Sfr Builders Inc
- Based in
- Richmond
- On San Francisco permits
- Apr 2026 to Sep 2026
- Last 24 months
- 5 permits filed
5 permits since 2000: 2 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 11, 2026 | In progress issued Sep 2026 | 209 Hazelwood Av | like for like bathroom remodel in existing layout. replace existing shower pan. waterproofing and associated finishes. replace bathroom tile, vanity and finish fixtures in existing locations. localized plumbing and electrical work. no change to building footprint, occupancy or dwelling unit.Details
like for like bathroom remodel in existing layout. replace existing shower pan. waterproofing and associated finishes. replace bathroom tile, vanity and finish fixtures in existing locations. localized plumbing and electrical work. no change to building footprint, occupancy or dwelling unit. | $22,000 |
| Sep 9, 2026 | In progress issued Sep 2026 | 632 Anza St | install exterior french drain and foundation waterproofing system along (e) foundation. include excavation of 4 in perfroated sdr 35 piping drain rock, filter fabric waterproofing membrane and replacement of (e) sump pump with connection to (e) discharge. backfill disturbed area upon completion.Details
install exterior french drain and foundation waterproofing system along (e) foundation. include excavation of 4 in perfroated sdr 35 piping drain rock, filter fabric waterproofing membrane and replacement of (e) sump pump with connection to (e) discharge. backfill disturbed area upon completion. | $20,000 |
| Aug 20, 2026 | In progress issued Aug 2026 | 176 Yerba Buena Av | remove & repair existing exterior tile at entry landing & stairs. repair substrte as required to provide postive drainage. install nw perimeter flashing & exterior waterproofing membrane perform localized stucco removal & restoration as required for waterproofing integration. reinstall exterior tileDetails
remove & repair existing exterior tile at entry landing & stairs. repair substrte as required to provide postive drainage. install nw perimeter flashing & exterior waterproofing membrane perform localized stucco removal & restoration as required for waterproofing integration. reinstall exterior tile | $21,000 |
| Jun 11, 2026 | Completed final sign-off Jul 2026 | 232 Clinton Pk | voluntary seismic retrofit of (e) wood-frame residential building. scope includes installation of plywood shear panels, anchor bolts, mud sill anchorage, framing connectors, and related cripple wall strenghtening per approved retrofit plans no change to use, occupancy, or floor area.Details
voluntary seismic retrofit of (e) wood-frame residential building. scope includes installation of plywood shear panels, anchor bolts, mud sill anchorage, framing connectors, and related cripple wall strenghtening per approved retrofit plans no change to use, occupancy, or floor area. | $7,200 |
| Apr 24, 2026 | Completed final sign-off Aug 2026 | 232 Clinton Pk | 3 bathroom remodels, replace fixtures, tiles, finishes, minor plumbing, electrical upgrades, ventilation improvements. no structual changes. no change in foot print.Details
3 bathroom remodels, replace fixtures, tiles, finishes, minor plumbing, electrical upgrades, ventilation improvements. no structual changes. no change in foot print. | $36,000 |