Permit GraphShortlistSan Francisco building permits since 2000

Romkon Inc

Contractor license
620277
State license record
Based in
San Francisco
On San Francisco permits
Dec 2005 to Jan 2025
Last 24 months
1 permit filed

16 permits since 2000: 7 completed, 4 in progress, 5 never finaled.

Of the 5 never-finaled permits, 5 are 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllStairs 2
FiledOutcomeAddressWork described on the permitDeclared cost
Jan 16, 2025In progress
issued Nov 2025
562 28th Avrev to pa 201705055838. admin correction on unit count (6du + 2adu) and construction type (3a). horizontal addition to expand living and dining area of the rear units @ 2nd to 4th flr. add balcony to the rear units @ 2nd to 4th flr. horizontal addition to add master bedroom at the rear unit at 4/f.
Details
Permit
202406124332
Status
issued
Filed
Jan 16, 2025
Permit issued
Nov 17, 2025
Declared cost
$75,000
Address
562 28th Av

rev to pa 201705055838. admin correction on unit count (6du + 2adu) and construction type (3a). horizontal addition to expand living and dining area of the rear units @ 2nd to 4th flr. add balcony to the rear units @ 2nd to 4th flr. horizontal addition to add master bedroom at the rear unit at 4/f.

Open the permit page

$75,000
Jan 19, 2024In progress
issued Jan 2024
562 28th Avpermit for permeation grouting of soils along the existing foundation. ref pa 201705055838
Details
Permit
202401194304
Status
issued
Filed
Jan 19, 2024
Permit issued
Jan 19, 2024
Declared cost
$10,000
Address
562 28th Av

permit for permeation grouting of soils along the existing foundation. ref pa 201705055838

Open the permit page

$10,000
Jan 19, 2024In progress
issued Jan 2024
568 28th Avpermit for permeation grouting of soils along the existing foundation
Details
Permit
202401194306
Status
issued
Filed
Jan 19, 2024
Permit issued
Jan 19, 2024
Declared cost
$10,000
Address
568 28th Av

permit for permeation grouting of soils along the existing foundation

Open the permit page

$10,000
Nov 21, 2023In progress
issued Jan 2024
562 28th Avrevision to bpa#201705055838, revision of property line details. provide detail at stair footing.
Details
Permit
202311211240
Status
issued
Filed
Nov 21, 2023
Permit issued
Jan 11, 2024
Declared cost
$2,000
Address
562 28th Av

revision to bpa#201705055838, revision of property line details. provide detail at stair footing.

Open the permit page

$2,000
Sep 1, 2020Never finaled
issued Sep 2020, no final
1856 Pacific Avadmin permit only: evacuation signage for pa# 201805038115 & 201909202253
Details
Permit
202009013173
Status
issued
Filed
Sep 1, 2020
Permit issued
Sep 14, 2020
Address
1856 Pacific Av

admin permit only: evacuation signage for pa# 201805038115 & 201909202253

Open the permit page

Sep 20, 2019Completed
final sign-off Aug 2020
1856 Pacific Avchanging winding stairs to striaght stairs for access to roof
Details
Permit
201909202253
Status
complete
Filed
Sep 20, 2019
Permit issued
Oct 3, 2019
Final sign-off
Aug 11, 2020
Address
1856 Pacific Av

changing winding stairs to striaght stairs for access to roof

Open the permit page

Dec 21, 2018Completed
final sign-off Aug 2020
1856 Pacific Avto comply with nov 201814751. (temporary walls storage area ground floor 10 x 20
Details
Permit
201812218962
Status
complete
Filed
Dec 21, 2018
Permit issued
Dec 21, 2018
Final sign-off
Aug 11, 2020
Declared cost
$500
Address
1856 Pacific Av

to comply with nov 201814751. (temporary walls storage area ground floor 10 x 20

Open the permit page

$500
Oct 16, 2018Completed
final sign-off Aug 2020
1856 Pacific Avadministrative permit (no work to document) the soft story work, compply with soft story nov 201402021, withdraw soft story pa# 201612064256, seismic work under 201003299153; soft story retrofit/sfebc chapter 4d: 2016 cebc appendix a4
Details
Permit
201810163360
Status
complete
Filed
Oct 16, 2018
Permit issued
Oct 16, 2018
Final sign-off
Aug 11, 2020
Address
1856 Pacific Av

administrative permit (no work to document) the soft story work, compply with soft story nov 201402021, withdraw soft story pa# 201612064256, seismic work under 201003299153; soft story retrofit/sfebc chapter 4d: 2016 cebc appendix a4

Open the permit page

Jul 13, 2018Never finaled
issued Dec 2018, no final
1856 Pacific Av6" underground fire sprinkler line to the building. sprinklers separate permit.
Details
Permit
201807134573
Status
issued
Filed
Jul 13, 2018
Permit issued
Dec 12, 2018
Declared cost
$5,000
Address
1856 Pacific Av

6" underground fire sprinkler line to the building. sprinklers separate permit.

