Rudd Kitchen And Bath
- Based in
- San Francisco
- On San Francisco permits
- Jul 2013 to May 2026
- Last 24 months
- 8 permits filed
35 permits since 2000: 35 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 20, 2026 | Completed final sign-off Aug 2026 | 1256 Lombard St | primary bathroom remodel. replace in kind, including existing shower pan.Details
primary bathroom remodel. replace in kind, including existing shower pan. | $35,000 |
| Jan 30, 2026 | Completed final sign-off May 2026 | 1256 Lombard St | main floor guest bath remodel, replace in kind, no location changesDetails
main floor guest bath remodel, replace in kind, no location changes | $30,000 |
| Sep 10, 2025 | Completed final sign-off Dec 2025 | 695 Grand View Av | unit 202.kitchen remodel replace cabinets and flooring in kind.Details
unit 202.kitchen remodel replace cabinets and flooring in kind. | $25,000 |
| Jul 14, 2025 | Completed final sign-off Dec 2025 | 186 Carnelian Wy | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $29,000 |
| Mar 27, 2025 | Completed final sign-off Sep 2025 | 219 Clipper St | main level/upper level en suite: 1 bathroom remodel. replace in-kind. no location changes, no exterior workDetails
main level/upper level en suite: 1 bathroom remodel. replace in-kind. no location changes, no exterior work | $25,000 |
| Mar 18, 2025 | Completed final sign-off Sep 2025 | 219 Clipper St | main level/upper level: 1 bathroom remodel. replace in-kind. no location changes, no exteior workDetails
main level/upper level: 1 bathroom remodel. replace in-kind. no location changes, no exteior work | $25,000 |
| Dec 7, 2024 | Completed final sign-off May 2025 | 3715 Folsom St | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $25,000 |
| Oct 29, 2024 | Completed final sign-off Jan 2025 | 219 Clipper St | kitchen remodel in kind. no wall removal. fixtures to remain in same location. approx. 160 sq ft.Details
kitchen remodel in kind. no wall removal. fixtures to remain in same location. approx. 160 sq ft. | $32,000 |
| Apr 14, 2024 | Completed final sign-off Nov 2024 | 1695 21st Av | in-kind remodeling of 2 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 1st fl with 1 shower pan(s). | $50,000 |
| Apr 14, 2024 | Completed final sign-off Oct 2024 | 79 Eastwood Dr | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $25,000 |
| Dec 7, 2023 | Completed final sign-off Apr 2024 | 688 Duncan St | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $25,000 |
| Oct 11, 2023 | Completed final sign-off Jan 2024 | 274 Parnassus Av | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $25,000 |
| Jun 24, 2023 | Completed final sign-off Oct 2023 | 79 Eastwood Dr | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $25,000 |
| Dec 6, 2022 | Completed final sign-off May 2023 | 1056 Haight St | replace kitchen cabinets and appliances in kind. no location changes.Details
replace kitchen cabinets and appliances in kind. no location changes. | $18,000 |
| Sep 6, 2022 | Completed final sign-off May 2023 | 258 Hearst Av | (1) bathroom repair. gut to studs. install freestanding bathtub, replace shower tile, replace fixtures in kind.Details
(1) bathroom repair. gut to studs. install freestanding bathtub, replace shower tile, replace fixtures in kind. | $26,000 |
| May 16, 2022 | Completed final sign-off Nov 2022 | 1575 Waller St | repairs to 2 upper floor bathrooms. convert tub to shower in master bath. replace mixing valves, floor tile, wall tile in bath spaces. replace vanities, toilets, lighting, vent fans in kind. no location changes.Details
repairs to 2 upper floor bathrooms. convert tub to shower in master bath. replace mixing valves, floor tile, wall tile in bath spaces. replace vanities, toilets, lighting, vent fans in kind. no location changes. | $57,000 |
| Oct 5, 2021 | Completed final sign-off Oct 2021 | 140 College Av | rev to pa201304094078: remove reviouisly approved approved skylights (8) but installed 2. remove unpermitted bathroom window.Details
rev to pa201304094078: remove reviouisly approved approved skylights (8) but installed 2. remove unpermitted bathroom window. | |
| Dec 24, 2020 | Completed final sign-off Apr 2021 | 140 College Av | roof truss design. to satisfy special inspection requirements (sec 24 f) and schedule final inspection for pa 201304094078. all work is complete.Details
roof truss design. to satisfy special inspection requirements (sec 24 f) and schedule final inspection for pa 201304094078. all work is complete. | $1,000 |
