Samjin General Supply Inc
- Based in
- Oakland
- On San Francisco permits
- May 2008 to Jan 2009
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 9, 2009 | Completed final sign-off Apr 2009 | 935 Broderick St | job location: (unit 935) 935 broderick street only: new installation of toilets in existing bathroom:replacement of kitchen cabinets and new countertop:new receptacles in corridor,foyer, living room and back bedroom:removal of existing toilet. relocate light fixture in a bathroom. 1st flr.Details
job location: (unit 935) 935 broderick street only: new installation of toilets in existing bathroom:replacement of kitchen cabinets and new countertop:new receptacles in corridor,foyer, living room and back bedroom:removal of existing toilet. relocate light fixture in a bathroom. 1st flr. | $20,000 |
| May 30, 2008 | Completed final sign-off Sep 2008 | 825 Scott St | replace (e) column (rotten) with new. at entry porticos between driveway, 3 column total. all work to be done in kind.Details
replace (e) column (rotten) with new. at entry porticos between driveway, 3 column total. all work to be done in kind. | $6,000 |
| May 13, 2008 | Completed final sign-off Sep 2008 | 825 Scott St | comply with phhysical inspection 3r-4752.Details
comply with phhysical inspection 3r-4752. | $3,000 |