Shamrock Western Corporation
- Based in
- San Francisco
- On San Francisco permits
- Dec 2024 to Sep 2025
- Last 24 months
- 2 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 12, 2025 | Completed final sign-off Jan 2026 | 1333 Jones St | unit 1208: remove and replace sliding glass doors/window across living room and two bedrooms. no chamge in layout or foundation, brushed stainless steel frame, non street visible, back of building. in kind in same opening. mxa u. factor 0.58, unit 1208.Details
unit 1208: remove and replace sliding glass doors/window across living room and two bedrooms. no chamge in layout or foundation, brushed stainless steel frame, non street visible, back of building. in kind in same opening. mxa u. factor 0.58, unit 1208. | $58,000 |
| Dec 17, 2024 | Completed final sign-off May 2025 | 2209 Pacific Av | remove and replace stucco at the rear of the building to match the (e) facade. the front facade will remain unchanged. decorative trim detailing will be replaced in kind as required. approx 300 sfDetails
remove and replace stucco at the rear of the building to match the (e) facade. the front facade will remain unchanged. decorative trim detailing will be replaced in kind as required. approx 300 sf | $50,000 |