S P Builder
- Based in
- Belmont
- On San Francisco permits
- Apr 2018 to Feb 2024
- Last 24 months
- 0 permits filed
12 permits since 2000: 8 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 12, 2024 | Completed final sign-off Sep 2024 | 553 Arkansas St | update rear landscape, new gas fire pit, new arbor with electrical heaters and lightingDetails
update rear landscape, new gas fire pit, new arbor with electrical heaters and lighting | $20,000 |
| Jan 9, 2024 | Completed final sign-off Sep 2024 | 553 Arkansas St | update bathroom like for like with relocation of 3 switches and 1 outlet. new finishes throughout.Details
update bathroom like for like with relocation of 3 switches and 1 outlet. new finishes throughout. | $45,000 |
| Jun 30, 2023 | Never finaled issued Jul 2023, no final | 182 32nd Av | 2/f: reconfigure (e) bedroom 2 to including a new bathroom and 2 closets. update electrical and lighting in both bathrooms. remodel (e) bathroom 1 at 2nd floor.Details
2/f: reconfigure (e) bedroom 2 to including a new bathroom and 2 closets. update electrical and lighting in both bathrooms. remodel (e) bathroom 1 at 2nd floor. | $60,000 |
| Sep 14, 2022 | Expired or cancelled cancelled Jan 2026 | 66 Yerba Buena Av | full gut remodel upgrade (e) , plumbing + radiant 3 bathrooms, kitchen, 1 new window, electrical updating 3 new floors throughout and demo (e) brick fireplace chimney.Details
full gut remodel upgrade (e) , plumbing + radiant 3 bathrooms, kitchen, 1 new window, electrical updating 3 new floors throughout and demo (e) brick fireplace chimney. | $650,000 |
| Nov 9, 2021 | Completed final sign-off Apr 2023 | 539 Athens St | revision to permit 202102235198. new half bath at 1st floor. 1 new skylight and new deck at rear.Details
revision to permit 202102235198. new half bath at 1st floor. 1 new skylight and new deck at rear. | $25,000 |
| Mar 24, 2021 | Completed final sign-off Feb 2024 | 98 Sotelo Av | revision to app#201912190018: the approved deck design is now supported with a retaining wall and spread footings instead of piers. no change to size or location of deck. revision is purely structural.Details
revision to app#201912190018: the approved deck design is now supported with a retaining wall and spread footings instead of piers. no change to size or location of deck. revision is purely structural. | $6,000 |
| Feb 23, 2021 | Completed final sign-off Apr 2023 | 539 Athens St | 2nd fl: remodel kitchen, bedroom, and 2 full baths, bedroom. remove interior staircase.Details
2nd fl: remodel kitchen, bedroom, and 2 full baths, bedroom. remove interior staircase. | $45,000 |
| Mar 5, 2020 | Never finaled issued Mar 2020, no final | 760 Haight St | remove and replace wood siding,insulate and waterproof front of house. in referance to app#202001242745Details
remove and replace wood siding,insulate and waterproof front of house. in referance to app#202001242745 | $20,000 |
| Jan 24, 2020 | Never finaled issued Jan 2020, no final | 760 Haight St | replace windows (15) visible from row in kind wood double hung. all street facing. max u-factor 0.32 or better.Details
replace windows (15) visible from row in kind wood double hung. all street facing. max u-factor 0.32 or better. | $30,000 |
| Dec 19, 2019 | Completed final sign-off Feb 2024 | 98 Sotelo Av | remodel basement, remodel bathroom on 3rd fl. include bathroom, bedroom & wet bar, move laundry to 2nd fl. new deck at rear yard above grade, add 2 new patio doors and new windows, replace window sashes in kind w wood frame windowsDetails
remodel basement, remodel bathroom on 3rd fl. include bathroom, bedroom & wet bar, move laundry to 2nd fl. new deck at rear yard above grade, add 2 new patio doors and new windows, replace window sashes in kind w wood frame windows | $50,000 |
| Nov 20, 2019 | Completed final sign-off Oct 2022 | 107 Upper Tr | infill lightwell. replace front windows in-kind, garage door, and gate. install strong wallsDetails
infill lightwell. replace front windows in-kind, garage door, and gate. install strong walls | $50,000 |
| Apr 16, 2018 | Completed final sign-off Jun 2018 | 160 Julian Av | condo conversion - replace 9 windows with full wood sashes with integrated ogee lugs. replacement limited to existing openings. 9 double hung window with one awning window.Details
condo conversion - replace 9 windows with full wood sashes with integrated ogee lugs. replacement limited to existing openings. 9 double hung window with one awning window. | $12,000 |