Salvador Escamilla
- Based in
- San Pablo
- On San Francisco permits
- Mar 2008 to Aug 2009
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2009 | Completed final sign-off Aug 2009 | 1730 Broderick St | interior remodel to unit #11 on 4th fl incl. non structural wall removalDetails
interior remodel to unit #11 on 4th fl incl. non structural wall removal | $5,000 |
| Mar 28, 2008 | Completed final sign-off Mar 2008 | 80 Santa Ynez Av | repair six rottened deck joist, 6' length, repair rotten siding along deck parameter, less than 50% repair of deck.Details
repair six rottened deck joist, 6' length, repair rotten siding along deck parameter, less than 50% repair of deck. | $1,200 |