S & H Renovations
- Based in
- Redwood City
- On San Francisco permits
- Mar 2015 to May 2025
- Last 24 months
- 1 permit filed
48 permits since 2000: 38 completed, 1 in progress, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 6 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 19, 2025 | In progress issued Oct 2025 | 1 Steuart Ln | installation of lobby door operator.Details
installation of lobby door operator. | $25,000 |
| Dec 5, 2023 | Completed final sign-off Mar 2024 | 2217 Fillmore St | apt 2 on 3/f: revision to pa# 202303234309. renovate kitchen, relocate bathroom and laundry, relocate bedroom. new finishes and fixtures. no exterior changes, hvac work deferred submittal. non structural work.Details
apt 2 on 3/f: revision to pa# 202303234309. renovate kitchen, relocate bathroom and laundry, relocate bedroom. new finishes and fixtures. no exterior changes, hvac work deferred submittal. non structural work. | |
| Mar 31, 2023 | Completed final sign-off Dec 2024 | 65 Heather Av | to comply with nov 202301641 legalize home office on ground floor. verify existing partitions, new lighting, removal of 1 sink; closure of existing drain and addition of wall heater in (n) home office. 3-5-24- replace window in kind in office roomDetails
to comply with nov 202301641 legalize home office on ground floor. verify existing partitions, new lighting, removal of 1 sink; closure of existing drain and addition of wall heater in (n) home office. 3-5-24- replace window in kind in office room | $5,000 |
| Mar 23, 2023 | Completed final sign-off Mar 2024 | 2217 Fillmore St | apt 2: apt renovation - renovate kitchen, 2 bathrooms, structural work, replace 1 (e) lightwell window, new lighting, no exterior changes. no changes to mech. window not visible from streetDetails
apt 2: apt renovation - renovate kitchen, 2 bathrooms, structural work, replace 1 (e) lightwell window, new lighting, no exterior changes. no changes to mech. window not visible from street | $125,000 |
| Nov 16, 2022 | Completed final sign-off Dec 2022 | 3270 21st St | unit #301-a: paint and flooring. bathroom remodel like for like.Details
unit #301-a: paint and flooring. bathroom remodel like for like. | $10,000 |
| Nov 1, 2022 | Completed final sign-off Nov 2022 | 1338 Stevenson St | work @ unit# 1338-b only: kitchen remodel. no change to walls.Details
work @ unit# 1338-b only: kitchen remodel. no change to walls. | $20,000 |
| Mar 14, 2022 | Completed final sign-off Apr 2022 | 736 Leavenworth St | unit #7: kitchen remodel and new flooring. replace existing cabinets with new cabinets.Details
unit #7: kitchen remodel and new flooring. replace existing cabinets with new cabinets. | $20,000 |
| Mar 3, 2022 | Expired or cancelled cancelled Jan 2026 | 1900 Market St | rev to pa201907176173. change door swing only from outward to inward.Details
rev to pa201907176173. change door swing only from outward to inward. | |
| May 5, 2021 | Completed final sign-off Sep 2021 | 756 Page St | removal and replacement of existing fixtures and finishes, flooring, cabinets and paint. kitchen remodel. unit 6.Details
removal and replacement of existing fixtures and finishes, flooring, cabinets and paint. kitchen remodel. unit 6. | $27,000 |
| Oct 28, 2020 | Completed final sign-off Dec 2020 | 730 Guerrero St | remodel (e) bathroom like for likeDetails
remodel (e) bathroom like for like | $10,000 |
| Jul 29, 2020 | Expired or cancelled cancelled Jan 2026 | 15 Hermann St | #205, 306, 503, 507, 510, 602, 607, 610: replacing fixtures, appliances, accessories, and finishes in 8 apartment units. fixtures to be replaced are bathroom toilet & sink, kitchen sink & faucet, light fixtures. bathrooms approx 6'x7' each. kitchens approx 8'x10' each. all work in kind.Details
