channel at rear of building as in-kind (less than 50%) sister 2nd. flr. joist and new foundation at ground flr.Details
to comply with correction 201037278 and 200928010. revise appl. #2009/1030/0192. new 5/8" type "x" gypsum board and sound channel at rear of building as in-kind (less than 50%) sister 2nd. flr. joist and new foundation at ground flr. | $50,000 |
| Mar 1, 2010 | Completed final sign-off Jan 2011 | 18 Huntington Dr | remodel lower/ garage floor. new laundry, two new bedrooms, new full bathroom, remove (e) rear door and infill for new windowDetails
remodel lower/ garage floor. new laundry, two new bedrooms, new full bathroom, remove (e) rear door and infill for new window | $15,000 |
| Feb 16, 2010 | Completed final sign-off Jun 2011 | 5116 Geary Bl | demo of non-structural walls. new partition walls, plumbing, electrical, lighting to accomodate dental rooms. storefront changes, handicap bathrooms.Details
demo of non-structural walls. new partition walls, plumbing, electrical, lighting to accomodate dental rooms. storefront changes, handicap bathrooms. | $80,000 |
| Oct 30, 2009 | Completed final sign-off Aug 2011 | 1338 Hampshire St | remodel existing kitchen, full bathroom and 2 bedrooms. add one full bathroom on 2nd fl unit 1338. install new gas furnace and water heater in garage for unit 1338. see pa 200906261438 for compliance w/ nov 200909371.Details
remodel existing kitchen, full bathroom and 2 bedrooms. add one full bathroom on 2nd fl unit 1338. install new gas furnace and water heater in garage for unit 1338. see pa 200906261438 for compliance w/ nov 200909371. | $35,000 |
| Aug 31, 2009 | Never finaled issued Aug 2009, no final | 771 24th Av | renew pa# 2008/02/25/5474 to obtain final inspection. all work has been completed.Details
renew pa# 2008/02/25/5474 to obtain final inspection. all work has been completed. | |
| Aug 31, 2009 | Completed final sign-off Dec 2009 | 771 24th Av | renew pa# 2008/02/04/3865 to obtain final inspection. all work has been completed.Details
renew pa# 2008/02/04/3865 to obtain final inspection. all work has been completed. | |
| Aug 31, 2009 | Completed final sign-off Dec 2009 | 771 24th Av | renew pa# 2008/07/09/6330 to obtain final inspection. all work has been completed.Details
renew pa# 2008/07/09/6330 to obtain final inspection. all work has been completed. | |
| Aug 31, 2009 | Never finaled issued Aug 2009, no final | 771 24th Av | renew pa# 2008/06/18/4728 to obtain final inspection. all work has been completed.Details
renew pa# 2008/06/18/4728 to obtain final inspection. all work has been completed. | |
| Aug 31, 2009 | Never finaled issued Aug 2009, no final | 771 24th Av | renew pa# 2008/05/30/3210 to obtain final inspection. all work has been completed.Details
renew pa# 2008/05/30/3210 to obtain final inspection. all work has been completed. | |
| Jun 26, 2009 | Completed final sign-off Oct 2010 | 1338 Hampshire St | to comply with comp#200909371(kitchen and bath remodel interior). no change to wndows alteration. in unit 1338. replace kitchen sink, cabinet. replace toilet, tub, sink. install installation.Details
to comply with comp#200909371(kitchen and bath remodel interior). no change to wndows alteration. in unit 1338. replace kitchen sink, cabinet. replace toilet, tub, sink. install installation. | $17,000 |
| May 30, 2008 | Never finaled issued May 2008, no final | 771 24th Av | revision to 200802043865, relocate (e) bathroom, laundry room and voluntary foundation upgrade at rear of building. revise size of study room and closet. relocate door at hall.Details
revision to 200802043865, relocate (e) bathroom, laundry room and voluntary foundation upgrade at rear of building. revise size of study room and closet. relocate door at hall. | $5,000 |
| Feb 26, 2008 | Completed final sign-off Jul 2008 | 466 Victoria St | add 1 exterior door adjacent to (e) garage door and add interior walls and doors. add new light fixtures and electrical switches.Details
add 1 exterior door adjacent to (e) garage door and add interior walls and doors. add new light fixtures and electrical switches. | $7,000 |
| Jan 28, 2008 | Completed final sign-off May 2008 | 614 Persia Av | running electric wire, one new full bath, one bedroom,remodel and repartition one family room into bedroom and family room on ground floor.Details
