Jul 2023 to Jul 2023
Last 24 months
0 permits filed

1 permit since 2000: 1 never finaled.

Of the 1 never-finaled permit, 1 is 3 to 5 years old. 1 was filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Jul 27, 2023Never finaled
filed Jul 2023, never issued
1601 19th Avinstall new 125kw diesel generator. replace existing 600a automatic transfer switch. as an optional standyby system.
Details
Permit
202307273177
Status
filed
Filed
Jul 27, 2023
Declared cost
$117,000
Address
1601 19th Av

install new 125kw diesel generator. replace existing 600a automatic transfer switch. as an optional standyby system.