#205, 306, 503, 507, 510, 602, 607, 610: replacing fixtures, appliances, accessories, and finishes in 8 apartment units. fixtures to be replaced are bathroom toilet & sink, kitchen sink & faucet, light fixtures. bathrooms approx 6'x7' each. kitchens approx 8'x10' each. all work in kind. | $160,000 |
| May 29, 2020 | Completed final sign-off Jun 2020 | 2048 Taylor St | replace kitchen cabinets, refinish floors, paint. all work in-kindDetails
replace kitchen cabinets, refinish floors, paint. all work in-kind | $35,000 |
| Feb 13, 2020 | Never finaled issued Mar 2020, no final | 3967 22nd St | remove (e) bearing wall between kitchen & dining room.Details
remove (e) bearing wall between kitchen & dining room. | $15,000 |
| Jul 24, 2019 | Completed final sign-off Feb 2020 | 1920 Market St | interior renovation of commercial unit 1920 market st. provide "white-box" for future tenant. (n) accessible restroom w/signage, (n) power door operator, (n) ada push plates. (n) existing signage. no structural work. no change to mechanical. no work in units above. project to comply w/nov 201925844Details
interior renovation of commercial unit 1920 market st. provide "white-box" for future tenant. (n) accessible restroom w/signage, (n) power door operator, (n) ada push plates. (n) existing signage. no structural work. no change to mechanical. no work in units above. project to comply w/nov 201925844 | $25,000 |
| Jul 17, 2019 | Completed final sign-off Apr 2022 | 810 Eddy St | to comply with abe 51-16 program remove western entry door and atrittutide recessed storefront. large fixed glazing to remain provide new 36" wide door of property line. provide 5'x5' level landing on each side of new doorDetails
to comply with abe 51-16 program remove western entry door and atrittutide recessed storefront. large fixed glazing to remain provide new 36" wide door of property line. provide 5'x5' level landing on each side of new door | $10,000 |
| Jul 17, 2019 | Completed final sign-off Feb 2022 | 1400 California St | to comply with abe program construct a power door operator in lieu of level landing adjoin ext and int doors of (e) bld reqd to be made accessible to those with disabilities. automatic door to comply with ans.bhma a156319Details
to comply with abe program construct a power door operator in lieu of level landing adjoin ext and int doors of (e) bld reqd to be made accessible to those with disabilities. automatic door to comply with ans.bhma a156319 | $8,000 |
| Jul 17, 2019 | Completed final sign-off Oct 2022 | 1900 Market St | to comply w/ accessible business entrance program. construct a power door operator in lieu of level landings adjoining exterior and interior doors of (e) buildings required to be made accessbile for persons w/ disabilities. automatic doors to comply w/ ansi bhma a156.19Details
to comply w/ accessible business entrance program. construct a power door operator in lieu of level landings adjoining exterior and interior doors of (e) buildings required to be made accessbile for persons w/ disabilities. automatic doors to comply w/ ansi bhma a156.19 | $8,000 |
| Jul 17, 2019 | Completed final sign-off May 2023 | 16 Guerrero St | to comply with abe program sidewalk flags to create a clear and level landing on ext grade. install 10" continous bottom plate at door bottomDetails
to comply with abe program sidewalk flags to create a clear and level landing on ext grade. install 10" continous bottom plate at door bottom | $5,000 |
| Jul 17, 2019 | Completed final sign-off Oct 2022 | 516 Geary St | to comply with abe program construct a power door operator in lieu of level landing adjoin ext and int doors of (e) bld reqd to be made accessible to those with disabilities. automatic door to comply with ans.bhma a156319Details