running electric wire, one new full bath, one bedroom,remodel and repartition one family room into bedroom and family room on ground floor. | $25,000 |
| Sep 28, 2007 | Completed final sign-off Apr 2008 | 1338 Hampshire St | clarify #200709193143 to comply with nov#200450389 & #200562694.Details
clarify #200709193143 to comply with nov#200450389 & #200562694. | |
| Sep 19, 2007 | Completed final sign-off Apr 2008 | 1340 Hampshire St | to comply w/ nov 200562694, remove partitions in basement.Details
to comply w/ nov 200562694, remove partitions in basement. | |
| Sep 10, 2007 | Completed final sign-off Apr 2008 | 1338 Hampshire St | to comply with nov# 200502694. fix stairway in deck. remove basement. less than 50% in kind.Details
to comply with nov# 200502694. fix stairway in deck. remove basement. less than 50% in kind. | $4,000 |
| Aug 27, 2007 | Never finaled issued Aug 2007, no final | 380 07th Av | to add one playroom. one bedroom. one half bath room on existing ground floor per plan.Details
to add one playroom. one bedroom. one half bath room on existing ground floor per plan. | $18,000 |
| Jun 8, 2007 | Completed final sign-off Dec 2007 | 40 Nahua Av | horizontal addition: construct one story rear stairs down to groundfloor & rear yard. to add one bedroom, one playroom/laundry, one full bathroom and one storage on (e) groundfloor. to add one half bathroom on (e) 2nd floor per plan.Details
horizontal addition: construct one story rear stairs down to groundfloor & rear yard. to add one bedroom, one playroom/laundry, one full bathroom and one storage on (e) groundfloor. to add one half bathroom on (e) 2nd floor per plan. | $26,000 |
| Mar 16, 2007 | Never finaled issued Mar 2007, no final | 2447 27th Av | renovate extg rooms & powder room to a new master bedroom with full bath, reinforce wood beams at new master bedroom ceiling with new steel channels. remove and replace all dry rotted damage floor joists, studs and sheithing at garage level and lower roof at 2nd floorDetails
renovate extg rooms & powder room to a new master bedroom with full bath, reinforce wood beams at new master bedroom ceiling with new steel channels. remove and replace all dry rotted damage floor joists, studs and sheithing at garage level and lower roof at 2nd floor | $30,000 |
| Mar 2, 2007 | Completed final sign-off Apr 2007 | 361 Fair Oaks St | kitchen - new cabinets, refinish floor, paint. bathroom-new tiling, paint. no structural work - in kind.Details
kitchen - new cabinets, refinish floor, paint. bathroom-new tiling, paint. no structural work - in kind. | $8,000 |
| Oct 17, 2006 | Completed final sign-off Mar 2007 | 1115 York St | work @ unit# c only. new kitchen cabinets & floors. install dishwasher & garbage disposal. w / d hook ups. install new heater (associated heating) in (e) kitchen (no changes to partitions or windows)Details
work @ unit# c only. new kitchen cabinets & floors. install dishwasher & garbage disposal. w / d hook ups. install new heater (associated heating) in (e) kitchen (no changes to partitions or windows) | $6,500 |
| Oct 10, 2006 | Completed final sign-off May 2007 | 41 Foote Av | add 2 bedrooms, 1 half bath, 1 storage/laundry room on existing ground floor per planDetails
add 2 bedrooms, 1 half bath, 1 storage/laundry room on existing ground floor per plan | $22,000 |
| Mar 14, 2006 | Completed final sign-off Jun 2006 | 530 Kansas St | remodel (e) bathroom & kitchen @ unit#2. provide flor light. new cabinets, counters, floors & walls as needed.Details
remodel (e) bathroom & kitchen @ unit#2. provide flor light. new cabinets, counters, floors & walls as needed. | $18,000 |
| Jul 6, 2005 | Completed final sign-off Oct 2006 | 2479 27th Av | propose horizontal one story addition at rear of exist. twostory over garage, single family dwellingDetails
propose horizontal one story addition at rear of exist. twostory over garage, single family dwelling | $38,000 |
| Oct 12, 2004 | Completed final sign-off Feb 2005 | 2434 47th Av | front wall, dry rot, repair, stucco repair in the front of the houseDetails
front wall, dry rot, repair, stucco repair in the front of the house | $28,000 |