Savon Construction Company
- Based in
- Montara
- On San Francisco permits
- Nov 2008 to Dec 2009
- Last 24 months
- 0 permits filed
12 permits since 2000: 7 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2009 | Never finaled issued Dec 2009, no final | 1469 Sacramento St | replace 7 vinyl windows in kind at rear of building. u factor 0.67Details
replace 7 vinyl windows in kind at rear of building. u factor 0.67 | $2,100 |
| Nov 20, 2009 | Never finaled issued Nov 2009, no final | 4256 22nd St | repair fix approx. 50 sq ft stucco and repair approx.15 sq ft concrete at garage area.Details
repair fix approx. 50 sq ft stucco and repair approx.15 sq ft concrete at garage area. | $1,000 |
| Nov 16, 2009 | Completed final sign-off May 2010 | 92 Santa Marina St | renovate bathroom; add bathroom @ (e) closet/laundry room. in-fill (e) light well. add 3-skylights. 30" parapet @ skylight location per plan.Details
renovate bathroom; add bathroom @ (e) closet/laundry room. in-fill (e) light well. add 3-skylights. 30" parapet @ skylight location per plan. | $30,000 |
| Nov 4, 2009 | Completed final sign-off Nov 2009 | 4256 22nd St | replace 30% of (e) redwood planks on deck, approx 40 planksDetails
replace 30% of (e) redwood planks on deck, approx 40 planks | $4,500 |
| Sep 29, 2009 | Never finaled issued Sep 2009, no final | 187 Stanyan St | replace 7 windows in back of house. same size, same openingDetails
replace 7 windows in back of house. same size, same opening | $3,000 |
| Aug 28, 2009 | Completed final sign-off May 2010 | 412 Jersey St | retile & change fixtures in two bathrooms (faucets only). re-sheetrock garage 200 sq ft. install fluorescent lights in garage. service upgrade electrical 125a.Details
retile & change fixtures in two bathrooms (faucets only). re-sheetrock garage 200 sq ft. install fluorescent lights in garage. service upgrade electrical 125a. | $12,000 |
| Aug 27, 2009 | Never finaled issued Aug 2009, no final | 806 43rd Av | replace garage door in kind. repair concrete in front (approx. 80 sq ft) at driveway. repair stucco in front approx. 40sq ft. around garage door. repair concrete plantar box in front and re-tile.Details
replace garage door in kind. repair concrete in front (approx. 80 sq ft) at driveway. repair stucco in front approx. 40sq ft. around garage door. repair concrete plantar box in front and re-tile. | $5,000 |
| Aug 25, 2009 | Expired or cancelled expired Oct 2009 | 65 Santa Clara Av | replace 28 windows on side & back of the house in kind. wood. replace furnace with 70.000 btv umt. replace b vents & ducts. install 150 sq feet of r-30 insulation in attic. increase valuation of appl. 200907072131 by $ 20.000. u = 0.67 typical for new windows.Details
replace 28 windows on side & back of the house in kind. wood. replace furnace with 70.000 btv umt. replace b vents & ducts. install 150 sq feet of r-30 insulation in attic. increase valuation of appl. 200907072131 by $ 20.000. u = 0.67 typical for new windows. | $65,000 |
| Jul 7, 2009 | Completed final sign-off Nov 2009 | 65 Santa Clara Av | reface kitchen cabinets. partially repalce tiel on countertop in kitchen. partially replace tile in 2 bathrooms, refinish approximately 100 sq. ft. of handwood floor. no electrical and plumbing work. no lighting change.Details
reface kitchen cabinets. partially repalce tiel on countertop in kitchen. partially replace tile in 2 bathrooms, refinish approximately 100 sq. ft. of handwood floor. no electrical and plumbing work. no lighting change. | $1,200 |
| Jun 29, 2009 | Completed final sign-off Jun 2010 | 412 Jersey St | partially demo sheetrock on 1st flr and garage approx 150 sq.ft. for inspectionDetails
partially demo sheetrock on 1st flr and garage approx 150 sq.ft. for inspection | $1,000 |
| Jun 29, 2009 | Completed final sign-off Aug 2009 | 806 43rd Av | install 70,000 btu carrier furnace, (5/8" type x) install 2 pieces of sheetrock tape (fire), replace 4 new bedrm doors wwith same size, 1 hr rated; plumbing under separate permitDetails
install 70,000 btu carrier furnace, (5/8" type x) install 2 pieces of sheetrock tape (fire), replace 4 new bedrm doors wwith same size, 1 hr rated; plumbing under separate permit | $1,200 |
| Nov 7, 2008 | Completed final sign-off Jun 2010 | 412 Jersey St | horizontal & vertical addition, 1st fl: remove 2 columns/replace w/ new. 2nd fl: remodel kitchen & bathrm, add new stair to 3rd fl, expand deck @ rear & add barrier wall. 3rd fl: add 3rd floor addition including master bedrm & bath, guest & bath, 2 lightwells and stair.full seismic upgrade.Details
horizontal & vertical addition, 1st fl: remove 2 columns/replace w/ new. 2nd fl: remodel kitchen & bathrm, add new stair to 3rd fl, expand deck @ rear & add barrier wall. 3rd fl: add 3rd floor addition including master bedrm & bath, guest & bath, 2 lightwells and stair.full seismic upgrade. | $275,000 |