S V Builders
- Based in
- Oakland
- On San Francisco permits
- Apr 2009 to Jan 2017
- Last 24 months
- 0 permits filed
19 permits since 2000: 11 completed, 7 never finaled, 1 expired or cancelled.
Of the 7 never-finaled permits, 1 is 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 6, 2017 | Never finaled issued Jan 2017, no final | 811 Treat Av | repair and replace dryrot damaged siding on east and south wall. approx 1000 sq ft. not visible from street.Details
repair and replace dryrot damaged siding on east and south wall. approx 1000 sq ft. not visible from street. | $2,200 |
| Jul 29, 2016 | Never finaled issued Jul 2016, no final | 237 Sanchez St | bathroom remodel in-kind; no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)5.Details
bathroom remodel in-kind; no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)5. | $10,000 |
| Jul 11, 2016 | Never finaled issued Jul 2016, no final | 237 Sanchez St | exploratory demo @ basement, approx 1'x10' to expose (e) condition, repair & patch in kind after. n/a ordinance #155-13Details
exploratory demo @ basement, approx 1'x10' to expose (e) condition, repair & patch in kind after. n/a ordinance #155-13 | $500 |
| Jan 21, 2016 | Expired or cancelled expired Oct 2021 | 140 College Av | demo 2 plumbing fixtures, for future addition and exploration for structural drawings and 100 s.f. of walls and drywall and chip away at 5 locations to determinesizeDetails
demo 2 plumbing fixtures, for future addition and exploration for structural drawings and 100 s.f. of walls and drywall and chip away at 5 locations to determinesize | $2,000 |
| May 28, 2015 | Completed final sign-off Sep 2018 | 811 Treat Av | conversion (e) storage shed at rear to living space to accomodate the addition of 2 additional units(7 total). exterior modifications to (e) buildings. addition (n) roof deck at rear bldg. horizontal additon to rear of 2 car garage to accomadate bicycle parking. n/a for maher ordinance no.155-13.Details
conversion (e) storage shed at rear to living space to accomodate the addition of 2 additional units(7 total). exterior modifications to (e) buildings. addition (n) roof deck at rear bldg. horizontal additon to rear of 2 car garage to accomadate bicycle parking. n/a for maher ordinance no.155-13. | $250,000 |
| Mar 3, 2015 | Never finaled issued Mar 2015, no final | 1564 Church St | new cabinets, rearragne laundry room, remodel bath, 3 windows - like for like. one new window at top floor rear within new 8' x 8' dormer.Details
new cabinets, rearragne laundry room, remodel bath, 3 windows - like for like. one new window at top floor rear within new 8' x 8' dormer. | $30,000 |
| Dec 10, 2014 | Completed final sign-off Dec 2015 | 91 Cameo Wy | revision to appl #2014.0523.6680 - enclose 150 sf ground floor courtyard for (n) living space. convert 73 sf of garage to living space. addition of bath & laindry at living space adjacent to garageDetails
revision to appl #2014.0523.6680 - enclose 150 sf ground floor courtyard for (n) living space. convert 73 sf of garage to living space. addition of bath & laindry at living space adjacent to garage | $20,000 |
| Aug 25, 2014 | Completed final sign-off Sep 2014 | 515 20th Av | stucco @ front of house and windows @ 5 windows & door front of house, approx 800 sq.ft.Details
stucco @ front of house and windows @ 5 windows & door front of house, approx 800 sq.ft. | $1,000 |
| Dec 23, 2013 | Completed final sign-off Sep 2014 | 738 26th Av | total interior remodel and alateration. 1) add 2 bedrooms and 2 bathroom. 2)remodel and relocate kitchen. 3)new windows and doors 4)install new laundry room.5)raise int. ceiling at living and dining room.Details