| Oct 9, 2020 | Completed final sign-off Feb 2021 | 716 San Jose Av | replace shower tile and pan onlyDetails
replace shower tile and pan only | $8,000 |
| Oct 1, 2020 | Completed final sign-off Jan 2021 | 124 Eugenia Av | convert closet space on main floor bedroom to 1/2 bath with sink and toilet.relocate door from bedroom wall to hallway wall.replce tub/wall tile in main floor master bath and new double vanity.replce wall tile/shower pan in lower floor full bath.expand (e) storage.relocate laundry to lower.Details
convert closet space on main floor bedroom to 1/2 bath with sink and toilet.relocate door from bedroom wall to hallway wall.replce tub/wall tile in main floor master bath and new double vanity.replce wall tile/shower pan in lower floor full bath.expand (e) storage.relocate laundry to lower. | $45,000 |
| Sep 24, 2019 | Completed final sign-off Oct 2019 | 3741 22nd St | replace (e) vinyl window in shower area at rear of dwelling on third floor. no changes to size or operation.Details
replace (e) vinyl window in shower area at rear of dwelling on third floor. no changes to size or operation. | $1,000 |
| Jun 28, 2019 | Completed final sign-off Dec 2019 | 3741 22nd St | remodel 3rd floor master bath. relocate toilet 12" to n. convert single vanity to double. new shower pan membrane. new floor & wall tiles. repair to 3rd fl guest bath. no location changes. replace tub, toilet, vanity, wall & floor tiles. replace fans in kind in bath.Details
remodel 3rd floor master bath. relocate toilet 12" to n. convert single vanity to double. new shower pan membrane. new floor & wall tiles. repair to 3rd fl guest bath. no location changes. replace tub, toilet, vanity, wall & floor tiles. replace fans in kind in bath. | $32,000 |
| Mar 14, 2019 | Completed final sign-off May 2019 | 1 Daniel Burnham Ct | revisions to pa 201812107843. convert single sink vanity to double. add 6 led lights fixtures. add wall light and gfi outlet near hallway vanity.Details
revisions to pa 201812107843. convert single sink vanity to double. add 6 led lights fixtures. add wall light and gfi outlet near hallway vanity. | $3,000 |
| Dec 10, 2018 | Completed final sign-off May 2019 | 1 Daniel Burnham Ct | kitchen and bath repair, remove replace cabinets, flooring, appliances, remove tub & convert to shower, replace hallway vanity, add 220v/30a circut "110/204 microwave circuit, retile floors shower walls, add branch circuit for washlet, create pass through window in non-bearing wallDetails
kitchen and bath repair, remove replace cabinets, flooring, appliances, remove tub & convert to shower, replace hallway vanity, add 220v/30a circut "110/204 microwave circuit, retile floors shower walls, add branch circuit for washlet, create pass through window in non-bearing wall | $40,000 |
| Nov 15, 2018 | Completed final sign-off Jul 2020 | 140 College Av | to obtain a final inspection for work approved under pa 201601217613, 200607287880, 200110110518. all work is complete.Details
to obtain a final inspection for work approved under pa 201601217613, 200607287880, 200110110518. all work is complete. | |
| Sep 18, 2018 | Completed final sign-off Feb 2019 | 19 Brompton Av | main floor kitchen remodel- gut to studs & sub fl. replace cabinets & counters. add dish washer & desposal, relocate stove, add gas fireplace insert, relocate range hood on (e) duct, add 5 ohled lights add (2) pendent lights, add microwave, all electrical to connect to subpanels,Details
main floor kitchen remodel- gut to studs & sub fl. replace cabinets & counters. add dish washer & desposal, relocate stove, add gas fireplace insert, relocate range hood on (e) duct, add 5 ohled lights add (2) pendent lights, add microwave, all electrical to connect to subpanels, | $26,000 |
| Aug 17, 2018 | Completed final sign-off Nov 2018 | 66 Bradford St | bathroom repair on ground floor,, remove (e) cedar wall wall and floor covering as necessary, remove (e) fixed glass panel, frame closed. install (4) led ceiling lights. install (1) wall light above sink, add glass partition to shower, tile (e) curbless shower walls, relocate shower headDetails
bathroom repair on ground floor,, remove (e) cedar wall wall and floor covering as necessary, remove (e) fixed glass panel, frame closed. install (4) led ceiling lights. install (1) wall light above sink, add glass partition to shower, tile (e) curbless shower walls, relocate shower head | $15,000 |
