Sheldon W Doty General Contractor
- Based in
- Pacifica
- On San Francisco permits
- May 2011 to Mar 2017
- Last 24 months
- 0 permits filed
19 permits since 2000: 15 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 15, 2017 | Completed final sign-off Jan 2018 | 3266 24th St | stucco remove and replace. front facing.Details
stucco remove and replace. front facing. | $23,000 |
| Jun 8, 2016 | Completed final sign-off Jul 2016 | 497 Dellbrook Av | Details
| $14,004 |
| Dec 1, 2015 | Never finaled issued Dec 2015, no final | 5 Longview Ct | remove stucco from right side and back of building of addition. repair any dryrot and replace stucco to match existing. replace (2) windows, one on the right side and one on the back, like for like. not visible from street.Details
remove stucco from right side and back of building of addition. repair any dryrot and replace stucco to match existing. replace (2) windows, one on the right side and one on the back, like for like. not visible from street. | $8,000 |
| Nov 19, 2015 | Completed final sign-off Mar 2016 | 654 46th Av | remove stucco to the front of building. repair any dry rot and install new lathe and plaster and stucco to match existing.Details
remove stucco to the front of building. repair any dry rot and install new lathe and plaster and stucco to match existing. | $15,000 |
| Oct 5, 2015 | Completed final sign-off Dec 2015 | 758 Duncan St | remove siding at second floor. remove stucco from second floor back to bare sheathing. apply lath and stucco to match existing.Details
remove siding at second floor. remove stucco from second floor back to bare sheathing. apply lath and stucco to match existing. | $7,856 |
| Sep 24, 2015 | Completed final sign-off Dec 2015 | 551 Dellbrook Av | remove stucco from one wall on left side of building. install plywood sheating, lath and stucco to match existing. approx 800 sq. ft.Details
remove stucco from one wall on left side of building. install plywood sheating, lath and stucco to match existing. approx 800 sq. ft. | $11,500 |
| Jun 3, 2015 | Completed final sign-off Sep 2015 | 599 Monterey Bl | revision to 201505267145. to add dry rot work to existing permit on monterey blvd. scaffolding wrk is visible to street - monterey blvd.Details
revision to 201505267145. to add dry rot work to existing permit on monterey blvd. scaffolding wrk is visible to street - monterey blvd. | $10,000 |
| May 26, 2015 | Completed final sign-off Sep 2015 | 599 Monterey Bl | stucco repair - remove & replace approx 1000 sq ft of exisitng stucco due to membrane failure.Details
stucco repair - remove & replace approx 1000 sq ft of exisitng stucco due to membrane failure. | $22,000 |
| May 26, 2015 | Completed final sign-off Jul 2015 | 369 West Portal Av | stucco repair & remove & replace approx 1000 sq.ft. of existing stucco backside due to membrane failure- retrofit stucco (3 coat) on right side of building approx 1500 sft not visible from street.Details
stucco repair & remove & replace approx 1000 sq.ft. of existing stucco backside due to membrane failure- retrofit stucco (3 coat) on right side of building approx 1500 sft not visible from street. | $31,000 |
| Nov 17, 2014 | Completed final sign-off Jun 2015 | 12 Longview Ct | replace (e) deteriorated windows, same size and locations, 16 total. repair stucco as needed (surrounding windows). dark bronze metal windows made by all-weather, max u-factor 0.32.Details
replace (e) deteriorated windows, same size and locations, 16 total. repair stucco as needed (surrounding windows). dark bronze metal windows made by all-weather, max u-factor 0.32. | $19,400 |
| Aug 5, 2013 | Completed final sign-off Sep 2013 | 46 Wawona St | remove and replace approx. 900 sf of (e) stucco on left side of residence.Details
remove and replace approx. 900 sf of (e) stucco on left side of residence. | $13,000 |
| Sep 5, 2012 | Completed final sign-off Sep 2012 | 436 Country Club Dr | remove stucco, repair dryrot, replace stucco around garage door area, visable from street, repair in kind.Details
remove stucco, repair dryrot, replace stucco around garage door area, visable from street, repair in kind. | $3,500 |
| Aug 8, 2012 | Never finaled issued Aug 2012, no final | 4 Ashbury Tr | open exterior wall at bedroom level, complete minor dryrot repairs, upgrade sheathing and replace as built 30x10 area work at front of bldg on 3rd floor.Details
open exterior wall at bedroom level, complete minor dryrot repairs, upgrade sheathing and replace as built 30x10 area work at front of bldg on 3rd floor. | $12,500 |
| Apr 16, 2012 | Completed final sign-off Sep 2012 | 1907 20th St | existing ground floor bathroom renovation within the same building footprint. removing existing shed wall to enlarge existing bathroom. legalize this bathroom.Details
existing ground floor bathroom renovation within the same building footprint. removing existing shed wall to enlarge existing bathroom. legalize this bathroom. | $10,000 |
| Dec 7, 2011 | Completed final sign-off Dec 2011 | 514 Congo St | remove and replace the existing aluminum siding with 2 layer of building paper, lath and 3 coat of stucco at front facade of residence, with scaffolding where required, approx. 400 sq.ft. facing the street.Details
remove and replace the existing aluminum siding with 2 layer of building paper, lath and 3 coat of stucco at front facade of residence, with scaffolding where required, approx. 400 sq.ft. facing the street. | $4,500 |
| Oct 17, 2011 | Completed final sign-off Dec 2011 | 2510 Bryant St | remove & replace existing stucco on facade of residence, minor dryrot repairs due to membrane failure, full description attached.Details
remove & replace existing stucco on facade of residence, minor dryrot repairs due to membrane failure, full description attached. | $14,602 |
| Sep 14, 2011 | Expired or cancelled expired Feb 2013 | 1521 Howard St | comply with nov# 200929513; front stair riser & tread repair, rear bedroom window replacement, install new gas furnace, remove nonconforming partitions in basement, seismic strap water heaterDetails
comply with nov# 200929513; front stair riser & tread repair, rear bedroom window replacement, install new gas furnace, remove nonconforming partitions in basement, seismic strap water heater | $5,000 |
| Aug 23, 2011 | Never finaled issued Aug 2011, no final | 225 Valdez Av | remove approx. 720 sq.ft. of existing stucco and replace to stop water peneration (south & rear of bldg).Details
remove approx. 720 sq.ft. of existing stucco and replace to stop water peneration (south & rear of bldg). | $7,200 |
| May 5, 2011 | Completed final sign-off Jun 2011 | 2919 Mission St | set up scaffold-remove some stucco due to failure and replace as built (area -1600 s.f.), facing the street, replace in kindDetails
set up scaffold-remove some stucco due to failure and replace as built (area -1600 s.f.), facing the street, replace in kind | $48,800 |