to comply with abe program construct a power door operator in lieu of level landing adjoin ext and int doors of (e) bld reqd to be made accessible to those with disabilities. automatic door to comply with ans.bhma a156319 | $8,000 |
| Jul 17, 2019 | Completed final sign-off May 2023 | 28 Guerrero St | to comply with abe program replace sidewalk flags to create clear and level landing on ect side. install 10" continous plate at door bottomDetails
to comply with abe program replace sidewalk flags to create clear and level landing on ect side. install 10" continous plate at door bottom | $5,000 |
| Oct 16, 2018 | Completed final sign-off Jan 2019 | 1221 Jones St | unit 7f: replacing fixtures & finishes, 1 kitchen, 2 bathrooms, 1 powder room, paint, flooringDetails
unit 7f: replacing fixtures & finishes, 1 kitchen, 2 bathrooms, 1 powder room, paint, flooring | $48,000 |
| May 8, 2018 | Completed final sign-off Jun 2018 | 400 Page St | #206: revision to approved permit #2201803264641. rmeove requirement to modify sill of (e) in nested bedroom. maher ord 155-13 naDetails
#206: revision to approved permit #2201803264641. rmeove requirement to modify sill of (e) in nested bedroom. maher ord 155-13 na | |
| Mar 26, 2018 | Completed final sign-off Jun 2018 | 400 Page St | renovation of unit #206 on the 2nd floor including new bedroom, renovate kitchen and bath, new lighting. no exterior changes. n/a maherDetails
renovation of unit #206 on the 2nd floor including new bedroom, renovate kitchen and bath, new lighting. no exterior changes. n/a maher | $30,000 |
| Nov 28, 2017 | Completed final sign-off Apr 2018 | 400 Page St | renovation of unit 301 on the 3rd fl. addition of bedroom and laundry. renovate kitchen and bath, new lighting, no exterior changesDetails
renovation of unit 301 on the 3rd fl. addition of bedroom and laundry. renovate kitchen and bath, new lighting, no exterior changes | $45,000 |
| Nov 20, 2017 | Never finaled issued Jan 2018, no final | 400 Page St | renovation of apt #105 on 2nd flr. includes new bedroom, new laundry, renovate kitchen and bath, new lighting, revised heating. no exterior work. maher naDetails
renovation of apt #105 on 2nd flr. includes new bedroom, new laundry, renovate kitchen and bath, new lighting, revised heating. no exterior work. maher na | $30,000 |
| Sep 11, 2017 | Completed final sign-off Dec 2017 | 701 Fell St | renovation of apt 9 on 3rd fl, new bedroom, laundry, revovated kitchen and bath, new lighting. no exterior lightingDetails
renovation of apt 9 on 3rd fl, new bedroom, laundry, revovated kitchen and bath, new lighting. no exterior lighting | $30,000 |
| Aug 16, 2017 | Completed final sign-off Mar 2018 | 942 Hayes St | unit c: revision to pa #201704063360 - addition of new bedroom, and new bathroom. relocate front door. unit c is on the ground fl.Details
unit c: revision to pa #201704063360 - addition of new bedroom, and new bathroom. relocate front door. unit c is on the ground fl. | $30,000 |
| Jul 11, 2017 | Never finaled issued Jul 2017, no final | 942 Hayes St | revise 201704063360. change address from 940 to 942 hayes # cDetails
revise 201704063360. change address from 940 to 942 hayes # c | |
| Jun 28, 2017 | Completed final sign-off Jul 2017 | 942 Hayes St | administrative permit. revise permit #201702078861 change address to 942 hayes st #28.Details
administrative permit. revise permit #201702078861 change address to 942 hayes st #28. | |
| Apr 6, 2017 | Never finaled issued May 2017, no final | 940 Hayes St | apt c. ground floor renovation including additoin of bedroom, laundry, bathroom. renovation to existing kitchen & bath, new lighting. no exterior changes. n/a maher ordinanceDetails
