Shaad General Construction
- Based in
- So Sf
- On San Francisco permits
- Feb 2008 to Sep 2008
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2008 | Expired or cancelled expired Feb 2012 | 566 Gellert Dr | renew pa# 2007/12/19/0828 for final inspection only.Details
renew pa# 2007/12/19/0828 for final inspection only. | |
| Feb 7, 2008 | Completed final sign-off Nov 2008 | 566 Gellert Dr | kitchen remodel-remove/replace kitchen cabinets, counter tops, floor covering, remodel 2 bathrooms-new fixtures, tile, repair dry wall/dry rot in dining room as needed. no lighting change.Details
kitchen remodel-remove/replace kitchen cabinets, counter tops, floor covering, remodel 2 bathrooms-new fixtures, tile, repair dry wall/dry rot in dining room as needed. no lighting change. | $40,000 |