S C Anderson Group International Inc.
- Based in
- Bakersfield
- On San Francisco permits
- Feb 2011 to Dec 2024
- Last 24 months
- 1 permit filed
23 permits since 2000: 17 completed, 1 in progress, 5 never finaled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 4, 2024 | Completed final sign-off Dec 2025 | 58 Carmelita St | revision to 202307182404: provide detail of porch framing & front view detail 2/s2.2Details
revision to 202307182404: provide detail of porch framing & front view detail 2/s2.2 | |
| Apr 24, 2024 | In progress issued Apr 2024 | 1545 Broadway | unit 305: removel of partial drywall and insullation in kitchen, living room, master bedroom, hallway and bathroom. no structural removals or alterations. reinstallation of 5/8" type x gyp. to be under separate permit.Details
unit 305: removel of partial drywall and insullation in kitchen, living room, master bedroom, hallway and bathroom. no structural removals or alterations. reinstallation of 5/8" type x gyp. to be under separate permit. | $30,000 |
| Jul 18, 2023 | Completed final sign-off Dec 2025 | 58 Carmelita St | in-kind fire repair: rr damaged insulation, finishes & drwall throughout residence. replace damaged roof & floor framing only. replace exterior doors, windows & siding. to comply with nov202303631.Details
in-kind fire repair: rr damaged insulation, finishes & drwall throughout residence. replace damaged roof & floor framing only. replace exterior doors, windows & siding. to comply with nov202303631. | $500,000 |
| Feb 20, 2020 | Completed final sign-off Jun 2020 | 458 Castro St | partial compliance of nov #201901751. demolition of fire damage stairs at exterior rear of bldg. demolition of fire damaged roof per plan. frame to shrink wrap temporary roof for weather protection.Details
partial compliance of nov #201901751. demolition of fire damage stairs at exterior rear of bldg. demolition of fire damaged roof per plan. frame to shrink wrap temporary roof for weather protection. | $60,000 |
| Feb 14, 2020 | Completed final sign-off Jul 2020 | 145 Jefferson St | no structural. demo of gypson and cabinetry thru restaurant due to water damage and mold remedication cover by licensed contractor. ada under ti per ab-017Details
no structural. demo of gypson and cabinetry thru restaurant due to water damage and mold remedication cover by licensed contractor. ada under ti per ab-017 | $300,000 |
| Jan 29, 2019 | Never finaled issued Jan 2019, no final | 3150 Buchanan St | insulation, drywall, paint, flooring repair. all work in living room. all non structural.Details
insulation, drywall, paint, flooring repair. all work in living room. all non structural. | $9,000 |
| Nov 19, 2018 | Completed final sign-off Aug 2021 | 119 Steiner St | unit 119 b - to comply with nov 201836081 - restoration of a single damily dweling aft er fire incident scope restoration & remodel of living rm, kitchen, service porch & bathroom. no changes to exterior or other unitsDetails
unit 119 b - to comply with nov 201836081 - restoration of a single damily dweling aft er fire incident scope restoration & remodel of living rm, kitchen, service porch & bathroom. no changes to exterior or other units | $185,972 |
| Sep 21, 2017 | Completed final sign-off Aug 2018 | 2170 Harrison St | drywall repair & flooring with a few cabinets replaced. repair in-kind. n/a for maher.Details
drywall repair & flooring with a few cabinets replaced. repair in-kind. n/a for maher. | $30,000 |
| Aug 23, 2017 | Never finaled issued Aug 2017, no final | 750 Howard St | scope of work: selective waterproofing repairs at e crescent pond. work includes remove ex heavily corroded damaged strucural steel angle support and replace with hot dipped galvaized steel angel as req below the existing crescent pond concrete slab and existing corrugated steel decking. new steelDetails
scope of work: selective waterproofing repairs at e crescent pond. work includes remove ex heavily corroded damaged strucural steel angle support and replace with hot dipped galvaized steel angel as req below the existing crescent pond concrete slab and existing corrugated steel decking. new steel | $1,000,000 |
| Apr 17, 2017 | Completed final sign-off Jun 2017 | 255 Broadway | remove and replace 3,000 s/f drywall(wet), 2500 s/f laminate flooring, 1.000 s/f vinyl flooring.Details
remove and replace 3,000 s/f drywall(wet), 2500 s/f laminate flooring, 1.000 s/f vinyl flooring. | $100,000 |
| Jan 25, 2016 | Completed final sign-off Jun 2017 | 2664 Filbert St | drywall & insulation repair on blind wall on rear, left side at all levels for water damage. approx 30lf wall per floor. replace (e) lath & plaster blind wall interior face with 3/8in cdx plywood & 5/8in gysm. board.Details
drywall & insulation repair on blind wall on rear, left side at all levels for water damage. approx 30lf wall per floor. replace (e) lath & plaster blind wall interior face with 3/8in cdx plywood & 5/8in gysm. board. | $20,000 |
| Jun 4, 2015 | Completed final sign-off Feb 2016 | 300 03rd St | redo (e) kitchen - no change to the floor plan of (ex) locations of appliances & fixtures/no wall to be removed. new counter tops - granite installed - sd per code. new angle stop valves. new sound barrier flooring (e) receptacles and smoke detectors brought up the code. n/a maher ord. # 155-13Details
