San Francisco Earthquake Retrofitting
- Based in
- San Bruno
- On San Francisco permits
- Apr 2007 to Oct 2018
- Last 24 months
- 0 permits filed
29 permits since 2000: 25 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 24, 2018 | Completed final sign-off Nov 2018 | 350 Page St | volatary strengtheing, add 40 simpson, ulfp sds3 to existing mudslide crawl space every 3'0 , add 1/2" struct 1 cdx. plywood to existing criddle walls in basement, add 3by 4 studs where needed for nailing. use 6-12 patch.Details
volatary strengtheing, add 40 simpson, ulfp sds3 to existing mudslide crawl space every 3'0 , add 1/2" struct 1 cdx. plywood to existing criddle walls in basement, add 3by 4 studs where needed for nailing. use 6-12 patch. | $19,600 |
| Jan 17, 2018 | Completed final sign-off Feb 2018 | 4 Ord Ct | brace & bolt, add 5/8 anchor bolts with simpson set xp epoxy every 4 ft with 7" embedment to left, rear and 20 ft of right wall, add 1/2" osb struct 1 to left, rear and 10 ft of right side wall. 10d common at 6" e.n, 12" field.Details
brace & bolt, add 5/8 anchor bolts with simpson set xp epoxy every 4 ft with 7" embedment to left, rear and 20 ft of right wall, add 1/2" osb struct 1 to left, rear and 10 ft of right side wall. 10d common at 6" e.n, 12" field. | $8,400 |
| Jan 17, 2018 | Completed final sign-off Jan 2019 | 155 Moffitt St | insulate front, rear, and right side perimter walls with woodrock insulation. add 5/8 anchor bolts with simpson set xp epoxy every 4 ft with 7" embedment to left, rear and 20 ft of right wall, add 1/2" osb struct 1 to left, rear and 10 ft of right side wall. 10d common at 6" e.n, 12" field.Details
insulate front, rear, and right side perimter walls with woodrock insulation. add 5/8 anchor bolts with simpson set xp epoxy every 4 ft with 7" embedment to left, rear and 20 ft of right wall, add 1/2" osb struct 1 to left, rear and 10 ft of right side wall. 10d common at 6" e.n, 12" field. | $28,000 |
| Nov 14, 2017 | Completed final sign-off Jan 2018 | 929 Fell St | revision to permit #2017-0830-6459; #2017-0830-6461. rear and front foundation revision, new furring wall at front facade. n/a ordinance #155-13Details
revision to permit #2017-0830-6459; #2017-0830-6461. rear and front foundation revision, new furring wall at front facade. n/a ordinance #155-13 | |
| Nov 14, 2017 | Completed final sign-off Jan 2018 | 925 Fell St | revision to permit #2017-0830-6459; #2017-0830-6461. rear and front foundation revision, new furring wall at front facade. n/a ordinance #155-13Details
revision to permit #2017-0830-6459; #2017-0830-6461. rear and front foundation revision, new furring wall at front facade. n/a ordinance #155-13 | |
| Aug 30, 2017 | Completed final sign-off Jan 2018 | 929 Fell St | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 | $42,000 |
| Jul 21, 2017 | Completed final sign-off Jul 2017 | 159 Monterey Bl | voluntary strengthening , add 5/8 anchor bolts every 4 ft with 7" embedment with epoxy.add 4d linear ft of osb struct 1, plywood, add 6" sos screw at top plate & rim joist where plywood is installed.Details
voluntary strengthening , add 5/8 anchor bolts every 4 ft with 7" embedment with epoxy.add 4d linear ft of osb struct 1, plywood, add 6" sos screw at top plate & rim joist where plywood is installed. | $10,200 |
| Mar 10, 2017 | Never finaled issued Mar 2017, no final | 203 Holly Park Cr | remove panel board in family room. add r-13 insulation and 5/8 drywall. change door to pocket door to (e) bathroom. replace door to garage and door to deck. not visible from street.Details
remove panel board in family room. add r-13 insulation and 5/8 drywall. change door to pocket door to (e) bathroom. replace door to garage and door to deck. not visible from street. | $10,000 |
