Sebastian Nichols Design Build
- Based in
- San Francisco
- On San Francisco permits
- Jan 2017 to May 2019
- Last 24 months
- 0 permits filed
4 permits since 2000: 2 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 20, 2019 | Expired or cancelled cancelled Jan 2026 | 575 Diamond St | remove (e) deck in backyard of house. replace (e) deck with new ipe wood deck with steel bar guardrailDetails
remove (e) deck in backyard of house. replace (e) deck with new ipe wood deck with steel bar guardrail | $15,000 |
| Jun 30, 2017 | Completed final sign-off Oct 2017 | 383 Lombard St | demo (e) bathroom down to studs. install new shower fixtures, new tub with tub surround, install new drywall where needed, new vanity medicine cabinet and continue (e) engineered hardwood floorsDetails
demo (e) bathroom down to studs. install new shower fixtures, new tub with tub surround, install new drywall where needed, new vanity medicine cabinet and continue (e) engineered hardwood floors | $10,000 |
| Feb 21, 2017 | Completed final sign-off Sep 2020 | 425 01st St | one bath remodel: demo (e) tile, tub and vanity in bathroom. re-tile tub surround, floor and back wall with new tile. install new tub, vanity and toilet. non-structural.Details
one bath remodel: demo (e) tile, tub and vanity in bathroom. re-tile tub surround, floor and back wall with new tile. install new tub, vanity and toilet. non-structural. | $10,000 |
| Jan 19, 2017 | Expired or cancelled expired Sep 2019 | 11 Santa Fe Av | voluntary structural upgrade and remodel of lower level as habitable space. new master bedroom, media and master bath on the ground floor. remove 5 cubic yard off material in backyard.Details
voluntary structural upgrade and remodel of lower level as habitable space. new master bedroom, media and master bath on the ground floor. remove 5 cubic yard off material in backyard. | $10,000 |