Sh Air Conditioning Specialist
- Based in
- San Francisco
- On San Francisco permits
- May 2011 to May 2011
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 11, 2011 | Never finaled issued May 2011, no final | 1737 Post St | replace existing a/c unit with new three and half ton a/c unit. split type heat pump system. approx same weight, hvac.Details
replace existing a/c unit with new three and half ton a/c unit. split type heat pump system. approx same weight, hvac. | $4,300 |