Shiel Construction
- Based in
- Petaluma
- On San Francisco permits
- Mar 2012 to Sep 2017
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 22, 2017 | Completed final sign-off Nov 2018 | 1042 Minna St | response to correction notice dated 9/6/17 to show as built conditions: obtain geotechnical letters based on the original structural drwgs pa 2004-0210-6098Details
response to correction notice dated 9/6/17 to show as built conditions: obtain geotechnical letters based on the original structural drwgs pa 2004-0210-6098 | $5,000 |
| May 3, 2017 | Completed final sign-off Jul 2018 | 1655 Washington St | soft story retrofit to comply with chapter 4d cebc appx a4 calcs. rev. to completed permit pa#200704118545 & 200902111839. memorialize all as-built conditions at garage and groundfloor.Details
soft story retrofit to comply with chapter 4d cebc appx a4 calcs. rev. to completed permit pa#200704118545 & 200902111839. memorialize all as-built conditions at garage and groundfloor. | $96,000 |
| Mar 6, 2015 | Completed final sign-off Jul 2018 | 1649 Washington St | to comply w/ nov #201119582. 3-story over basement. remodeled in 2008-2009 w/ various permits, however, rear deck exceeded the work shown on permit #200807015782-s, which expired before receiving final sign-off. this permit is intended to legalize non-permitted work & submit special inspection.Details
to comply w/ nov #201119582. 3-story over basement. remodeled in 2008-2009 w/ various permits, however, rear deck exceeded the work shown on permit #200807015782-s, which expired before receiving final sign-off. this permit is intended to legalize non-permitted work & submit special inspection. | |
| Mar 15, 2012 | Never finaled issued Apr 2012, no final | 260 10th St | t.i. includes:1) removal of partition walls installed by previous tenant. 2) replace drop ladder fire escape with steel stair.3)remove/replace int finishes to voluntary increase fire rating, insul, struc. 4)new int.doors, 3 skylights.Details
t.i. includes:1) removal of partition walls installed by previous tenant. 2) replace drop ladder fire escape with steel stair.3)remove/replace int finishes to voluntary increase fire rating, insul, struc. 4)new int.doors, 3 skylights. | $500,000 |