Sequoia Construction & Development Inc

Contractor license
880332
State license record
Based in
Martinez
On San Francisco permits
Jun 2012 to Sep 2015
Last 24 months
0 permits filed

4 permits since 2000: 3 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

AllStairs 1
FiledOutcomeAddressWork described on the permitDeclared cost
Sep 24, 2015Never finaled
issued Oct 2015, no final
1000 Evans Avrevision to ref pa201006255335: excavation of soils to subgrade, removal of wall/underground obstructions. prepartion of subgrade, backfill.
Details
Permit
201509248013
Status
issued
Filed
Sep 24, 2015
Permit issued
Oct 1, 2015
Declared cost
$140,000
Address
1000 Evans Av

revision to ref pa201006255335: excavation of soils to subgrade, removal of wall/underground obstructions. prepartion of subgrade, backfill.

Open the permit page

$140,000
Oct 9, 2012Completed
final sign-off Dec 2012
1000 Evans Avfill bottom 1'-3" w/ controlled density (flwable) fill, then 3 to 5' rock fill, then 5.5' (approximately) of compacted fill. provide ac paving section (2" ac, 4" bserck) over filled area. all work is within limit of unit 4 foundation. remove all street pipes and stairs as required.
Details
Permit
201210091651
Status
complete
Filed
Oct 9, 2012
Permit issued
Oct 16, 2012
Final sign-off
Dec 17, 2012
Declared cost
$733,000
Address
1000 Evans Av

fill bottom 1'-3" w/ controlled density (flwable) fill, then 3 to 5' rock fill, then 5.5' (approximately) of compacted fill. provide ac paving section (2" ac, 4" bserck) over filled area. all work is within limit of unit 4 foundation. remove all street pipes and stairs as required.

Open the permit page

$733,000
Sep 26, 2012Completed
final sign-off Dec 2012
1180 Evans Avfine grade lot. install 6" (4" baserock, 2" asphalt) parving. install drainage system.
Details
Permit
201209260671
Status
complete
Filed
Sep 26, 2012
Permit issued
Sep 27, 2012
Final sign-off
Dec 14, 2012
Declared cost
$450,000
Address
1180 Evans Av

fine grade lot. install 6" (4" baserock, 2" asphalt) parving. install drainage system.

Open the permit page

$450,000
Jun 4, 2012Completed
final sign-off Jan 2013
151 Jennings Strevision to 20100625335. incude area b phase 2 detail for grading plan. paving included. no excavation under this permit.
Details
Permit
201206041805
Status
complete
Filed
Jun 4, 2012
Permit issued
Jun 6, 2012
Final sign-off
Jan 2, 2013
Declared cost
$366,450
Address
151 Jennings St

revision to 20100625335. incude area b phase 2 detail for grading plan. paving included. no excavation under this permit.

Open the permit page

$366,450