total interior remodel and alateration. 1) add 2 bedrooms and 2 bathroom. 2)remodel and relocate kitchen. 3)new windows and doors 4)install new laundry room.5)raise int. ceiling at living and dining room. | $80,000 |
| Dec 16, 2013 | Completed final sign-off Dec 2015 | 114 Rousseau St | remove and rebuild existing delapidated shed structure, deck and stairs at rear of house, new addition will house media rm and bath on 1/f and playrm, laundry and bath on 2/f. add dormer to 3/f and convert attic space to living areaDetails
remove and rebuild existing delapidated shed structure, deck and stairs at rear of house, new addition will house media rm and bath on 1/f and playrm, laundry and bath on 2/f. add dormer to 3/f and convert attic space to living area | $120,000 |
| Nov 7, 2013 | Completed final sign-off Sep 2014 | 738 26th Av | demolition interior walls and ceilings for exploratory purposes only.Details
demolition interior walls and ceilings for exploratory purposes only. | $1,000 |
| Sep 26, 2013 | Completed final sign-off Nov 2013 | 1919 San Jose Av | revision to pa# 201306149546 & pa# 201308235108. eliminate 1st floor full bath and 2nd floor deck & rear stair.Details
revision to pa# 201306149546 & pa# 201308235108. eliminate 1st floor full bath and 2nd floor deck & rear stair. | |
| Aug 23, 2013 | Completed final sign-off Nov 2013 | 1919 San Jose Av | rev. pa#201306149546- provide roof framing, infill light well, replace footing, slab on grade.Details
rev. pa#201306149546- provide roof framing, infill light well, replace footing, slab on grade. | |
| May 24, 2013 | Completed final sign-off Sep 2014 | 515 20th Av | 1st fl: lower slab by 1'. add family rm and full bath. 2nd fl relocate kitchen add 1/2 bath. remodel living rm,dining rm. 3rd fl: convert 2 bedrooms/1 bath,den to 3 bedrooms, 3 baths. remove entire house plaster/lath and replace with 5/8" type x gyp boardDetails
1st fl: lower slab by 1'. add family rm and full bath. 2nd fl relocate kitchen add 1/2 bath. remodel living rm,dining rm. 3rd fl: convert 2 bedrooms/1 bath,den to 3 bedrooms, 3 baths. remove entire house plaster/lath and replace with 5/8" type x gyp board | $150,000 |
| Apr 9, 2013 | Completed final sign-off Oct 2021 | 140 College Av | demo existing back dining room and adding 783 sq ft to the existing upstair and downstair bedrooms & bathrooms. deck will be added upstairs covering downstairs addition. addition of 2 bathrooms & 2 bedrooms downstairs, extending kitchen/living room/dining room upstairs.Details
demo existing back dining room and adding 783 sq ft to the existing upstair and downstair bedrooms & bathrooms. deck will be added upstairs covering downstairs addition. addition of 2 bathrooms & 2 bedrooms downstairs, extending kitchen/living room/dining room upstairs. | $250,000 |
| Aug 12, 2011 | Never finaled issued Sep 2011, no final | 238 Eddy St | replacement of an existingDetails
replacement of an existing | $120,000 |
| Nov 9, 2009 | Never finaled issued Mar 2010, no final | 1656 15th St | bolts plus retrofit project at masonry buildingDetails
bolts plus retrofit project at masonry building | $26,700 |
| Sep 1, 2009 | Never finaled issued Sep 2009, no final | 1275 Mission St | structural slab @ sidewalk. remove (e) metal access door & replace w/ concrete.Details
structural slab @ sidewalk. remove (e) metal access door & replace w/ concrete. | $5,000 |
| Apr 13, 2009 | Completed final sign-off Feb 2010 | 124 Turk St | renovation to comply with housign complaint #200866873/his - renovate (e) wc room to be new trash room @ floors 2 to 6.Details
renovation to comply with housign complaint #200866873/his - renovate (e) wc room to be new trash room @ floors 2 to 6. | $55,400 |