| Sep 14, 2016 | Completed final sign-off Oct 2016 | 203 Holly Park Cr | replace dryrot to rear decks & stairs not more than 50%, replace in-kindDetails
replace dryrot to rear decks & stairs not more than 50%, replace in-kind | $5,000 |
| Jul 26, 2016 | Completed final sign-off Aug 2016 | 203 Holly Park Cr | brace & bolt existing foundation, add 5/8 anchor bolts (every 4' with epoxy 7" embedment use simpson uf plates where necessary. add 1/2" struct 1 osb to rear crawl space. use either a35's or 1/4" sds screws to secure top plate to rim joist every 24", all work voltunary.Details
brace & bolt existing foundation, add 5/8 anchor bolts (every 4' with epoxy 7" embedment use simpson uf plates where necessary. add 1/2" struct 1 osb to rear crawl space. use either a35's or 1/4" sds screws to secure top plate to rim joist every 24", all work voltunary. | $12,995 |
| May 18, 2016 | Completed final sign-off Feb 2017 | 952 Minnesota St | voluntary strenthening of first level and new foundation.new skylight at lightwell. new storage at 1st floor.Details
voluntary strenthening of first level and new foundation.new skylight at lightwell. new storage at 1st floor. | $128,000 |
| Mar 14, 2016 | Completed final sign-off Mar 2016 | 176 Duncan St | add new 5/8 anchor boldts 7" embedment with epoxy every 4 ft. to open walls in garage on breeze way alleyDetails
add new 5/8 anchor boldts 7" embedment with epoxy every 4 ft. to open walls in garage on breeze way alley | $4,600 |
| Nov 6, 2015 | Completed final sign-off Jan 2016 | 3700 Ocean Av | dry rot repairDetails
dry rot repair | $8,900 |
| Nov 2, 2015 | Completed final sign-off Nov 2015 | 1446 15th Av | brace and bolt - 5/8 anchor bolts embeded 7" with epoxy every 4 ft. - 1/2" osb plywood struct #1 50 50 lf. all work in garageDetails
brace and bolt - 5/8 anchor bolts embeded 7" with epoxy every 4 ft. - 1/2" osb plywood struct #1 50 50 lf. all work in garage | $3,500 |
| Oct 14, 2015 | Completed final sign-off Nov 2016 | 952 Minnesota St | kitchen and bathroom remodel. no change in floor plan. all cosmetic changes. replace dry rot floor joist. no change on walls.Details
kitchen and bathroom remodel. no change in floor plan. all cosmetic changes. replace dry rot floor joist. no change on walls. | $20,000 |
| Sep 18, 2015 | Completed final sign-off Oct 2015 | 259 Noe St | brace and bolt perimeter walls per prescriptive measures. 5/8' threaded rod at 4' with 7" embedment. 1/2" osb struct 1 plywood bracing, use expoxy to anchor.Details
brace and bolt perimeter walls per prescriptive measures. 5/8' threaded rod at 4' with 7" embedment. 1/2" osb struct 1 plywood bracing, use expoxy to anchor. | $19,450 |
| Jul 10, 2015 | Completed final sign-off Jul 2015 | 715 45th Av | add 5/8 anchor bolts at 4 fl with expoxy 7" at east side of house, add plywood struct 1 osp to south east wall of house. voluntary strenghtheningDetails
add 5/8 anchor bolts at 4 fl with expoxy 7" at east side of house, add plywood struct 1 osp to south east wall of house. voluntary strenghthening | $6,150 |
| May 11, 2015 | Completed final sign-off Jun 2015 | 343 21st Av | revision to pa 2015 0225 9245 - alternative detail for shearwall footing & holddown footingDetails
revision to pa 2015 0225 9245 - alternative detail for shearwall footing & holddown footing | $1,200 |
| Apr 14, 2015 | Completed final sign-off Oct 2015 | 343 26th Av | install 3 steel moment frames at 1st floor garage for soft storey seismic retrofit in accordance with sf mandatory soft storey program per sfbc chapter 34b; 2012 iebc appendix a-4.Details
install 3 steel moment frames at 1st floor garage for soft storey seismic retrofit in accordance with sf mandatory soft storey program per sfbc chapter 34b; 2012 iebc appendix a-4. | $50,000 |