apt c. ground floor renovation including additoin of bedroom, laundry, bathroom. renovation to existing kitchen & bath, new lighting. no exterior changes. n/a maher ordinance | $30,000 |
| Feb 7, 2017 | Completed final sign-off Jul 2017 | 940 Hayes St | renovation of apartment #28 including new bedroom, new laundry, revised bathroom & kitchen, new lighting, revised heating. maher naDetails
renovation of apartment #28 including new bedroom, new laundry, revised bathroom & kitchen, new lighting, revised heating. maher na | $30,000 |
| Dec 20, 2016 | Completed final sign-off Mar 2017 | 701 Fell St | unit #2 : renovation of apartment on 2nd level. renovate kitchen, bath, installation of new laundry, and lighting revisions. n/a for maher.Details
unit #2 : renovation of apartment on 2nd level. renovate kitchen, bath, installation of new laundry, and lighting revisions. n/a for maher. | $30,000 |
| Dec 15, 2016 | Never finaled issued Jan 2017, no final | 400 Page St | renovation of unit 100,101 & 302 including addition of 1 bedroom, renovation of kitchen, bath, relocate of partitions, installation of new laundry closet. lighting and heating revisions. unit 100 on the 2nd level, 101 on the 3rd level and 302 on the 4th.Details
renovation of unit 100,101 & 302 including addition of 1 bedroom, renovation of kitchen, bath, relocate of partitions, installation of new laundry closet. lighting and heating revisions. unit 100 on the 2nd level, 101 on the 3rd level and 302 on the 4th. | $60,000 |
| Nov 10, 2016 | Completed final sign-off Jul 2018 | 942 Hayes St | #26 - renovation of (e) apt incl new bedroom, renovated kitchen & bath new laundry, new lighting, revised heating, no exterior work. adding 3 smoke detectors, 2nd floor.Details
#26 - renovation of (e) apt incl new bedroom, renovated kitchen & bath new laundry, new lighting, revised heating, no exterior work. adding 3 smoke detectors, 2nd floor. | $30,000 |
| Oct 5, 2016 | Completed final sign-off Jan 2017 | 701 Fell St | unit #6 & #19 - renovation of kitchen & bath. relocate (e) bedroom, lighting revisions, partitions, doors & new laundry. n/a maher ordinanceDetails
unit #6 & #19 - renovation of kitchen & bath. relocate (e) bedroom, lighting revisions, partitions, doors & new laundry. n/a maher ordinance | $75,000 |
| Oct 5, 2016 | Completed final sign-off Jan 2017 | 940 Hayes St | unit #6 & #17 - each unit: renovation of kitchen & bath. addition of bedroom, new partitions, doors, lightings & laundry. n/a maher ordinanceDetails
unit #6 & #17 - each unit: renovation of kitchen & bath. addition of bedroom, new partitions, doors, lightings & laundry. n/a maher ordinance | $75,000 |
| Sep 28, 2016 | Completed final sign-off Dec 2016 | 701 Fell St | unit 3: renovation of kitchen and bath, addition of new bedroom, relocation of partitions, installation of new laundry closet. lighting revisions, revision to e heatingDetails
unit 3: renovation of kitchen and bath, addition of new bedroom, relocation of partitions, installation of new laundry closet. lighting revisions, revision to e heating | $30,000 |
| Sep 14, 2016 | Never finaled issued Oct 2016, no final | 980 Bush St | 2/f #208 & 3/f #400- addition of one bedroom, renovation of kitchen, bathroom, relocation of partitions, install new laundry closet, lighting revisions and revision of (e) heating. unit 208 on 2nd floor and 400 is on 3rd story. maher naDetails
2/f #208 & 3/f #400- addition of one bedroom, renovation of kitchen, bathroom, relocation of partitions, install new laundry closet, lighting revisions and revision of (e) heating. unit 208 on 2nd floor and 400 is on 3rd story. maher na | $50,000 |
