Scott R Banister
- Based in
- Berkeley
- On San Francisco permits
- Sep 2003 to May 2004
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 19, 2004 | Never finaled issued May 2004, no final | 522 Clipper St | final inspection per app #200108145991Details
final inspection per app #200108145991 | |
| Feb 27, 2004 | Completed final sign-off May 2004 | 522 Clipper St | install 5/8 bolts at (e) fuondation/infill frame for 1/2 plywood at craw space.bolt dembedmont 7" *Details
install 5/8 bolts at (e) fuondation/infill frame for 1/2 plywood at craw space.bolt dembedmont 7" * | $2,100 |
| Jan 28, 2004 | Completed final sign-off May 2004 | 522 Clipper St | remove & replace 7 windows,reface (e) cabinets, add new cabinets,windows not facing street,replaceDetails
remove & replace 7 windows,reface (e) cabinets, add new cabinets,windows not facing street,replace | $6,800 |
| Sep 23, 2003 | Completed final sign-off May 2004 | 522 Clipper St | upgrade existing east wall off building to 1 hr fire wall, apply 5/8 type x exterior rook over existDetails
upgrade existing east wall off building to 1 hr fire wall, apply 5/8 type x exterior rook over exist | $3,500 |