Sf Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2019 to Jul 2026
- Last 24 months
- 4 permits filed
16 permits since 2000: 12 completed, 3 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 31, 2026 | In progress issued Jul 2026 | 40 Temescal Tr | recommencement and completion of work approved under pa# 201508103826.Details
recommencement and completion of work approved under pa# 201508103826. | $17,500 |
| Jan 31, 2026 | In progress issued Aug 2026 | 459 27th Av | new 2-story horizontal rear addition. new office and bathroom on 1/f. relocate kitchen and living from 2/f to 1/f. reconfig stairs, add master bedroom on 2/f.Details
new 2-story horizontal rear addition. new office and bathroom on 1/f. relocate kitchen and living from 2/f to 1/f. reconfig stairs, add master bedroom on 2/f. | $485,000 |
| Mar 31, 2025 | Completed final sign-off Apr 2025 | 2643 Anza St | address violation #202534537 replace rusted out joist hangers #02Details
address violation #202534537 replace rusted out joist hangers #02 | $500 |
| Feb 13, 2025 | Completed final sign-off May 2025 | 148 Locksley Av | remodel of kitchen in kind bring plumbing and electrical up to current code and title 24 install new cabinetsDetails
remodel of kitchen in kind bring plumbing and electrical up to current code and title 24 install new cabinets | $25,000 |
| Jun 20, 2024 | In progress issued Jul 2024 | 2645 Anza St | revision to bpa# 202401314952. remodel of powder bathroom and addition of shower, bring up to code. addition of stacked dryer and washer to kitchen remodel.Details
revision to bpa# 202401314952. remodel of powder bathroom and addition of shower, bring up to code. addition of stacked dryer and washer to kitchen remodel. | $28,500 |
| Jan 31, 2024 | Completed final sign-off Nov 2024 | 2645 Anza St | remodel of kitchen and bathroom in kind. new shower pan- bring electrical and plumbing up to code. installation of new interior doors and trim and painting of apartment. not moving walls, no layout change.Details
remodel of kitchen and bathroom in kind. new shower pan- bring electrical and plumbing up to code. installation of new interior doors and trim and painting of apartment. not moving walls, no layout change. | $42,000 |
| Dec 20, 2023 | Completed final sign-off May 2024 | 3126 Balboa St | apt #3: remodel of one kitchen, bring electrical and plumbing up to code. replace everything in kind.Details
apt #3: remodel of one kitchen, bring electrical and plumbing up to code. replace everything in kind. | $15,000 |
| Aug 16, 2023 | Never finaled issued Aug 2023, no final | 459 27th Av | repair dry rot at sides of garage door as report in sellers report (front). replace (3) studs max. each side. replace in-kindDetails
repair dry rot at sides of garage door as report in sellers report (front). replace (3) studs max. each side. replace in-kind | $8,500 |
| Jul 24, 2023 | Completed final sign-off May 2024 | 3126 Balboa St | dryrot repair, replace rotten plywood in-kind, ply replace w 1/2" str i w/ 3"/12" 10d nail, 3x edge. front of bldg only, approx 700 s.f.Details
dryrot repair, replace rotten plywood in-kind, ply replace w 1/2" str i w/ 3"/12" 10d nail, 3x edge. front of bldg only, approx 700 s.f. | $17,500 |
| Mar 9, 2023 | Completed final sign-off Sep 2023 | 495 21st Av | remodel bathroom and kitchen in kind. install new cabinets and appliances. repaint whole apartment.Details
remodel bathroom and kitchen in kind. install new cabinets and appliances. repaint whole apartment. | $35,000 |
| Sep 10, 2020 | Completed final sign-off Jun 2021 | 2643 Anza St | remodel of kitchen and bath replaced in kind. new shower pan, led cans, cabinets countertopsDetails
remodel of kitchen and bath replaced in kind. new shower pan, led cans, cabinets countertops | $30,000 |
| Aug 29, 2020 | Completed final sign-off Nov 2022 | 493 21st Av | voluntary seismic strengthening per ab-094. widen existing garage doors.Details
voluntary seismic strengthening per ab-094. widen existing garage doors. | $50,000 |
| Jul 14, 2020 | Completed final sign-off Apr 2021 | 1447 27th Av | repair dry rot on front wall of building, replace framing plywood & replace stucco inkindDetails
repair dry rot on front wall of building, replace framing plywood & replace stucco inkind | $7,500 |
| Nov 7, 2019 | Completed final sign-off Jan 2020 | 3101 Buchanan St | remodel of bathroom. bring bathroom up to current code with building, plumbing and electrical. change tub into shower, toilet & sink stays in the same place. installation of 4 led cans and one pan and gfi plug. painting & tiling also. same size same locationDetails
remodel of bathroom. bring bathroom up to current code with building, plumbing and electrical. change tub into shower, toilet & sink stays in the same place. installation of 4 led cans and one pan and gfi plug. painting & tiling also. same size same location | $15,000 |
| Nov 7, 2019 | Completed final sign-off Jul 2020 | 124 Ortega St | repair of dry rot at front facade and replacement of stone at lower level in-kind. no facade alterations under this permit.Details
repair of dry rot at front facade and replacement of stone at lower level in-kind. no facade alterations under this permit. | $8,000 |
| Feb 7, 2019 | Completed final sign-off Apr 2019 | 497 21st Av | remodel of existing bathroom, change bathtub into shower encloser, bring up to title 24, install shower pan, vent fan through roof and vent microwave- exhaust fan through roof also install dishwasher, new closet in bathroom, replace replace closet door.Details
remodel of existing bathroom, change bathtub into shower encloser, bring up to title 24, install shower pan, vent fan through roof and vent microwave- exhaust fan through roof also install dishwasher, new closet in bathroom, replace replace closet door. | $14,500 |