Roofix Technologies Llc
- Based in
- Fort Worth
- On San Francisco permits
- Feb 2024 to Dec 2025
- Last 24 months
- 4 permits filed
5 permits since 2000: 4 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 18, 2025 | Completed final sign-off Apr 2026 | 1501 15th Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $7,992 |
| Oct 30, 2025 | In progress filed Oct 2025, not yet issued | 1501 15th Av | comp out-remove clay tile, install asphalt shingles where solar panels are being installed, 8.69 sq (860 sq. ft.), clay tiles to be reinstalled. crrc#0668-0153Details
comp out-remove clay tile, install asphalt shingles where solar panels are being installed, 8.69 sq (860 sq. ft.), clay tiles to be reinstalled. crrc#0668-0153 | $7,993 |
| Aug 28, 2025 | Completed final sign-off Sep 2025 | 75 Zircon Pl | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $13,870 |
| Apr 9, 2025 | Completed final sign-off Apr 2025 | 2090 Bay Shore Bl | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $16,351 |
| Feb 29, 2024 | Completed final sign-off Mar 2024 | 154 Stillings Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $8,440 |