Open the permit page

$5,000
May 3, 2018Completed
final sign-off Aug 2020
1856 Pacific Avrevision to 201003299153 changing door location on units 1,2,5,6-common wall to other wall. changing units 1 & 5 from 2 bedroom to 1 bedroom. changing units 2 & 6 from 1 bedroom to 2 bedroom. moving door in units 1 & 2 for bedroom access. moving door in units 5 & 6 from common wall to bedroom wall.
Details
Permit
201805038115
Status
complete
Filed
May 3, 2018
Permit issued
Dec 17, 2019
Final sign-off
Aug 11, 2020
Address
1856 Pacific Av

revision to 201003299153 changing door location on units 1,2,5,6-common wall to other wall. changing units 1 & 5 from 2 bedroom to 1 bedroom. changing units 2 & 6 from 1 bedroom to 2 bedroom. moving door in units 1 & 2 for bedroom access. moving door in units 5 & 6 from common wall to bedroom wall.

Open the permit page

Jan 12, 2018Never finaled
issued Jul 2019, no final
1856 Pacific Avper adu unit ordinance# 162-16, convert ground floor and basement level spaces to 5 adus. structural work covered by separate permit.
Details
Permit
201801128565
Status
issued
Filed
Jan 12, 2018
Permit issued
Jul 11, 2019
Declared cost
$250,000
Address
1856 Pacific Av

per adu unit ordinance# 162-16, convert ground floor and basement level spaces to 5 adus. structural work covered by separate permit.

Open the permit page

$250,000
May 5, 2017Never finaled
issued May 2021, no final
562 28th Avto erect 4 stories, 1 basement, 6 dwelling units bldg.
Details
Permit
201705055838
Status
issued
Filed
May 5, 2017
Permit issued
May 13, 2021
Declared cost
$1,800,888
Address
562 28th Av

to erect 4 stories, 1 basement, 6 dwelling units bldg.

Open the permit page

$1,800,888
May 5, 2017Never finaled
issued May 2021, no final
562 28th Avto demolish a three stories of a single family dwelling
Details
Permit
201705055832
Status
issued
Filed
May 5, 2017
Permit issued
May 13, 2021
Declared cost
$5,000
Address
562 28th Av

to demolish a three stories of a single family dwelling

Open the permit page

$5,000
Mar 29, 2010Completed
final sign-off Aug 2020
1856 Pacific Avinterior modifications to (e) 4th floor rear unit & construction of new 5th floor to create a 2 level penthouse unit. modifications to (e) bldg elevation at pacific ave. to comply with his novs# 200561975, 200447279 & 200454985.
Details
Permit
201003299153
Status
complete
Filed
Mar 29, 2010
Permit issued
Mar 14, 2017
Final sign-off
Aug 11, 2020
Declared cost
$400,000
Address
1856 Pacific Av

interior modifications to (e) 4th floor rear unit & construction of new 5th floor to create a 2 level penthouse unit. modifications to (e) bldg elevation at pacific ave. to comply with his novs# 200561975, 200447279 & 200454985.

Open the permit page

$400,000
Dec 24, 2007Completed
final sign-off Jul 2008
168 Hyde Stadditional construction details added to approved application#200405063246 s1
Details
Permit
200712241260
Status
complete
Filed
Dec 24, 2007
Permit issued
Jan 10, 2008
Final sign-off
Jul 23, 2008
Address
168 Hyde St

additional construction details added to approved application#200405063246 s1

Open the permit page

Dec 28, 2005Completed
final sign-off Mar 2006
322 31st Avrepair front porch/steps that were damaged by truck/repiar in kind/damage on right side gaurdrail only per photograph/this work was previously approved per app #200511238907 but was cancelled
Details
Permit
200512281155
Status
complete
Filed
Dec 28, 2005
Permit issued
Dec 28, 2005
Final sign-off
Mar 28, 2006
Declared cost
$3,500
Address
322 31st Av

repair front porch/steps that were damaged by truck/repiar in kind/damage on right side gaurdrail only per photograph/this work was previously approved per app #200511238907 but was cancelled

Open the permit page

$3,500