Sac Wireless
- Based in
- Chicago
- On San Francisco permits
- Jan 2019 to Feb 2020
- Last 24 months
- 0 permits filed
4 permits since 2000: 1 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 12, 2020 | Expired or cancelled withdrawn Dec 2020 | 66 08th St | modification to existing at&t telecommunications facility on pg&e substation. remove and replace (6) antennas and (3) remote radio units (rrus). install (3) rrus. install (4) baseband units in new hybrid equipment rack within existing equipment area.Details
modification to existing at&t telecommunications facility on pg&e substation. remove and replace (6) antennas and (3) remote radio units (rrus). install (3) rrus. install (4) baseband units in new hybrid equipment rack within existing equipment area. | $25,000 |
| May 30, 2019 | Never finaled issued Sep 2020, no final | 801 Jones St | t mobile modification to replace 3 antennas with new and install 3 rrusDetails
t mobile modification to replace 3 antennas with new and install 3 rrus | $25,000 |
| Apr 24, 2019 | Never finaled issued Jan 2020, no final | 81 09th St | replace 3 antennas w/ 3 antennas, replace 3 rrus with 9 rrus, install 1 elter radio cabinet on (p) equipment pad, 1 elter battery cabineton (p) pad, 1 elter 1-cabent on (p) pad, install (1) 100a ppc cabinet on (p) h-frame, install (p) 30" dia faux vent for sector "3" only install diplexorsDetails
replace 3 antennas w/ 3 antennas, replace 3 rrus with 9 rrus, install 1 elter radio cabinet on (p) equipment pad, 1 elter battery cabineton (p) pad, 1 elter 1-cabent on (p) pad, install (1) 100a ppc cabinet on (p) h-frame, install (p) 30" dia faux vent for sector "3" only install diplexors | $20,000 |
| Jan 15, 2019 | Completed final sign-off Jan 2021 | 2270 Folsom St | at&t - swap 3 antennas, remove 6 tma's, install 8 radios, add equipment to shelter.Details
at&t - swap 3 antennas, remove 6 tma's, install 8 radios, add equipment to shelter. | $25,000 |