redo (e) kitchen - no change to the floor plan of (ex) locations of appliances & fixtures/no wall to be removed. new counter tops - granite installed - sd per code. new angle stop valves. new sound barrier flooring (e) receptacles and smoke detectors brought up the code. n/a maher ord. # 155-13 | $40,000 |
| Mar 24, 2015 | Never finaled issued Mar 2015, no final | 459 Paris St | remove non bearing walls, floor joists and floor sheathing, plumbing, fixtures. relocate plumbing fixtures. new 5/8 type xDetails
remove non bearing walls, floor joists and floor sheathing, plumbing, fixtures. relocate plumbing fixtures. new 5/8 type x | $10,000 |
| Jan 31, 2014 | Completed final sign-off May 2014 | 28 Bellair Pl | 5/8 sheetrock drywall patch & paint due to water damage on both levels. electrical & plumbing code upgrade to 2 bathrooms, 2 laundry rooms, new sub panel, water heatersDetails
5/8 sheetrock drywall patch & paint due to water damage on both levels. electrical & plumbing code upgrade to 2 bathrooms, 2 laundry rooms, new sub panel, water heaters | $25,000 |
| Oct 15, 2013 | Completed final sign-off Dec 2013 | 340 11th St | comply with nov 201323491. erect scaffold for public protection on city sidewalk in front of bldg. diagonal wall supports to non reinforced masonry wall in interior side of front wallDetails
comply with nov 201323491. erect scaffold for public protection on city sidewalk in front of bldg. diagonal wall supports to non reinforced masonry wall in interior side of front wall | $25,000 |
| Mar 27, 2013 | Completed final sign-off Oct 2013 | 165 Madrone Av | repair damaged drywall, remove existing kitchen cabinets, plumbing under counter liting & appliances. install new cabinets, counter tops, hardwood floor, appliances, painting, remove kitchen & island sink, lighting shall comply with title 24Details
repair damaged drywall, remove existing kitchen cabinets, plumbing under counter liting & appliances. install new cabinets, counter tops, hardwood floor, appliances, painting, remove kitchen & island sink, lighting shall comply with title 24 | $23,000 |
| Jan 16, 2013 | Never finaled issued Jan 2013, no final | 4552 19th St | removal of drywall, insulation, cabinet and water heater due to mold. abate mold & reinstall 1/2 sheet rock (non rated walls) and cabinets. work to be in 5 rooms & stairwell & pantry & master closet. all work in kind.Details
removal of drywall, insulation, cabinet and water heater due to mold. abate mold & reinstall 1/2 sheet rock (non rated walls) and cabinets. work to be in 5 rooms & stairwell & pantry & master closet. all work in kind. | $10,000 |
| Apr 20, 2012 | Completed final sign-off Dec 2012 | 1748 Clay St | fire remediation/restoration, no new scope, hazardous materials abatement, some new electrical, code complaint main panel access, some new doors & windows, mandatory barrier-free upgrades, mep under separate permit.Details
fire remediation/restoration, no new scope, hazardous materials abatement, some new electrical, code complaint main panel access, some new doors & windows, mandatory barrier-free upgrades, mep under separate permit. | $97,000 |
| Feb 27, 2012 | Completed final sign-off Apr 2012 | 2225 Bay St | break stucco @ window and 1 sliding glass door to repair water leak in building paper/flashing. replace insulation and sheetrock and paint @ basement level water damaged area only. no window or door replacementDetails
break stucco @ window and 1 sliding glass door to repair water leak in building paper/flashing. replace insulation and sheetrock and paint @ basement level water damaged area only. no window or door replacement | $2,200 |
| Dec 16, 2011 | Never finaled issued Dec 2011, no final | 333 Taylor St | replace/install sheetrock in stair will due to damage from water leak on the 6th floor. 2-hr fire rated. area of work(s) stair will - basement to the 6th floor.Details
replace/install sheetrock in stair will due to damage from water leak on the 6th floor. 2-hr fire rated. area of work(s) stair will - basement to the 6th floor. | $6,500 |
| Sep 29, 2011 | Completed final sign-off Nov 2011 | 227 07th St | minor fire damage in kitchen of unit 506. no structural work to be performed in units 506,406,306 hallway 5th fl water damage repairDetails
minor fire damage in kitchen of unit 506. no structural work to be performed in units 506,406,306 hallway 5th fl water damage repair | $32,000 |
| Sep 27, 2011 | Completed final sign-off Nov 2011 | 56 Julian Av | water damaged sheetrock in stairwell, insulation and flooring (approx. 1200 sq. ft.) in hallway of residential area.Details
water damaged sheetrock in stairwell, insulation and flooring (approx. 1200 sq. ft.) in hallway of residential area. | $14,500 |
| Feb 22, 2011 | Completed final sign-off Mar 2011 | 254 Montana St | siding repair lower 3' on side & rear elevations. bathroom-drywall, paint, install (n) vanity & toilet & vinyl floor tiles.Details
siding repair lower 3' on side & rear elevations. bathroom-drywall, paint, install (n) vanity & toilet & vinyl floor tiles. | $15,000 |