| Apr 9, 2015 | Never finaled issued Apr 2015, no final | 714 Vienna St | this permit is for work to be performed in general conformance with california existing building code, appendix, chapter a3 (s.f.b.c. ab-108)5/8"x10" @4'0" o.c. with tp-500 epoxyDetails
this permit is for work to be performed in general conformance with california existing building code, appendix, chapter a3 (s.f.b.c. ab-108)5/8"x10" @4'0" o.c. with tp-500 epoxy | $2,950 |
| Apr 9, 2015 | Completed final sign-off Jun 2015 | 154 Ney St | this permit is for work to be performed in general conformance with california existing building code, appendix, chapter a3 (s.f.b.c. ab-108) 5/8" x 10" @ 4'0" o.c. with tp-500 epoxy.Details
this permit is for work to be performed in general conformance with california existing building code, appendix, chapter a3 (s.f.b.c. ab-108) 5/8" x 10" @ 4'0" o.c. with tp-500 epoxy. | $5,062 |
| Apr 7, 2015 | Completed final sign-off Jun 2015 | 3700 Ocean Av | brace & bolt down walls to (e) foundation per prescriptive measures using simpson titen anchors 5/8-8' every 4ft install plywood bracing per required. this work performed in general conformance with ca existing building code, appendix chpt a3 sfbc ab 108Details
brace & bolt down walls to (e) foundation per prescriptive measures using simpson titen anchors 5/8-8' every 4ft install plywood bracing per required. this work performed in general conformance with ca existing building code, appendix chpt a3 sfbc ab 108 | $7,500 |
| Apr 7, 2015 | Never finaled issued Apr 2015, no final | 20 Edgar Av | brace & bolt to (e) foundation for precriptive measures titen anchor 5/8-8" universal connectors plywood bracing every 4ft. this work performed in general conformance with ca existing building code, appendix chpt a3 sfbc ab 108 5/8 x 10'@ 4" oc w tp 500 epoxyDetails
brace & bolt to (e) foundation for precriptive measures titen anchor 5/8-8" universal connectors plywood bracing every 4ft. this work performed in general conformance with ca existing building code, appendix chpt a3 sfbc ab 108 5/8 x 10'@ 4" oc w tp 500 epoxy | $3,700 |
| Feb 25, 2015 | Completed final sign-off Jun 2015 | 343 21st Av | soft story seismic stregthening. new shearwall and anchors at perimeter and transverse walls. 2 new momentframes . 4 new grade beams. 2012 iebc appendix a-4Details
soft story seismic stregthening. new shearwall and anchors at perimeter and transverse walls. 2 new momentframes . 4 new grade beams. 2012 iebc appendix a-4 | $60,200 |
| Nov 19, 2014 | Completed final sign-off Dec 2014 | 379 Winding Wy | brace & bolt garage walls; add 5/8" anchor bolts every 4 feet; hd2 to corners; add 1/2" struct #1 to exposed framing @ garage.Details
brace & bolt garage walls; add 5/8" anchor bolts every 4 feet; hd2 to corners; add 1/2" struct #1 to exposed framing @ garage. | $7,600 |
| Sep 22, 2014 | Completed final sign-off Jan 2015 | 1310 Greenwich St | soft story retrofit. 2012 iebc appendix a-4. n/a for the maher ordinance #155-13Details
soft story retrofit. 2012 iebc appendix a-4. n/a for the maher ordinance #155-13 | $40,000 |
| Dec 9, 2013 | Completed final sign-off Jun 2014 | 626 03rd Av | replace dryrot damage to roof framing and sheathing, wall studs, floor framing and subfloor. replace all mildewed gyp board. all work at cottage at rearDetails
replace dryrot damage to roof framing and sheathing, wall studs, floor framing and subfloor. replace all mildewed gyp board. all work at cottage at rear | $4,500 |
| Apr 25, 2007 | Expired or cancelled expired Dec 2007 | 370 Maynard St | one kitchen remodel, new beam, post and footingDetails
one kitchen remodel, new beam, post and footing | $15,000 |
| Apr 4, 2007 | Completed final sign-off Apr 2008 | 26 25th Av | demolish a 1 story garage building.Details
demolish a 1 story garage building. |