S C Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Sep 2007 to Jun 2025
- Last 24 months
- 2 permits filed
11 permits since 2000: 11 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 10, 2025 | Completed final sign-off Jan 2026 | 356 Mount Vernon Av | remove posts, add new beam in the first flDetails
remove posts, add new beam in the first fl | $15,000 |
| Jan 14, 2025 | Completed final sign-off Jan 2026 | 356 Mount Vernon Av | convert 1st fl to 2 bedrooms, 1 bath, game room, wet bar and 1 car garage. extend the existing deck in the rear. less than 30" height. replace and relocate water heater and furnace.Details
convert 1st fl to 2 bedrooms, 1 bath, game room, wet bar and 1 car garage. extend the existing deck in the rear. less than 30" height. replace and relocate water heater and furnace. | $50,000 |
| Jul 7, 2022 | Completed final sign-off Jan 2023 | 838 Capitol Av | interior remodel on 1st flr, remodel (e) kitchen and (e) bathroom; add a bedroom and a study room.Details
interior remodel on 1st flr, remodel (e) kitchen and (e) bathroom; add a bedroom and a study room. | $50,000 |
| Aug 24, 2018 | Completed final sign-off Nov 2018 | 3434 Irving St | rev to pa# 201711063198; correct habitable space calculate error to exclude halls, & utility areas, reflect reduced rm sizes after voluntary struct strengthening. document const changes to approved plans, change ba3 to show only, add laundry & 2nd storage rm in lieu of approved new hall.Details
rev to pa# 201711063198; correct habitable space calculate error to exclude halls, & utility areas, reflect reduced rm sizes after voluntary struct strengthening. document const changes to approved plans, change ba3 to show only, add laundry & 2nd storage rm in lieu of approved new hall. | $120,000 |
| Nov 6, 2017 | Completed final sign-off Nov 2018 | 3434 Irving St | room down addition, expand habitable space on g/f garage area, remodel (e) and new space to include family room, 2 bedrooms, 2 bathroom, laundry room and storage room. voluntary structural strengtheing on gr lvl.Details
room down addition, expand habitable space on g/f garage area, remodel (e) and new space to include family room, 2 bedrooms, 2 bathroom, laundry room and storage room. voluntary structural strengtheing on gr lvl. | $55,000 |
| Oct 25, 2017 | Completed final sign-off Jun 2018 | 3434 Irving St | 2nd fl: convert full bath to master beroom en suite bath. expand half bath to include shower. add outlets, network & tv cable, recessed lights to living room, dining room, bedrooms.Details
2nd fl: convert full bath to master beroom en suite bath. expand half bath to include shower. add outlets, network & tv cable, recessed lights to living room, dining room, bedrooms. | $20,000 |
| Oct 3, 2017 | Completed final sign-off Jun 2018 | 3434 Irving St | kitchen remodeling. replace cabinets, countertop, tile floor, and light outlet.Details
kitchen remodeling. replace cabinets, countertop, tile floor, and light outlet. | $20,000 |
| Oct 14, 2010 | Completed final sign-off Jan 2011 | 638 Niagara Av | kitchen replace cabinet, floor tiles, non structural, lighting to comply with cec 150(k)Details
kitchen replace cabinet, floor tiles, non structural, lighting to comply with cec 150(k) | $10,000 |
| Aug 19, 2010 | Completed final sign-off Dec 2010 | 319 Pope St | kitchen: replace drywall, cabinets, floor tile, replace electrical & plumbing. (min. 50% of kitchen lighting wattage be high efficacy) bathroom: replace wall & floor tile, replace sink & toilet. (provide high efficacy lights or "manual on" occupancy sensor) living room & bedroom replace drywall.Details
kitchen: replace drywall, cabinets, floor tile, replace electrical & plumbing. (min. 50% of kitchen lighting wattage be high efficacy) bathroom: replace wall & floor tile, replace sink & toilet. (provide high efficacy lights or "manual on" occupancy sensor) living room & bedroom replace drywall. | $25,000 |
| Dec 21, 2007 | Completed final sign-off Dec 2007 | 346 Mount Vernon Av | revision to app#200709142729. to delete electrical work from scope of work per insepctor instructions.Details
revision to app#200709142729. to delete electrical work from scope of work per insepctor instructions. | |
| Sep 14, 2007 | Completed final sign-off Dec 2007 | 346 Mount Vernon Av | repair the dryrot wood and stucco at front bay overhang. replace main electrical serviceDetails
repair the dryrot wood and stucco at front bay overhang. replace main electrical service | $3,000 |