Sabri Abdelkhaliqu Zidan
- Based in
- Petaluma
- On San Francisco permits
- Aug 2009 to Feb 2026
- Last 24 months
- 3 permits filed
10 permits since 2000: 7 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 27, 2026 | In progress issued Feb 2026 | 271 Hartford St | 271 hartford: kitchen and bathroom remodel, new subpanel. no removal of walls 273 hartford: demo existing wall to accomodate new electrical system as needed. refinish hardwood flrs, new drywall for kitchen.Details
271 hartford: kitchen and bathroom remodel, new subpanel. no removal of walls 273 hartford: demo existing wall to accomodate new electrical system as needed. refinish hardwood flrs, new drywall for kitchen. | $85,000 |
| Feb 6, 2026 | Completed final sign-off Apr 2026 | 180 Lily St | in kind kitchen remodel, including selective demo of existing finishes. no structural work proposed include electrical and plumbing work. install new kitchen cabinets, countertop, new fixtures, new floor finish, painting. all in kind. approx. 150 sq ft.Details
in kind kitchen remodel, including selective demo of existing finishes. no structural work proposed include electrical and plumbing work. install new kitchen cabinets, countertop, new fixtures, new floor finish, painting. all in kind. approx. 150 sq ft. | $36,000 |
| Feb 4, 2026 | Completed final sign-off May 2026 | 1338 Masonic Av | kitchen remodel to include selective demo of (e) finishes, no structural work, layout change or wall removal. mep instll (n) kitchen cabinets, countertops, fixtures, hardwood floor, and painting. no wall removed or layout changes in kind. like for like.Details
kitchen remodel to include selective demo of (e) finishes, no structural work, layout change or wall removal. mep instll (n) kitchen cabinets, countertops, fixtures, hardwood floor, and painting. no wall removed or layout changes in kind. like for like. | $80,000 |
| Jun 13, 2024 | Completed final sign-off Jul 2024 | 36 Ashton Av | replace damaged dry wall due to water leak. insulate exposed walls with r-15 insulation. install 5/8" drywall in the bedroom partially damaged. work in 3 bedroomsDetails
replace damaged dry wall due to water leak. insulate exposed walls with r-15 insulation. install 5/8" drywall in the bedroom partially damaged. work in 3 bedrooms | $6,000 |
| Feb 22, 2023 | Completed final sign-off Mar 2023 | 58 Harper St | exterior siding repairs approximately 70 s f due to water leak.Details
exterior siding repairs approximately 70 s f due to water leak. | $7,400 |
| Apr 6, 2022 | Never finaled issued Apr 2022, no final | 111 Chestnut St | unit #812: kitchen remodel. replace cabinets and appliances. no structural changes. approx. 7'x12'.Details
unit #812: kitchen remodel. replace cabinets and appliances. no structural changes. approx. 7'x12'. | $34,000 |
| Dec 17, 2019 | Completed final sign-off Dec 2019 | 201 Arkansas St | dryrot repair, tile work, sheet rock, paint, minor electrical correction. repair floor in both bathrooms. also plumbing correction. just repair to pa# 2019-1028-5728. no change to layoutDetails
dryrot repair, tile work, sheet rock, paint, minor electrical correction. repair floor in both bathrooms. also plumbing correction. just repair to pa# 2019-1028-5728. no change to layout | $25,000 |
| Oct 28, 2019 | Completed final sign-off Dec 2019 | 201 Arkansas St | dryrot repair in 2 bathrooms along north wall bathrooms including dyrwall repairs and replacement of tiles. replace shower valvesDetails
dryrot repair in 2 bathrooms along north wall bathrooms including dyrwall repairs and replacement of tiles. replace shower valves | $7,500 |
| Jun 19, 2013 | Never finaled issued Jun 2013, no final | 299 Corbett Av | dbi notice of violation/complaint 2013008821: inspect for general life safety original nov requires permanent heating. provide heating system to apt.#299aDetails
dbi notice of violation/complaint 2013008821: inspect for general life safety original nov requires permanent heating. provide heating system to apt.#299a | $2,800 |
| Aug 31, 2009 | Completed final sign-off Sep 2009 | 73 High St | remove existing shingles with new ones, seal & paint. 180 sf. replacement in kind.Details
remove existing shingles with new ones, seal & paint. 180 sf. replacement in kind. | $5,000 |