Sapphire Bay Area Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2023 to Sep 2026
- Last 24 months
- 3 permits filed
4 permits since 2000: 2 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2026 | In progress issued Oct 2026 | 372 Baltimore Wy | legalize as-built bedroom & closet on 1st floor within existing conditional space. no exterior or structural alterationDetails
legalize as-built bedroom & closet on 1st floor within existing conditional space. no exterior or structural alteration | $20,000 |
| Sep 25, 2025 | In progress issued Sep 2025 | 222 Holyoke St | 1st/f: remodel e) bathroom & add a new wet bar at e) study room. 2nd/f: remodel e) bathroom & relocate of kitchenDetails
1st/f: remodel e) bathroom & add a new wet bar at e) study room. 2nd/f: remodel e) bathroom & relocate of kitchen | $58,000 |
| Sep 17, 2025 | Completed final sign-off Nov 2025 | 372 Baltimore Wy | construct a new 3 fixture bath and convert the existing baths bathtub into a shower on 2nd fl with no structural alterations under this permit. add new window at new bath.Details
construct a new 3 fixture bath and convert the existing baths bathtub into a shower on 2nd fl with no structural alterations under this permit. add new window at new bath. | $35,000 |
| May 8, 2023 | Completed final sign-off Nov 2023 | 268 Goettingen St | 1/f: upgrade electrical service to 100 amps. install a new gas w.h and furnace. 2/f: replace front facade and lightwell window in kind. remove fire place in living room. remodel the kitchen by removing a non-bearing wall. reconfigure full bath and add a powder room. install new electrical outletsDetails
1/f: upgrade electrical service to 100 amps. install a new gas w.h and furnace. 2/f: replace front facade and lightwell window in kind. remove fire place in living room. remodel the kitchen by removing a non-bearing wall. reconfigure full bath and add a powder room. install new electrical outlets | $70,000 |