Sablosky Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2014 to Jun 2018
- Last 24 months
- 0 permits filed
10 permits since 2000: 8 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 22, 2018 | Completed final sign-off Apr 2019 | 170 Staples Av | to obtain final inspection for work approved under pa #201604275848. all work is complete.Details
to obtain final inspection for work approved under pa #201604275848. all work is complete. | |
| Feb 27, 2018 | Completed final sign-off May 2018 | 114 Coleridge St | repair existing front entry stairs and attached shed in kindDetails
repair existing front entry stairs and attached shed in kind | $7,000 |
| Nov 14, 2017 | Completed final sign-off Dec 2017 | 61 Fair Av | rebuild (e) wood front entry stairs in-kind (exterior)Details
rebuild (e) wood front entry stairs in-kind (exterior) | $6,000 |
| Aug 23, 2017 | Completed final sign-off Nov 2017 | 3531 Vicente St | rebuild stairs from 1st to 2nd fl, in kind.Details
rebuild stairs from 1st to 2nd fl, in kind. | $3,000 |
| Aug 18, 2017 | Completed final sign-off Nov 2017 | 3531 Vicente St | to obtain final inspection for work approved under pa#2014-10-10-8680. all work is completeDetails
to obtain final inspection for work approved under pa#2014-10-10-8680. all work is complete | |
| Feb 10, 2017 | Completed final sign-off Jul 2017 | 157 Day St | this project involves the renovation of an single unit on the top level of a 2 unit building. the work is within the envelope and includes converting an (e) bedroom with an adjoining sunroom into two bedrooms. the work includes new windows and electricalDetails
this project involves the renovation of an single unit on the top level of a 2 unit building. the work is within the envelope and includes converting an (e) bedroom with an adjoining sunroom into two bedrooms. the work includes new windows and electrical | $15,000 |
| Apr 27, 2016 | Expired or cancelled expired Apr 2019 | 170 Staples Av | demolish existing fireplace, relocate kitchen cabinet & sink. repair of (e) drains in bath. relocate 2 interior doors. replace (e) back door and 2 windows. replace hardwood floor. close in existing window.Details
demolish existing fireplace, relocate kitchen cabinet & sink. repair of (e) drains in bath. relocate 2 interior doors. replace (e) back door and 2 windows. replace hardwood floor. close in existing window. | $35,000 |
| Sep 25, 2015 | Completed final sign-off Feb 2016 | 130 Miraloma Dr | replace countertops. new sink and range hood, 1/2 bathDetails
replace countertops. new sink and range hood, 1/2 bath | $10,000 |
| May 20, 2015 | Completed final sign-off Oct 2015 | 1599 Tennessee St | install 1 accessible unisex restroom. install pertinent fixtures & elect. barrier removal. maher naDetails
install 1 accessible unisex restroom. install pertinent fixtures & elect. barrier removal. maher na | $10,000 |
| Oct 10, 2014 | Expired or cancelled expired Nov 2017 | 3531 Vicente St | remove sheetrock, 1 wall & ceiling. provice r-13 wall r-19 ceiling insulation recover with "quiet rock" type x 5/8" remove carpet and install hardwood flooringDetails
remove sheetrock, 1 wall & ceiling. provice r-13 wall r-19 ceiling insulation recover with "quiet rock" type x 5/8" remove carpet and install hardwood flooring | $4,000 |