| Aug 24, 2017 | Completed final sign-off Oct 2017 | 45 Gladys St | kitchen repair. no location changes, replace cabinets, counter, flooring, appliances. new 50a/220v circuit for stove. add 1 receptacle per code. add 2 sets led lights. add overhead led light, retrofit existing ceiling lights w/led modules. no changes to mechanical. no change to rough plumbing.Details
kitchen repair. no location changes, replace cabinets, counter, flooring, appliances. new 50a/220v circuit for stove. add 1 receptacle per code. add 2 sets led lights. add overhead led light, retrofit existing ceiling lights w/led modules. no changes to mechanical. no change to rough plumbing. | $16,000 |
| Jul 11, 2017 | Completed final sign-off Oct 2017 | 953 14th St | remove showerpan replace with morter pan tile walls, retile floors, replace vanity new pressure balance shower valve, no changes to rough electrical replace light fixturesDetails
remove showerpan replace with morter pan tile walls, retile floors, replace vanity new pressure balance shower valve, no changes to rough electrical replace light fixtures | $11,000 |
| Jul 10, 2017 | Completed final sign-off Oct 2018 | 377 Paris St | remodel bathroom, enlarge bathroom by removing non load bearing wall, new tub, new shower valve, replace galvanized with copper, rewire 20a gfi, 15a afi light circuits, add 15a afi for smoke detectors, new sink, rotate toilet flange, tile floor & walls, new fan on (e) duct. legalize g/f bathroomDetails
remodel bathroom, enlarge bathroom by removing non load bearing wall, new tub, new shower valve, replace galvanized with copper, rewire 20a gfi, 15a afi light circuits, add 15a afi for smoke detectors, new sink, rotate toilet flange, tile floor & walls, new fan on (e) duct. legalize g/f bathroom | $15,000 |
| Mar 7, 2017 | Completed final sign-off Apr 2017 | 953 14th St | replace leaking shower valve w/ pressure balance unit. retile tub stall. repair drywall & trim as necessary. no electrical. no mechanical. as necessary to repair damage. repair dry rot.Details
replace leaking shower valve w/ pressure balance unit. retile tub stall. repair drywall & trim as necessary. no electrical. no mechanical. as necessary to repair damage. repair dry rot. | $4,000 |
| Dec 29, 2015 | Completed final sign-off May 2016 | 150 Day St | remove walls, ceiling, floors, replace toilet ,vanity,tub. electrical as nedded for design /code. replace showe rvalve, install vent fan if possible. replace (e) window sashes, no change to exterior.Details
remove walls, ceiling, floors, replace toilet ,vanity,tub. electrical as nedded for design /code. replace showe rvalve, install vent fan if possible. replace (e) window sashes, no change to exterior. | $12,000 |
| Apr 24, 2015 | Completed final sign-off Jul 2015 | 116 Banks St | 2nd floor full bath - remove tile on floor, walls. remove drywall. no location changes. replace tub, toilet, sink. add vent fan with humidistat. change light fixture. retle floor, walls. insulate walls 7 ceiling.Details
2nd floor full bath - remove tile on floor, walls. remove drywall. no location changes. replace tub, toilet, sink. add vent fan with humidistat. change light fixture. retle floor, walls. insulate walls 7 ceiling. | $9,000 |
| Mar 3, 2014 | Completed final sign-off May 2014 | 169 Valley St | upper unit: remove existing cabinets, countertop. install new cabinets. top flat, one kitchen remodel. add dishwasher, add microwave, add led undercabinet lighting. terminate (e) gas line at appliance light and reconnect to (e) stove. no structural, location, mechanical or flooring changes.Details
upper unit: remove existing cabinets, countertop. install new cabinets. top flat, one kitchen remodel. add dishwasher, add microwave, add led undercabinet lighting. terminate (e) gas line at appliance light and reconnect to (e) stove. no structural, location, mechanical or flooring changes. | $4,000 |
| Jul 31, 2013 | Completed final sign-off Nov 2013 | 597 Buena Vista West Av | kitchen repair-no structural changes ,remove existing cabinets & flooring,add 5 new circuits, & undercabinet lighting,change drain outlet, orientation &gas valve access,add ventilaton hood for stove(connect to (e) exhaust) add dishwasher,add lower&upper cabinets ,tile & backsplash.Details
kitchen repair-no structural changes ,remove existing cabinets & flooring,add 5 new circuits, & undercabinet lighting,change drain outlet, orientation &gas valve access,add ventilaton hood for stove(connect to (e) exhaust) add dishwasher,add lower&upper cabinets ,tile & backsplash. | $9,000 |