| Jun 17, 2016 | Completed final sign-off Oct 2016 | 701 Fell St | unit #10: renovation on on 2nd level,of (e)kitchen,full bath,relocation of partitions,installation of (n) laundry closet,lighting revisions & revisions to (e)heating.add new bedroom,minor structural revisions; no exterior work. maher n/aDetails
unit #10: renovation on on 2nd level,of (e)kitchen,full bath,relocation of partitions,installation of (n) laundry closet,lighting revisions & revisions to (e)heating.add new bedroom,minor structural revisions; no exterior work. maher n/a | $50,000 |
| May 20, 2016 | Completed final sign-off Oct 2016 | 701 Fell St | for units #1 & #15 - renovate kitchen, bath, relocate partitions, new laundry, lighting revisions, electrical revisions and replacement of (e) heating. addtition of (n) bedroom for unit 1Details
for units #1 & #15 - renovate kitchen, bath, relocate partitions, new laundry, lighting revisions, electrical revisions and replacement of (e) heating. addtition of (n) bedroom for unit 1 | $75,000 |
| May 10, 2016 | Completed final sign-off Sep 2016 | 940 Hayes St | renovation of apartment #12 and #32 on 3rd floor, #22 and #24 on 2nd floor. renovation of kitchen, bath, relocation of partition, installation of new laundry closet, lighting revisions and replacement of (e) heating. added bedrooms.Details
renovation of apartment #12 and #32 on 3rd floor, #22 and #24 on 2nd floor. renovation of kitchen, bath, relocation of partition, installation of new laundry closet, lighting revisions and replacement of (e) heating. added bedrooms. | $75,000 |
| Mar 31, 2016 | Completed final sign-off Jul 2016 | 2207 Fillmore St | apt. #2: residential renovation including revised kitchen, revised bath, revised bedroom, & revised lighting. replace 3 extg windows to match extg in front.Details
apt. #2: residential renovation including revised kitchen, revised bath, revised bedroom, & revised lighting. replace 3 extg windows to match extg in front. | $40,000 |
| Feb 29, 2016 | Completed final sign-off May 2016 | 1221 Jones St | fixtures & finishes replacement at penthouse unit, including kitchen & 2 bathrooms; maher n/aDetails
fixtures & finishes replacement at penthouse unit, including kitchen & 2 bathrooms; maher n/a | $90,000 |
| Feb 23, 2016 | Completed final sign-off Mar 2016 | 2207 Fillmore St | replacing fixtures & finishes in kitchen & bathroomDetails
replacing fixtures & finishes in kitchen & bathroom | $26,000 |
| Jan 12, 2016 | Completed final sign-off Feb 2016 | 720 Jones St | work in unit #31: replace fixtrues and finishes in kitchen and bath.Details
work in unit #31: replace fixtrues and finishes in kitchen and bath. | $25,000 |
| Dec 11, 2015 | Expired or cancelled withdrawn Jan 2016 | 720 Jones St | unit 31, replace finishes, fixtures, move 1 wass 30"; renovate bath & kitchen. maher naDetails
unit 31, replace finishes, fixtures, move 1 wass 30"; renovate bath & kitchen. maher na | $25,000 |
| Jul 22, 2015 | Completed final sign-off Aug 2015 | 861 Sutter St | apt 506: replace kitchen cabinets, flooring, tile, fixtures & paint. replace tile & fixtures in kitchen & bathroom.Details
apt 506: replace kitchen cabinets, flooring, tile, fixtures & paint. replace tile & fixtures in kitchen & bathroom. | $40,000 |
| Mar 11, 2015 | Completed final sign-off May 2015 | 1221 Jones St | unit 6f & 8f: refurbishing finishes, cabinets, appliances & floorings. no walls moved, removed or added. all existing layouts to remain unchanged, shower valve replacement in bathrooms.Details
unit 6f & 8f: refurbishing finishes, cabinets, appliances & floorings. no walls moved, removed or added. all existing layouts to remain unchanged, shower valve replacement in bathrooms. | $45,000 |