Permit GraphShortlistSan Francisco building permits since 2000

Sean Molloy Conctete Construction

Contractor license
833656
State license record
Based in
San Francisco
On San Francisco permits
Feb 2006 to Dec 2006
Last 24 months
0 permits filed

2 permits since 2000: 1 completed, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Dec 4, 2006Completed
final sign-off Aug 2007
459 Potrero Avreplacement of rear property retaining wall
Details
Permit
200612049074
Status
complete
Filed
Dec 4, 2006
Permit issued
Dec 4, 2006
Final sign-off
Aug 16, 2007
Declared cost
$11,500
Address
459 Potrero Av

replacement of rear property retaining wall

Open the permit page

$11,500
Feb 14, 2006Expired or cancelled
expired Mar 2007
417 Scott Strepair damaged concrete on garage floor level/replace: slab on grade, entire garage slab approx 1600 sqft provide drainage. no rebar on sidewalk. #4 rebar @ 16" on center min 4 1/2 slab in same area. repair and replace drive way & side @ front of building.
Details
Permit
200602144575
Status
expired
Filed
Feb 14, 2006
Permit issued
Feb 14, 2006
Declared cost
$9,000
Address
417 Scott St

repair damaged concrete on garage floor level/replace: slab on grade, entire garage slab approx 1600 sqft provide drainage. no rebar on sidewalk. #4 rebar @ 16" on center min 4 1/2 slab in same area. repair and replace drive way & side @ front of building.

Open the permit page

$9,000